Bill of Quontitys For Dyk Wall SR# Particular: 1.0 Excavation
Bill of Quontitys For Dyk Wall SR# Particular: 1.0 Excavation
Bill of Quontitys For Dyk Wall SR# Particular: 1.0 Excavation
DYK WALL
Sr# PARTICULAR
1.0 EXCAVATION
Excavation in foundation for all kinds of soil, dry or wet, hard or soft including of backfilling
excavated earth i/c breaking clods,dressing,dewatering and consolidating by remming in
layers not exceeding 150mm depth to obtain 98% modified AASHTO density including
lifting,shifting or as per instruction and specification of clint.
5.0 Providing
BITUMEN&COATING
Laying 1200 micron thick 10/20 grade of bitumen after one coat of primer
outside foundation including sides and top of footings and walls upto finish ground level
including cost of all material,labour,equipmen etc complete as per drawing and specification
and as directed by the Client (Site Engineer).
6.0 WATER
Providing,STOPPER
placing and fixing in position 230mm wide and 10mm thick PVC water stopper at
all construction joints as per drawing, instruction and specification of the Consultant and
approval of Client ( Site Engineer).
Total Cost
NOTE:
The Quantities taken in this BOQ are estimated, only for bidding purpose. Contractor is responsible to estim
1
drawings & tender documents.
2 Contractor is responsible to add any missing / required item as per scope of works, drawings, specification
3 Contractor is responsible to estimate the quantities before going to purchase the supply items.
In the event of conflict, inconsistency or ambiguity between the contract scope of work, BOQ & Specificatio
4
Specification or any other documents, the Contractor shall refer to the Owner/Engineer whose decision sha
Qty Unit Rate Amount Remark's
28,583,095