Cover Sheet
Client
Cons
SHUAIBAH
WATER AND ELECTRICITY COMPANY
ultin
g
Engi
neer THE CONSORTIUM OF SIEMENS AKTIENGESELLSCHAFT.
DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.,Ltd
s
PC
Shuaibah IWPP - WATER PROJECT
Owner's Engineer
Contractor
Project
Date
Name
Prepared
Checked
Approved
Dept.
Type of Doc.
Title
Contents Code
Reg. No.
Dept.
Rev.
Unit
Offer Var
Version
Opt.
Page-No.
Total 8 sheets
C
B
A
-
Rev.
Date
Signature
Remarks
PROC. No.:
REV . :
PAGE :
Table of Contents
Scope Scope
AbbreviAbbreviation
Refere Reference
Respons
Responsibility
Attach Attachments
M.S. HWANG
H.B. KIM
J.S. GAHNG
PREPARED
BY
Engineer
REVIEWED
BY
Sec.Mgr
APPROVED
BY
Gen.Mgr
Revision
2 of 18
0
1.0
PROC. No.:
3 of 18
REV . :
PAGE :
Scope
This procedure defines the procedure for qualifying welder and welding operators
and maintaining their qualification to meet the project specification, code and
standard for the construction of Shuaibah IWPP Project in Shuaibah ( Saudi Arabia )
2.0
Abbreviation
WPS : Welding Procedure Specification
3.0
Reference
ASME Section : Welding and Brazing Qualification
4.0
5.0
Responsibility
4.1
4.2
Shuaibah Site Ham Chang QA/QC Manager is responsible for ensuring that this procedure is
correctly followed by ongoing monitoring and/or auditing of subcontractors.
4.3
Shuaibah Site Ham Chang QA/QC Manager shall notify the welder qualification test to Client
for his witness, whether done on site or elsewhere.
5.2Upon receipt of request for welder qualification test, Shuaibah Site Ham Chang QA/QC
Engineer shall provide the WPS or test specification and inform the test schedule
to subcontractor.
The subcontractor shall provide the materials which will be used for welder qualification test.
6.0
Prior to commencing of welding, Shuaibah Site Ham Chang QA/QC Engineer shall instruct
welders to weld test piece. Shuaibah Site Ham Chang QA/QC Engineer may stop welding
in any step when the welder is considered unable to make a sound weld.
6.2
The completed weld test coupon shall be examined and tested in accordance with
PROC. No.:
4 of 18
REV . :
PAGE :
the applicable code and/or standard. Shuaibuh Site Ham Chang QA/QC Engineer shall
check the operation using the Welder Qualification Test Witness Requisition/Report
of the test and make identify test coupon.
7.0
6.3
For nondestructive examination, the test coupon shall be sent to NDE subcontractor
by subcontractor. The examination report shall be sent to Shuaibuh Site Ham Chang
Discipline after approval of applicable NDE level II or III personnel.
6.4
For destructive test, the test coupon shall be prepared in accordance with the
requirement as specified ASME BPV Section IX, QW-463.2(a) and/or (b) by
subcontractor.The test report shall be sent to Shuaibuh Site Ham Chang
QA/QC Discipline after approval in accordance with ASME BPV Section IX,
QW-160 and QW-180.
8.0
9.0
Reviewing the Welding Material Issue Slip and subcontractor's record of welder
qualification tests, the Shuaibuh Site Ham Chang QA/QC Engineer shall update the Qualified
Welder List two (2) month basis to add newly qualified welders, remove welder
whose qualifications have expired, and extend the expiration date.
Attachments
9.1
9.2
9.3
9.4
Certificate of Qualification,
9.5
150mm
300mm
2. Pipe
Material : A53-B
Thickness : 6" Sch. 40
150mm
3. Test Position
Plate All Vertical
Pipe
PROC. No.:
REV . :
PAGE :
5 of 18
0
PROC. No.:
REV . :
PAGE :
6 of 18
0
Applicant
No.
