Comparison of Generation, Import & Plant Load

The document compares power generation, import, and plant load data from 2011-12 and 2012-13. Generation was generally higher in 2012-13 except for June, September, and October. Import was higher in 2012-13 for most months except April, July, and August. Plant load was also generally higher in 2012-13 except for June, August, and September. Major turbine downtime occurred in both years ranging from 16 to 35 days for individual turbines.

Uploaded by

Isradani Mj
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

Comparison of Generation, Import & Plant Load

The document compares power generation, import, and plant load data from 2011-12 and 2012-13. Generation was generally higher in 2012-13 except for June, September, and October. Import was higher in 2012-13 for most months except April, July, and August. Plant load was also generally higher in 2012-13 except for June, August, and September. Major turbine downtime occurred in both years ranging from 16 to 35 days for individual turbines.

Uploaded by

Isradani Mj
Copyright
© © All Rights Reserved
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 8

Comparison of

Generation, Import & Plant Load

2011-12 & 2012-13

Comparison on Oct12 Bill


Without
R&C
Gross energy
consumed

39884
MVAh

Recorded MD

191.6 MVA

Energy consumed
in Peak hrs.

6556 MVAh

Exceeded Peak

NA

Normal MD
Charges in Lakhs

` 479.00

Normal Energy
Charges in Lakhs

` 1786.04

Penal MD Charges
in Lakhs

` 405.81

w.r.t R&C 12.09.12

w.r.t R&C 7.11.12

39884 MVAh

39884 MVAh

Off Peak : 191.6MVA


Peak : 162.8MVA

Off Peak : 191.6MVA


Peak : 162.8MVA

6556 MVAh

6556 MVAh

2424 MVAh

3356 MVAh

` 479.00

` 479.00

` 1786.04

` 1786.04

` 1164.50

` 3066.50

` 384.93

Penal Energy
Charges in Lakhs

NA

Total Bill in lakhs

` 2670.86

` 3814.47

` 6130.95

` 6.69

` 9.56

` 15.37

Cost Rs./unit

` 799.40

Comparison of RMD (MVA)


2011-12

Reason

2012-13

Reason

April

91.60

May

Zero Generation at TPP


168.40 09.05.11(zero power due to
tripping of AL-1 & AL-2)

145.60

Jun

139.20 No/low coal flow on 19.06.11

109.20

July

120.40

114.80

Aug

116.80

138.40

Zero Generation at TPP on


23.08.12(Reactor failure at GSB)

Sept

134.40

175.20

No/low coal flow on 08.09.12 (rain)

Oct

114.80

191.60

No/low coal flow on 04.10.12(rain)

Nov

115.20

Dec

138.80

Jan

100.40

Feb

111.60

Mar

149.20

97.20
TG4,BPTG-1&2,GETG-1, COB4
tripped on 30.05.12(Bus2/MRS
tripped due L6L1)

No/low coal flow on


30.12.11

Zero Generation at TPP on


24.03.12(zero power due to
tripping of AL-1 & AL-2,fog)
3

Comparison of Generation & Import (MW)


Generation

Import

2011-12

2012-13

Increase

2012-13

2012-13

Increase

Apr

197.81

233.12

35.31

22.71

21.18

-1.53

May

173.46

209.16

35.70

47.56

46.02

-1.54

Jun

218.46

199.37

-19.08

34.80

48.72

13.92

July

210.81

225.13

14.32

34.58

29.37

-5.20

Aug

203.5

209.09

5.58

40.85

30.67

-10.18

Sept

185.95

155.76

-30.19

52.95

83.00

30.05

Oct

207.2

193.58

-13.61

39.62

50.77

11.15

Nov

214.03

28.18

Dec

223.28

23.98

Jan

213.79

33.22

Feb

231.45

23.59

Mar

222.4

28.05
4

Comparison of Plant Load (MW)


2011-12

2012-13

increase

Apr

219.94

254.10

34.16

May

221.01

255.13

34.12

Jun

253.17

248.08

-5.09

July

245.27

254.44

9.16

Aug

244.15

239.65

-4.50

Sept

238.85

238.75

-0.09

Oct

246.724

244.26

-2.46

Nov

242.04

Dec

247.01

Jan

246.87

Feb

245.91

Mar

250.37
5

Major TGs Downtime


TG 1

TG 2

TG 3

29.08.11 to
13.09.11

07.05.11 to
26.05.11

02.08.11 to
08.08.11

26.09.11 to
30.09.11

01.10.11 to
10.10.11

27.12.11 to
05.01.12

30 days

17 days

TG 4

19.11.11 to
21.10.11
23.01.12 to
31.01.12
2011-12

2012-13

32 days

09.05.12 to
29.06.12

08.09.12 to
16.09.12

23.07.12 to
29.07.12

18.09.12 to
19.09.12

23.08.12 to
29.08.12

02.10.12 to
06.10.12

35 days

16 days
6

Thank You

Comparison of Generation, Import & Plant Load (MW)


Generation

Import

Plant Load

2011-12

2012-13

2011-12

2012-13

2011-12

2012-13

Apr

197.81

233.12

22.71

21.18

219.94

254.10

May

173.46

209.16

47.56

46.02

221.01

255.13

Jun

218.46

199.37

34.80

48.72

253.17

248.08

July

210.81

225.13

34.58

29.37

245.27

254.44

Aug

203.5

209.09

40.85

30.67

244.15

239.65

Sept

185.95

155.76

52.95

83.00

238.85

238.75

Oct

207.2

193.58

39.62

50.77

246.724

244.26

Nov

214.03

28.18

242.04

Dec

223.28

23.98

247.01

Jan

213.79

33.22

246.87

Feb

231.45

23.59

245.91

Mar

222.4

28.05

250.37
8