Bill of Materials
Bill of Materials
Location:
Subject: BILL OF MATERIAL
Item
Description
I.
Steel Framing
C- channel 6"x6"x3/16 for framming
Anchor Bolt w/ 12m dia
Base plate 20mm 350x350
II.
Concrete Works
2.1 Formworks
2.1.1 Ord. Plywood 3/8'' thk.
2.1.2 Coco-Lumber 2'' x 3'' x 12' - 450pcs.
2.1.3 Coco-Lumber 2'' x 3'' x 12' - 535pcs.
2.1.4 CWN 4''
2.1.5 CWN 3''
2.1.6 CWN 2''
2.2 Rebars
2.2.1 16mm dia. X 6.00 meters
2.2.2 12mm dia. X 6.00 meters
2.2.3 10mm dia. X 6.00 meters
2.2.4 # 16 G.I. Tie Wire
2.3 Concrete
2.3.1 Cement
2.3.2 Sand
2.3.3 Crushed Gravel 3/4''
III.
Masonry Works
3.1 CHB Llaying
3.1.1 Cement
3.1.2 Sand
3.1.3 CHB 5'' thk.
3.1.4 CHB 4'' thk.
3.1.5 Rebar 12mm dia. X 6.00 meters
3.1.6 Rebar 10mm dia. X 6.00 meters
3.1.7 Waterproofing Cement (25kilos/bag)
IV.
Qty.
Unit
Wood Works
5.1 Ceiling
5.1.1 Good Lumber 2'' x 2'' x 8' - 46 pcs.
5.1.2 Good Lumber 2'' x 2'' x 12' - 68 pcs.
5.1.3 Hardiflex Plywood 1/4'' thk.
5.1.4 Hardiflex Nail 1''
5.1.5 CWN 2''
5.1.6 CWN 3''
5.1.7 Stikwel (Wood Glue)
5.1.8 Good Lumber 1'' x 1'' 8' - 60 pcs.
5.1.9 Plyboard 3/4'' thk.
5.2 Staircase
5.2.1 Good Lumber 2'' x 12'' x 14' - 5 pcs.
5.2.2 Square Bar 20mm
5.2.3 Square Bar 16mm
5.2.4 Square bar 12mm
5.2.5 Flat Bar 3/16'' x 1''
5.2.6 Welding Rod 1/8
5.2.7 Red Oxide Primer
5.2.8 Solid Wood Handrail 3'' x 6'' 12' KD
5.2.9 Wood Screw 1'' (Flat Head)
VI.
VII.
Tile Works
7.1 T & B
7.1.1 Unglazed Cer. Tiles 8'' x 8''
7.1.2 Glazed Cer. Tiles 8'' x 8''
7.1.3 Listel
7.1.4 Cement
7.1.5 ABC Cement Grout
7.2 Ground Floor
7.2.1 Cer. Floor Tiles 16'' x 16''
7.2.2 Cement
Plumbing Works
9.1 Fixtures
9.1.1 Stainless Kitchen Sink
9.1.2 Lavatory
9.1.3 Water Closet
9.1.4 Cer. Soap Holder
9.1.5 Cer. Tissue Holer
9.1.6 Shower Head
9.2 Sanitary Water Lines
9.3 Sewer Lines
9.4 Septic Tank
9.4.1 Excavation
9.4.2 Backfilling
Electrical
10.1 Wires and Cable
10.1.1 # 10 AWG Wire
10.1.2 # 14 AWG Wire
10.2 Switches
10.2.1 One Gang Switches
10.2.2 Two Gang Switches
10.2.3 Three Gang Switches
10.3 Outlet
10.3.1 Double Power Outlet
10.3.2 ACU Outlet
10.3.3 Ref Outlet
10.3.4 Range Outlet
10.3.5 Lighting Outlet
10.4 Conduit
10.4.1 20mm x 3M. Conduit Pipe
10.4.2 12mm x 3M. Conduit Pipe
10.5 Safety Switches
10.6 Panel Board
10.7 Electrical Tape
Total Material Cost(Php):
Unit Cost
Material
Amount
st(Php):
Description
Item
I.
Site Clearing
Excavation
Backfilling/Compaction
Earthfill
cu.m.
1.8
Masonry Works
3.1 CHB Llaying
3.1.1 Cement
3.1.2 Sand
3.1.4 CHB 4'' thk.
VII.
Unit
Earthworks
1.1
1.2
1.3
1.4
III.
Qty.
0.8
bags
cu.m.
pcs.
Tile Works
7.4 Counter Top
7.4.1 Glazed Cer. Tiles 8'' x 8''
7.4.2 Listel
7.4.3 Tile Trim
7.4.4 Cement
7.4.5 ABC Cement Grout
2
1
pcs.
pcs.
pcs.
bag
kilos
Unit Cost
Material
Amount
1000
1,000.00
230
600
7.25
13
0
40
230
65
600.00
0.00
80.00
460.00
65.00