Applicant Name
ID No.
HWQT-91
IN SEOUB JUNG
HQW-001
Prepared By
Requisition No. :
Base Metal
WPS No
Welding
Process
Position
WP-T-002/017
FCAW+SAW
2G
Date
Test Date :
Result of Visual
Spec.
Th'k
P-No.
A516-70
27mm
Checked By
July.28.2007
Pass
Date
Fail
Page
1 of 1
Test Method
Reason
RT
Approved By
Bend
Test
Others
Remarks
Date
Applicant
Name
Prepared By
Subcon Name :
ID No.
WPS No
Date
Welding
Process
Requisition No. :
Test Date :
Base Metal
Position
Spec.
Checked By
Th'k
Page
Result of Visual
P-No.
Pass
Date
Fail
Reason
of
Test Method
RT
Approved By
Bend
Test
Others
Remarks
Date
NO
.
Name
2007.
( J. S. PARK )
Position
40
Mohammad Ali ( )
52
Nawazish Ali ( )
18
Rifas ()
140
Hussain Cheroor ( )
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Attendance
WORKING ORDER
NO
.
Name
2007.
( Y. K. KIM )
Position
Beeran ()
Mohammed Ali ( )
Gouthaman ()
16
Zubair ()
17
Nizar T ( T)
121
Rana Bahad ( )
124
Iqbal ()
131
Shalid Al Salam ( )
10
137
Abdul Khalik ( )
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Attendance
WORKING ORDER
NO
.
Name
2007.
( M. G. GO )
Position
15
Mahindar ()
58
Mehmood Ahamed ( )
46
Abdul Manaf -1 ( )
47
Aboobacker ()
49
Kunhi Mohammad ( )
50
Ummer ()
60
Abdul Majid ( )
61
Khalil ()
10
104
Ali Poolakunnan ( )
11
105
Mohammad Mehfooz ( )
12
106
Thoyub Ulla ( )
13
117
Mojeebu Rehman ( )
14
118
Yonus Hossain ( )
15
86
Salahudeen ()
16
87
Mujeeb Rahman ( )
17
88
Noushad ()
18
89
Mohammad Rafeeq ( )
19
90
Abdul Manaf -2 ( )
20
101
Umair Padiysath ( )
21
102
Ibrahim ()
22
103
Sakeer Hussain ( )
23
24
Abdul Gafoor ( )
97
Jafar ()
25
99
Abdul Razak ( )
26
141
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Alamgir Hossain ( )
Attendance
WORKING ORDER
NO
.
Name
2007.
Position
( T. G. LEE )
( H. K. KIM )
( S. Y. KIM )
( J. S. YU )
( B. M. GO )
( D. J. JEONG )
20
Said Muhammed ( )
21
Sajeed ()
34
Hamza ()
10
35
Harun Ur Rashid ( )
11
37
Moovan Dharma ( )
12
38
Shabodeen ()
13
39
Vilanathan ()
14
75
Abdul Azeez ( )
15
77
Ismail ()
16
81
Usman Balat ( )
17
122
Motiuur Rahman ( )
18
125
19
126
Salim Ali ( )
20
127
Shakeeb Ul Salam ( )
21
128
Noor Alim ( )
22
129
Mahabat Rahman ( )
23
130
Jamal Miya ( )
24
135
Janir Ali ( )
25
146
M. Mohshin (M. )
26
147
27
136
28
145
Iblahim Syed ( )
29
30
31
32
33
34
35
36
37
38
39
40
42
S. Blast
Attendance
WORKING ORDER
.
Name
NO
2007.
