Bill of Quontitys For Dyk Wall SR# Particular: 1.0 Excavation

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

BILL OF QUONTITYS FOR

DYK WALL
Sr# PARTICULAR
1.0 EXCAVATION
Excavation in foundation for all kinds of soil, dry or wet, hard or soft including of backfilling
excavated earth i/c breaking clods,dressing,dewatering and consolidating by remming in
layers not exceeding 150mm depth to obtain 98% modified AASHTO density including
lifting,shifting or as per instruction and specification of clint.

2.0 PLAIN CEMENT CONCRETE


Providing and laying Plain cement concrete of specified strength for blinding work using
approved quality 3/4" max. size graded crushed aggregate & fine aggregate of required
properties including approved Steel formwork & its removal, all operations of vibrating,
leveling, compacting and curing etc. complete as per specification & instruction of the
Consultant.
Note:
1. Mix design for each type of sample will be provided by the Contractor
2.1 PCC 1:4:8 (1 cement 4 sand and 8 coarse aggregate) M7.5

3.0 REINFORCED CEMENT CONCRETE


Providing and laying Reinforced cement concrete shall be developed 28 days cylindrical
strength of 4000psi, using approved quality 3/4" max. size graded crushed aggregate &
fine aggregate including approved form work & its removal, all operations of vibrating,
leveling, compacting and curing etc complete but excluding the cost of steel as per
specification & instruction of the Consultant. To confirm the desired cylindrical strength
3000Psi (minimum) at 28days(3+3 minimum at 7 and 28 days) the 6in dia and 12" long
cylinder tests will be carried out by contractor from approved laboratory.
Note:
1. Mix design for each type of sample will be provided by the Contractor

4.0 STEEL REINFORCEMENT


Providing and laying hard grade ribbed deformed(min yield strength 60,000 psi) steel
reinforcement bars including the cost of straightening, cutting, bending, binding, wastage
and such overlaps that are not shown in drawings, placing in position on cement concrete
1:2:4 precast spacer block or m.s chairs,tying with binding wire (GI wire of 18 gauge),
including cost of chairs and wires etc in all kinds of RCC works. Complete in all respect to
the approval of Client (Site Engineer).
4.1 Deformed Steel (60,000psi)

5.0 Providing
BITUMEN&COATING
Laying 1200 micron thick 10/20 grade of bitumen after one coat of primer
outside foundation including sides and top of footings and walls upto finish ground level
including cost of all material,labour,equipmen etc complete as per drawing and specification
and as directed by the Client (Site Engineer).
6.0 WATER
Providing,STOPPER
placing and fixing in position 230mm wide and 10mm thick PVC water stopper at
all construction joints as per drawing, instruction and specification of the Consultant and
approval of Client ( Site Engineer).
Total Cost

NOTE:
The Quantities taken in this BOQ are estimated, only for bidding purpose. Contractor is responsible to estim
1
drawings & tender documents.
2 Contractor is responsible to add any missing / required item as per scope of works, drawings, specification
3 Contractor is responsible to estimate the quantities before going to purchase the supply items.
In the event of conflict, inconsistency or ambiguity between the contract scope of work, BOQ & Specificatio
4
Specification or any other documents, the Contractor shall refer to the Owner/Engineer whose decision sha
Qty Unit Rate Amount Remark's

300.0 m3 1,240 372,000

34.7 m3 2,300 79,695

750.0 m3 21,200 15,900,000

75.0 Tons 160,000 12,000,000

130.0 m2 130 16,900


130.0 RM 1,650 214,500

28,583,095

ctor is responsible to estimate the quantities as per site requirements,


s, drawings, specifications & tender documents.
supply items.
work, BOQ & Specification, National Codes & Standards referenced in
ineer whose decision shall prevail.