Total Price Unit Price QTY Unit Description S.No
Total Price Unit Price QTY Unit Description S.No
Total Price Unit Price QTY Unit Description S.No
4 Third Ring Rd Project/Commerical Building The work of the concrete structure and buildings
Total Price
Unit price
QTY
Description
Unit
S.No
Prepration
Stint
Stint
Stint
Stint
All preparatory items include a preview preview due diligence site and processing
Consultative office equipment and tools and provide electricity, water and work wall
protection and number 2 plate illuminated for the project, cranes, scaffolding,
guard and work borings and necessary business space and review structural
design
Cleanliness and the evacuation of the site and include the removal of waste and
the roots of the plant and remove any old facilities or trees, if any, and all the
necessary to start a business
Civil works
The general location
Excavation, backfilling and compaction and settlement
2169
m3
303
m3
Includes drilling in all types of soil, including rock materials soil, which coincides
with the drilling of the level of the current location and even the level of depth that
allows to establishment them and dewatering when found necessary to protect and
support aspects of the mechanical and dad to carry out reclamation and
procedures so that the level of the bottom of the floor slab by elevations required
drawings and specifications and the transfer of drilling output to the approved
places and not to use the output of drilling in the rubble as instructed by the
supervising engineer's report and recommendations of the soil
Backfill soil fit your hand and mechanically with the use of water on the layers
every 30 cm according to the plans and specifications and report soil and
instructions
The supply of ordinary concrete is poured armed with a thickness of 150 mm,
including the intensity of wood and leveling up the level of drilling and using sulfur
resistant cement and concrete fracture strength of not less than 250 kg / cm 2 with
a barrier halitosis down foundations thickness of 500 microns
227
m3
2722
m3
m3
383
m3
348
m3
Supply and pour concrete for Bashh including the intensity of wood and fittings
SABIC greased epoxy and preparation surfaces, processing and use of sulfur
resistant cement and not less breakage strength 300 kg / cm 2 after 28 days
Kh.m columns (of the role of the basement until the surface)
comprehensive walls of the elevator
-
- 1745
m3
- 5868
m3
Page 1 of 25
Total Price
Unit price
QTY
Description
Unit
S.No
TOTAL SR
building work
Supply and Building Block Larry discharger (volcanic) and Red Ward vertical
schemes by using cement mortar necessary according to the specifications and
drawings with the work of the corners Gelovanez necessary to install with columns
and beams and installation of iron clasped each Mdemaqin insulator with a foreign
buildings from the inside
4833
m2
m2
Block discharger thickness of 100 mm with the internal walls of the confrontation
external walls
4361
7778
m2
Total SR
Insulation work
-
1315
m2
3798
m2
4360
m2
1327
m2
m2
m2
1171
m2
3798
m2
215
Total SR
Architectural works
The general location
252
385
Supply and poured concrete floors external pier thickness of 100 mm according to
the plans and specifications
Antrlk business facilities as required drawings and specifications
252
73
152
42
Page 2 of 25
Description
S.No
QTY
Unit
Total Price
Unit price
136.00
26.00
88.00
1,968.00 2
312.00 2
1207
1175
8136
2882
1235
759
4012
)(
5159
Epoxy paint 2 3+
6300
35.00 4313
35.00 19740
45.00 19023
1171
SR
45.00 4313
250.00 7479
250.00 758
45.00 1235
3160
250.00 195
1,250.00 324
45
15,000.00 2
45.00 3720
125.00 636
85.00 483
115,000.00 1
SR
Page 3 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
200 ) (SCREW
120 54/44
)(
:
:
)) FCU
"0.2 2
:
:
( FCU-01 ) 6 2400/3
( FCU-02 ) 4 1600/ 3
11
( FCU-03 ) 3 1200/ 3
) (AXIAL 500/3
14
SR
Page 4 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
) (AXIAL
300
1.5 :
:
( )EX.F.-01 12000/24000/ 3
( )EX.F.-02 12000/24000/ 3
( )EX.F.-03 12000/24000/ 3
( )EX.F.-04 12000/24000/ 3
( )EX.F.-05 12000/24000/ 3
0
0
0
0
0
0
0
0
0
0
) (PRESSURIZATION FAN
:
:
( S.F.-1 ) 20000/ 3
( S.F.-1 ) 20000/ 3
40
Page 5 of 25
S.No
Description
Unit
QTY
Total Price
Unit price
BUTTERFLY VALVE 5
BUTTERFLY VALVE 4
BUTTERFLY VALVE 3
BUTTERFLY VALVE 2.5
BALL VALVE 2
BALANCE VALVE 5
BALANCE VALVE 4
BALANCE VALVE 3
BALANCE VALVE 2.5
BALANCE VALVE 2
2
22
12
138
11
69
0
0
0
0
0
0
0
0
0
0
SR
0
0
0
0
0
0
0
0
0
0
0
)(SMACNA
0.6
) (SMACNA
24/ 3 1
Page 6 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
84/ 3 2
"24" 24
32
"20" 20
40
"24" 24
32
"26" 8
200
0.5 3
) (B.M.S.
.
) (BTU-METER
.
Page 7 of 25
73
Description
S.No
Unit
QTY
Unit price
SR
1
2
3
.
.
.
.
5
SDR7.4
) 20(
. ) (
6
7
8
9
10
11
12
uPVC 10
.
.
.
. 6 uPVC
. uPVC
.
.
13
14
.
