Spillway
Spillway
Spillway
130.00 ft
3.00
50.00 ft
0.040
141.00 NGVD
ELEVATION [NGVD}
12.00
11.00
10.00
9.00
8.00
7.00
0.00
500.00
1000.00
1500.00
2000.00
2500.00
FLOW [CFS]
OUTPUT:
SELECTED
Yc
Ac
Qc
Vc
Hec
[ft]
[ft]
[ft]
[cfs]
[fps]
[ft]
[ft]
0.00
Hp
0.00
0.25
32.69
131.50
92.5
2.83
0.37
0.02559
0.85
0.57
75.07
133.42
319.6
4.26
0.85
0.00856
1.22
0.75
99.19
134.50
483.3
4.87
1.12
0.00594
1.45
1.00
133.00
136.00
746.3
5.61
1.49
0.00406
1.79
1.15
153.47
136.90
922.0
6.01
1.71
0.00338
2.00
1.97
267.74
141.82
2087.5
7.80
2.91
0.00166
3.16
2.58
355.37
145.48
3151.7
8.87
3.80
0.00116
4.02
3.39
475.18
150.34
4793.7
10.09
4.97
0.00081
5.17
5.15
749.07
160.90
9171.3
12.24
7.48
0.00047
7.65
(8) Sc = 14.56nA/(R1.33)T,
(2) Ac = (b + ZYc)Yc,
(3) Vc = SQRT(gA/T),
(7) a = (4.32n)/Hec1.33,
(4) T = b + 2ZYc
* The Critical Flow Equations were obtained from SCS TR-2 dated 1956 and the Handbook of Hydraulics (Brater & King, 6 ed., page 8-16).
Hp
Yc
L
SPILLWAY PROFILE
Yc
2000.00
2500.00
b
SPILLWAY CROSS SECTION
Sc
[ft]
[ft/ft]
ELEV
141.00
0.25
0.0371
141.85
0.56
0.0283
142.22
0.74
0.0258
142.45
0.98
0.0235
142.79
1.12
0.0225
143.00
1.88
0.0190
144.16
2.43
0.0174
145.02
3.14
0.0160
146.17
4.61
0.0142
148.65
.33
)T,
(b + 2YcSQRT(1 + Z)),
SPILLWAY FLOW C
ELEVATION [NGVD}
150.00
148.00
146.00
144.00
142.00
140.00
138.00
136.00
0.00
2000.00
4000.00
FLOW [CFS
4000.00
6000.00
FLOW [CFS]
8000.00
10000.00
10000.00