AL TUWAIRQI HOLDING

SCOPE AND BILL OF QUANTITIES

PR NO. 4290001451

PR SHORT DESCRIPTION : NEW SHED FOR TAMINI TRANSFORMER ROOM AT TCS AREA.

BILL OF QUANTITIES

S.NO DESCRIPTION OF ITEM

ITEM 10 NEW SHED FOR TAMINI TRANSFORMER ROOM AT TCS AREA.

Layout, breaking of asphalt and excavation for foundations to the required level as
1 per drawings and specification including removing of existing walk way. Carting the
excavated material outside the plant.

2 Levelling, Compaction and Dressing of ground Includes water supply for compaction.

3 Supply and laying lean concrete and laying polyethylene sheet 200 micron, .
Supply and fixing of masonry unit using cement mortar, clips, horizontal & vertical
4 rebars and any material or activity required to finish the work as per drawings and
specification.
Supply and pouring of RCC 4000 psi for footing, pedestal, grade beams etc.
including shuttering, rebar fixing and curing as per drawings and specification.
Fabrication of rebars at site spacers and tie wires to be done by contractor and steel
5
to be provided by ASCO. (stright rebar) Fixing additional rebars (welded) to support
the foundation rebars to avoid any movement of footing for anchor bolts by the
contractor.
Contractor has to take concrete cylinders at the time of concrete pouring and have
6 to be tested by the contractor through independent laboratory (28 day compressive
strength). Report has to be submitted by contractor to NASCO team.
Supply, Fixing and fabrication of J-Type anchor bolts, and other embedments; etc.
7
Fixing of templates.
Supply and painting bituminous coats for foundation and pedestal as per drawings
8
and specification.
Supply and installation of hot dip painting (2 coats red oxide and epoxy grey & final
finish) and installation of heavy duty smoke sealed and dust sealed single leaf steel
9 door with vision pannel with frames which includes all required acessories for fixing
i.e.heavy duty hinges,door closer, door lock set roller type, common key etc. as per
standard specification
SUPPLY,FABRICATION AND ERECTION OF STEEL STRUCTURES FOR
TRANSFORMER
Supply,fabrication,painting (2 coats red oxide primer & 2 coats epoxy grey paint)
and erection of HEA 200 x 190 x 6.5 x 10 for steel main column including supply
and fixing of all required bottom and top plate,stiffiners / gusset/shear plate and
1a
bracket /support member sitting arrangement attached to this column with drilling
of holes by magnetic drill machine with supply and fixing of holding bolts connection
/ fasheners and other required accessories as per drawing and specification.
Supply,fabrication,painting (2 coats red oxide primer & 2 coats epoxy grey paint)
and erection of HEA 200 x 190 x 6.5 x 10 for rafter, including supply and fixing of
all required bottom and top plate,stiffiners / gusset/shear plate and bracket /support
2b
member sitting arrangement attached to this rafter with drilling of holes by
magnetic drill machine with supply and fixing of holding bolts connection/fasheners
& other required accessories as per drawing & specification.
Supply,Fabrication,painting (2 coats red oxide primer & 2 coats epoxy grey paint)
and Erection of Rectangular Tube 120 x 60 x 3mm thck. Welded on rafters and
3c
columns serve as purlin & girtz with 1.0m spacing and all required angle/plate
support connection as per drawing & specification.
Supply,Fabrication,painting (2 coats red oxide primer & 2 coats epoxy grey paint)
and Erection of Angle L 100mm x 50mm x mm thck. Welded on column &
4d
rafter supports serve as angle roof bracing with all required gusset/shear
plate connection as per drawing & specification.
Supply,Fabrication,painting (2 coats red oxide primer & 2 coats epoxy grey paint)
and Erection of Angle 2L 100mm x 50mm x mm thck. Welded on column &
5f
supports serve as angle wall bracing with all required gusset/shear plate
connection as per drawing & specification.
Supply and Installation of 0.7mm thick prepainted sheeting rib-type for walls & roof
including complete accessories self drilling scew/revits, corner trim flashing, cap
6g flashing,etc. and all required accesories for fixing. Installation to be made in such
way proper sealing is required to avoid ingress of water during raining
season .including supply and installation of heat insulation.

Cleaning the work area,throwing all construction waste materials and debrisses
7h
away from the plant. / Site Clearance.

ITEM 20 ASPHALTING WORKS FOR TCS TRANSFORMER AREA.

Backfilling, leveling, compaction up to required level as per existing site condition


1
and specification.