:
Page 8 of 25
Total Price
Description
S.No
Unit
QTY
Total Price
Unit price
60
.
.
3
.
4
.
50
150
160
81
150
156
SR
. 4
. 4 Garage drain
:
Page 9 of 25
33
Description
S.No
Unit
QTY
Total Price
Unit price
20 SDR7.4
.
32
20
40
20
50
105
63
75
75
165
90
175
110
245
125
20
160
20
32
39
40
50
75
90
110
125
160
SR
Page 10 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
3 10
3
3
20/3 85)1
+1 +1 (
:
.
.
.
) ) ( K.S.B
(
) (
Circulating 2
pumps
. 60/3 20
:
) 6(
180
1,375
330
195
Page 11 of 25
Description
S.No
Unit
3
2
QTY
Unit price
14
Total Price
16
-
: 6060 1.0 -
6060 125
3 3
1.5
) (3
5/ 15
.
1
SR
) 10(
. 4
0.60*0.6
.
. 60*60
60*60
. 90 90
90
.
40
:
Page 12 of 25
1
1
SR
0
0
0
0
0
0
Description
S.No
Unit
QTY
Total Price
Unit price
NFPA
.UL listed & FM approved
3
Shop drawings
)
(.
4
6
7
8
10
) As built
& )
As built (.
NFPA
.
.Inner diameter
.
.
) (.
ASTM A53
40
....
NFPA.
1,359
1.5
2
.
.
750
300
0
0
0
0
2.5
250
Page 13 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
600
900
150
(ZONE
)CONTROL STATION
:
ULFM OS & Y
) (TEST & DRAIN
TAMPER SUPERVISORY SWITCH
) (WATER FLOW SWITCH
1
4
4
0
0
0
SR
1
0
0
0
0
& OS
(Pressure gauge , flow Y
)switch
UL/FM.
6
1
38
) (PENDENT
68 UL/FM
5.6
Page 14 of 25
135
Description
S.No
Unit
UL/FM ) (UPRIGHT
68
5.6
QTY
Unit price
655
Total Price
:
1 30
1.5 1
. 6
44
:
2.5 30
3 2.5
. )(Landing Valve
6
48
)( ) 4/2.52.5(
4
4
.
) (A,B,C 6
.
10 CO2
. 6 Dry Pouder
) ( horizontal split case fire pump
: NFPA 20 UL/FM
750 :/
Page 15 of 25
155
Description
S.No
Unit
125 :
QTY
Unit price
Total Price
SR
)(pump vertical turbine multi_stage jokey
:
75 :/
185 :
:
.
.
.
) - -
. -(
.
Flow metar
main pressure reducing valve
unti-vortex fire pump suction palte with elbows
Page 16 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
2
2.5 4
4
. 6
OS & Y
2.5
80
SR
0
0
1600.. 380/13800- . 50 -/
cable box,b bar box and housing
(
) (RMU )13.8.(
) (R.M.U
L.B.S 630 3
L.B.S 630 1
1
) 380(
. 2500
Page 17 of 25
80
Description
S.No
Unit
13.8..
P.V.C XLPE 120*32
QTY
Unit price
75
Total Price
400.. . 50 -0.8
50/ 380-
- - -
- - - -
12
600
.
MDB-01
MDB-02
EMDB
SR
) (XLPE\PVC
) (UPVC
.
Page 18 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
16+25*4 2
30
16+35*4 2
2,500
70+120*4 2
30
2 )2(4*240+120
20
2 4*240+120
200
2 4*185+95
50
2 4*50+25
60
ELP-B2
ELP-B1
ELP-G
ELP-P1
ELP-P2
ELP-P3
ELP-S
ELP-(TY)F
DB-FAN
DB-PUMP
LP-G
) (P.V.C
16
82
16-
16 )(
26
SR
Page 19 of 25
0
0
Description
S.No
Unit
QTY
Total Price
Unit price
LCP
) (Isolators
:
20 220 -
14
25 220 -
13
32 220 -
60 380 -
60 380 -
400 380 -
100 380 -
250 380 -
60 380 -
60 380 -
76
1 16 -
2 16 -
16
Page 20 of 25
1,180
Description
S.No
Unit
QTY
Total Price
Unit price
.
. ) (
F1
670
F2
120
S1
234
S2
WM1
127
WM2
21
EM1
45
EM2
22
SR
1 (
0.1
) 30/3/( ) (PABX
(S.L.A) 8
400 - 2
Page 21 of 25
Description
S.No
Unit
2 )CAT3(40.6
) (RJ11
QTY
Unit price
12
Total Price
76
40
200
3
30
400
20
HR "32
: 16 DVR DVD writer and RJ45 port & 400-fps recording for
each camera Hard disk calculations should be based
on 2CIF & a fps for (3) month minimum
H-R 3/1
)( auto iris ,varry focal lens
16
IP44
16
21
SR
Page 22 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
) (
750 1*22
225
172
) (
25
) 95/(
27
19
19
:
)(EARL STREAMER
65
.
79
SR
Page 23 of 25
Description
S.No
Unit
QTY
Total Price
Unit price
800 . 22 . 1.75/
- 4
SR
BILL No. 4 Third Ring Rd Project/Commerical BuildingGENERAL SUMMARY
1
2
3
4
5
6
7
8
Page 24 of 25
Summary
0
0
0
0
0
0
0
0
1
2
3
4
5
6
7
8
Page 25 of 25