( J. C. BYEON )
Position
Usman ()
31
Abdul Noor ( )
32
Homayn ()
56
Hamza Parambath ( )
57
Mohammad Saukat ( )
62
Joher Ali ( )
63
Mohammad Sahab ( )
82
Waheed Al Salam ( )
10
100
Shareef ()
11
142
Kalam MD Samsul ( MD )
12
54
Mohammad Hakam ( )
13
25
Mohammad Azhar ( )
14
71
Shahid Ali ( )
15
72
Said Mohammad ( )
16
123
17
80
18
132
Mohammad Sohel ( )
19
133
Muhammad Raees ( )
20
143
MD Arip ( MD )
40T
21
144
Abdul Razak ( )
14T
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
Mhdai Salim ( )
Mujeeb Ali ( )
14T
7T
10T
Attendance
WORKING ORDER
Welder Name
NO
2007.
Welder ID
No.
Position
Welding
Process
HQW-002
2G
SMAW
IN SEOUB JUNG ( )
HQW-001
2G&3G
SMAW
SMAW
SAW
FCAW
SMAW
SMAW
FCAW
HO JUN JIN ( )
HQW-003
2G&3G
1G
3G
HQW-004
2G&3G
HQW-005
2G&3G
2G
6G
SMAW+GTAW
JE HYEON JEON ( )
24
Mohammad ASLAM ( )
HQW-006
2G
2G
23
LIAKAT Ali ( )
HQW-007
2G&3G
29
MODIUDDIN ()
HQW-011
2G&3G
SMAW
FCAW
SMAW
10
27
AZEEZ UL HAQ ( )
HQW-012
2G&3G
2G
11
30
CHUNNU MIYAH ( )
HQW-014
3G
SMAW
SMAW
FCAW
SMAW
12
42
Abu Al Kalam ( )
HQW-015
2G
SMAW
13
43
MOHAMED MOTIN ( )
HQW-016
2G
SMAW
14
44
Abdusalam()
HQW-017
2G&3G
SMAW
15
ABDUL Sukkur ( )
HQW-020
1G
SAW
16
65
Babul Huasin ( )
HQW-021
3G
SMAW
17
67
Biplob ()
HQW-026
3G
SMAW
18
68
Mojafor ()
HQW-027
3G
SMAW
19
69
Somser All ( )
HQW-028
3G
Abdul Alim ( )
HQW-032
6G
2G
2G
SMAW
GTAW
FCAW
FCAW
2G
FCAW
2G
FCAW
2G
FCAW
1G
SAW
1G
SAW
20
79
21
109
Aneed Shaikh ( )
22
113
Jamal Hussain ( )
23
114
Abdul Hameed ( )
24
111
Noor Alam ( )
25
120
Lipton ()
26
112
Luqman Hussain ( )
27
116
Nazur Lslan ( )
28
110
Roni Ahmad ( )
29
108
Saukat Hussain ( )
30
115
Mohammad Mehroot ( )
31
119
Sehkia Kadmat ( )
32
12
Rafeek Ansari ( )
HQW-037
33
91
Mohammad Rafi ( )
34
95
Ashraf ()
35
96
Mohammad Ali ( )
36
70
Abdul Rahees ( )
37
76
Mohammad ()
38
39
HQW-038
Attendance
WORKING ORDER
WORKING ORDER
Crater
()
Crack
()
Over Lap
( )
Under Cut
( )
Blow Hole/Porosity
( /)
Tungsten Inclusion
/ ( )
Slag lnclusion
( )
Incomplete Penetration
( )
Lack of Fusion
( )
Root Concavity
( )/
Root Convexity
( )
( DEFECT CODE )
N.O
No Defect
I.P
Incomplete Penetration
Slag Inclusion
L.F
Lack of Fusion
Po
Porosity
Cr
Crack
U.C
Under Cut
R.C
Root Concavity
R.CV
Root Convexity
Tungsten Inclusion
M.M
Miss Match
B.D
Basematal Defect
O.R
Over Lap
D.B
Debris
Q/C DEPARTMENT
Radiographic Report
for
( Potable Water Storage Tank )
Project Name.
: Shuaibah IWPP
Tank No.
: C
Tank Name.
: Potable Water Storage Tank
Reference DWG. No. :W05009-XF00-GKB-554001