Supply ,leveling & compaction of 20 cm thick ( spread into two Layers ) base course
2
including watering

3 Supply & laying of asphalt 12 cm double layer (including MC1 spray & RC2)

Compaction results (after compaction of Marl, after compaction of Base course) and
4
coring test for asphalt to confirm required thickenss.
DURATION / COMPLETION OF WORKS - 30 DAYS (JOB TO BE COMPLETED AS PER MENTION
TIME FRAME,JOB TO BE EXECUTED DURING NORMAL PLANT OPERATION, PROPER PLANNING
NOTE: IS REQUIRED BEFORE & DURING EXECUTION WITHOUT AFFECTING THE PROCESS
PRODUCTION OF PLANT.ALL MATERIAL SAMPLE SHOULD BE SUBMITTED TO CIVIL
DEPARTMENT AND END USER AND APPROVED BEFORE STARTING THE JOB.
WORK SCHEDULE TO BE SUBMITTED PRIOR TO START OF THE WORK,DURATION OF WORKS
WILL START UPON RECEIVING OF WORK PERMIT.
ALL TOOLS, MACHINES, EQUIPMENTS (CRANES/MANLIFTER),HANDLING,
SCAFFOLDING,CONSUMABLES AND ALL SAFETY PPE FOR PEOPLE AND AT WORK DURING
EXECUTION IS ON CONTRACTORS SCOPE.ALL MATERIALS TO BE USE SHOULD GET APPROVAL
FROM END USER OR CIVIL ENGINEER IN CHARGE PRIOR TO SUPPLY AND INSTALLATION.
CONSTRUCTION TO START WORK AFTER RECEIVING WORK PERMIT(S) AND HAS TO SUBMIT
WORK PERMIT(S) PAGE 2 WITH DELIVERY NOTE.

APPROVAL

PREPARED BY :
AL TUWAIRQI HOLDING

SCOPE AND BILL OF QUANTITIES

LOCATION : TCS STORE AREA

NEW SHED FOR TAMINI TRANSFORMER ROOM AT TCS AREA.


DATE : 24TH OCTOBER 2024

BILL OF QUANTITIES

DESCRIPTION OF ITEM UNIT QTY

AMINI TRANSFORMER ROOM AT TCS AREA.

asphalt and excavation for foundations to the required level as


ecification including removing of existing walk way. Carting the M³ 207.00
outside the plant.

on and Dressing of ground Includes water supply for compaction. M² 97.00

an concrete and laying polyethylene sheet 200 micron, . M³ 4.00


masonry unit using cement mortar, clips, horizontal & vertical
erial or activity required to finish the work as per drawings and M² 17.00

of RCC 4000 psi for footing, pedestal, grade beams etc.


, rebar fixing and curing as per drawings and specification.
s at site spacers and tie wires to be done by contractor and steel
M³ 36.00
SCO. (stright rebar) Fixing additional rebars (welded) to support
rs to avoid any movement of footing for anchor bolts by the

ke concrete cylinders at the time of concrete pouring and have


contractor through independent laboratory (28 day compressive Nos 2.00
s to be submitted by contractor to NASCO team.
abrication of J-Type anchor bolts, and other embedments; etc.
Nos 48.00

bituminous coats for foundation and pedestal as per drawings


M² 94.00
on of hot dip painting (2 coats red oxide and epoxy grey & final
on of heavy duty smoke sealed and dust sealed single leaf steel
nel with frames which includes all required acessories for fixing Nos 2.00
s,door closer, door lock set roller type, common key etc. as per
on
ION AND ERECTION OF STEEL STRUCTURES FOR
ainting (2 coats red oxide primer & 2 coats epoxy grey paint)
200 x 190 x 6.5 x 10 for steel main column including supply
uired bottom and top plate,stiffiners / gusset/shear plate and
Lm 93.00
mber sitting arrangement attached to this column with drilling
c drill machine with supply and fixing of holding bolts connection
er required accessories as per drawing and specification.
ainting (2 coats red oxide primer & 2 coats epoxy grey paint)
200 x 190 x 6.5 x 10 for rafter, including supply and fixing of
and top plate,stiffiners / gusset/shear plate and bracket /support
Lm 46.50
ngement attached to this rafter with drilling of holes by
ne with supply and fixing of holding bolts connection/fasheners
cessories as per drawing & specification.
ainting (2 coats red oxide primer & 2 coats epoxy grey paint)
tangular Tube 120 x 60 x 3mm thck. Welded on rafters and
Lm 565.00
urlin & girtz with 1.0m spacing and all required angle/plate
as per drawing & specification.
ainting (2 coats red oxide primer & 2 coats epoxy grey paint)
gle L 100mm x 50mm x mm thck. Welded on column &
Lm 55.00
ve as angle roof bracing with all required gusset/shear
s per drawing & specification.
ainting (2 coats red oxide primer & 2 coats epoxy grey paint)
gle 2L 100mm x 50mm x mm thck. Welded on column &
Lm 115.00
angle wall bracing with all required gusset/shear plate
drawing & specification.
on of 0.7mm thick prepainted sheeting rib-type for walls & roof
accessories self drilling scew/revits, corner trim flashing, cap
required accesories for fixing. Installation to be made in such M² 582.00
s required to avoid ingress of water during raining
pply and installation of heat insulation.

rea,throwing all construction waste materials and debrisses


Ls 1.00
. / Site Clearance.

RKS FOR TCS TRANSFORMER AREA.

compaction up to required level as per existing site condition


Ls 1.00

ompaction of 20 cm thick ( spread into two Layers ) base course


M² 520.00

sphalt 12 cm double layer (including MC1 spray & RC2) M² 520.00

(after compaction of Marl, after compaction of Base course) and


Ls 1.00
alt to confirm required thickenss.
ION OF WORKS - 30 DAYS (JOB TO BE COMPLETED AS PER MENTION
E EXECUTED DURING NORMAL PLANT OPERATION, PROPER PLANNING
& DURING EXECUTION WITHOUT AFFECTING THE PROCESS
NT.ALL MATERIAL SAMPLE SHOULD BE SUBMITTED TO CIVIL
D USER AND APPROVED BEFORE STARTING THE JOB.
BE SUBMITTED PRIOR TO START OF THE WORK,DURATION OF WORKS
CEIVING OF WORK PERMIT.
S, EQUIPMENTS (CRANES/MANLIFTER),HANDLING,
MABLES AND ALL SAFETY PPE FOR PEOPLE AND AT WORK DURING
NTRACTORS SCOPE.ALL MATERIALS TO BE USE SHOULD GET APPROVAL
IVIL ENGINEER IN CHARGE PRIOR TO SUPPLY AND INSTALLATION.
ART WORK AFTER RECEIVING WORK PERMIT(S) AND HAS TO SUBMIT
E 2 WITH DELIVERY NOTE.

APPROVAL

APPROVED BY :
S STORE AREA

CTOBER 2024

REMARK

48 nos M24 -520MM,


TEMPLATES - 45KG

Size of heavy duty single leaf door is


0.90m x 2.20m (Removable Type
Doors)
The Rectangular Tube on both side
should be Removable Type

The sheeting on both side should be


Removable Type

It includes equipment & water


supply for compaction, laying of
marl starting from existing level.
It includes equipment & water
supply for compaction. Gradation of
the material should meet the
requirements of Base Course
Material Class-1 as per Municipality
specification.

It includes equipment & water


supply for compaction.
TAMINI TRANSFORMER ROOM CALCULATIONS
Cutting and Removing of Existing Asphalt 1

EXCAVATION
L B H NOS TOTAL
12.87 1.1 6 84.942
17.16 1.1 6 113.256
2.55 0.6 6 9.18

207.378

POLYTHENE AND COMPACTION

5.04 6 30.24
5.46 6 32.76
5.63 6 33.78

96.78

BACKFILLING AND COMPACTION

207.378 39.53 167.848

158.074
LEAN CONCRETE
NAME L B H NOS TOTAL
4.37 0.075 6 1.9665
4.56 0.075 6 2.052
4.38 0.075 6 1.971

4.0185

Concrete
3.74 0.5 12 22.44
0.25 0.6 12 1.8
3.13 0.6 6 11.268

35.508

SUPPLY AND FIXING OF ANCHOR BOLT


M24 x 48
J - TYPE 520mm

M.S. PLATE KG/M2


5 MM PLATE
0.39 0.24 12 1.1232 39.25

HOLLOW METAL DOORS


0.9 2.2 2 Nos.

HEA 200
200 x 190 x 6.5 x 10
8 6 48
7.5 6 45

TOTAL 93

HEA 200
200 x 190 x 6.5 x 10
7.75 6 46.5

TOTAL 46.5
STEEL TUBES - 120 x 60 x 3mm
31.5 8 252

TOTAL 252

STEEL TUBES - 120 x 60 x 3mm

30.5 7 213.5
7.25 14 101.5

315

TOTAL 313.2

Sheeting L H NOS TOTAL


30.5 7.5 1 228.75
7.25 7.75 2 112.375
31.5 7.75 1 244.125

585.25

581.29

Roof Bracing L 6.8 8 54.4

Wall Bracing 2 L 7.2 16 115.2

Asphalt

519.78 1 519.78

Bituminous
7.8 0.5 6 23.4
6.1 0.5 6 18.3
3.5 12 42
2 0.5 6 6
1.5 0.5 6 4.5

94.2

Block Work
4 0.7 6 16.8
Foundation
Foundation
Beam

Foundation
Foundation
Beam

Deduction For Asphalt

Excavation Area 32.58 0.3 9.774


Foundation 26.22
Foundation 27.36
Beam 26.28

79.86

Foundation
Foundation
Beam

39.5265

TOTAL

44.0856

44.0856

D HOLLOW METAL DOORS (Single PANNEL) (Removable Type)

Column
Column

Rafter
roof

DEDECTION

Long wall
Short wall 0.9 2 1.8 D1

1.8

DEDECTION
Long wall Out Side
Short wall (Removable Type) 0.9 2.2 2 3.96 D1
Roof

3.96
CORPORATE CIVIL PROJECT PO DETAILS

M/S AL-FAISAL STEEL PRODUCTS CO.

RECONDITIONING OF WORKSHOP FLOOR AND EXTENTION OF THE


PR # 4290001206
EXISTING BUILDING

PO # 4350053747 M/s. ACCORD CONTRACTING ESTABLISHMENT.

AFTER

JOB STATUS 98 % JOB COMPLETED

END USER Mr. Ali Ahmed Hariri, ID # 15108

VERIFIED BY Mr. Biju, ID # 13525