Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

AWS Quality Manual Sample No Field Installation PDF

Download as pdf or txt
Download as pdf or txt
You are on page 1of 20

AWS Welding/Fabrication

Quality Manual Sample


(No Field Installation)

Selected Pages Not a Complete Plan

Contact:
First Time Quality
410-451-8006

Pat

[Pick the date]


Questions? Call First Time Quality 410-451-8006

[ImagePlaceHolder]

[CompanyName]
[CompanyAddress1] | [CompanyAddress2]
[CompanyPhone] | [CompanyPhone2]

Fabrication Quality Manual


For Compliance with: _______________

s
ge
Operating Policies of the
[CompanyName] Quality System Pa
Version: 20150308
ed

Version Version notes


ct

20141228 Initial issue


le

Approval Signature and Date: ___________________________________ _____________________


Se

President/ Date

Documents provided by [CompanyName] disclose proprietary information as well as copyright information


registered with the U.S. Patent and Trademark Office. Please hold these documents in confidence and do
not share them with other organizations, even if you do not charge a fee. Submittal of documents does not
transfer copyright ownership.

Page 1
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName] Quality Manual

QUALITY MANUAL
TABLE OF CONTENTS

1. Quality System Management and Responsibilities ............................................................................... 7

1.1. Overview .............................................................................................................................................. 7


1.2. [CompanyName] Quality Policy ........................................................................................................... 7
1.3. Quality Duties, Responsibilities, and Authority ................................................................................... 7
1.4. Quality System Performance Measures .............................................................................................. 9
1.5. Customer Satisfaction Performance Measures ................................................................................. 10
1.6. Exceptions.......................................................................................................................................... 10

2. Job Quality Assurance/Quality Control Planning ................................................................................ 11

s
2.1. Overview ............................................................................................................................................ 11

ge
2.2. [CompanyName] License and Qualification Requirements ............................................................... 11
2.3. QA/QC Personnel and Qualifications ................................................................................................... 1
2.4. Planning of Quality Controlled Work Tasks ......................................................................................... 3
Pa
2.5. Quality Inspection and Test Planning .................................................................................................. 4
2.6. Quality Training Planning..................................................................................................................... 4
2.7. Customer Training On Operation and Maintenance ........................................................................... 4
2.8. Records and Documentation Plan ....................................................................................................... 4
ed

2.9. Quality Audit Plan ................................................................................................................................ 4

3. Contract Specifications ......................................................................................................................... 6


ct

3.1. Overview .............................................................................................................................................. 6


3.2. Contract Technical Specifications ........................................................................................................ 6
le

3.3. Contract Drawings ............................................................................................................................... 6


3.4. Contract Submittals ............................................................................................................................. 6
Se

3.5. Customer Submittal Approval ............................................................................................................. 8


3.6. Contract Warranty ............................................................................................................................... 9
3.7. Contract Review and Approval ............................................................................................................ 9

4. Design Review and Control ................................................................................................................ 10

4.1. Overview ............................................................................................................................................ 10


4.2. Design Input Review .......................................................................................................................... 10
4.3. Design Quality Assurance/Quality Control Planning ......................................................................... 10
4.4. Design Progress Reviews ................................................................................................................... 11
4.5. Design Output Verification and Approval .......................................................................................... 11

5. Quality Standards............................................................................................................................... 12

5.1. Overview ............................................................................................................................................ 12


5.2. Regulatory Codes ............................................................................................................................... 12
5.3. Industry Quality Standards ................................................................................................................ 12
5.4. Material and Equipment Specifications ............................................................................................. 14

Page 2
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName] Quality Manual

5.5. Work Process Specifications .............................................................................................................. 14


5.6. Controlled Material Identification and Traceability .......................................................................... 15
5.7. Measuring Device Control and Calibration ........................................................................................ 15
5.8. [CompanyName] Quality Standards .................................................................................................. 15
5.9. Application of Multiple Sources of Specifications ............................................................................. 16

6. Purchasing ......................................................................................................................................... 17

6.1. Overview ............................................................................................................................................ 17


6.2. Purchase Order Requirements .......................................................................................................... 17
6.3. Purchase Order Approvals ................................................................................................................. 17

7. Process Controls ................................................................................................................................. 18

7.1. Overview ............................................................................................................................................ 18


7.2. Startup and Quality Control Coordination Meeting .......................................................................... 18
7.3. Preparatory Job Quality Assurance/Quality Control Plan Planning ................................................... 18

s
7.4. Weekly Quality Planning and Coordination Meetings ....................................................................... 19
7.5. Process Control Standards ................................................................................................................. 19

ge
8. Inspections and Tests ......................................................................................................................... 22

8.1. Overview ............................................................................................................................................ 22


Pa
8.2. Required Work Task Quality Inspections and Tests........................................................................... 22
8.3. Material Inspections and Tests .......................................................................................................... 22
8.4. Work in Process Inspections .............................................................................................................. 23
8.5. Work Task Completion Inspections ................................................................................................... 23
ed

8.6. Inspection of Special Processes ......................................................................................................... 24


8.7. Independent Measurement and Tests .............................................................................................. 24
ct

8.8. Commissioning Functional Acceptance Tests .................................................................................... 24


8.9. Hold Points for Customer Inspection ................................................................................................. 24
le

8.10. Quality Inspection and Test Specifications ...................................................................................... 24


8.11. Inspection and Test Acceptance Criteria ......................................................................................... 24
Se

8.12. Inspection and Test Status............................................................................................................... 26


8.13. Independent Quality Assurance Inspections ................................................................................... 26
8.14. Inspection and Test Records ............................................................................................................ 26
8.15. Job Completion and Closeout Inspection ........................................................................................ 27

9. Nonconformances and Corrective Actions ......................................................................................... 29


9.1. Overview ............................................................................................................................................ 29
9.2. Nonconformances ............................................................................................................................. 29
9.3. Corrective Actions ............................................................................................................................. 30

10. Preventive Actions ........................................................................................................................... 31

10.1. Overview .......................................................................................................................................... 31


10.2. Identify Preventive Actions for Improvement ................................................................................. 31
10.3. Train Preventive Actions for Improvement ..................................................................................... 31

11. Quality System Audits ...................................................................................................................... 33

11.1. Overview .......................................................................................................................................... 33

Page 3
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[CompanyName] Quality Manual

11.2. Company-wide Quality System Audit .............................................................................................. 33

12. Record and Document Controls........................................................................................................ 34

12.1. Overview .......................................................................................................................................... 34


12.2. Quality System Documents ............................................................................................................. 34
12.3. Document Controls .......................................................................................................................... 34
12.4. Record Controls ............................................................................................................................... 35

13. Appendix .......................................................................................................................................... 37

13.1. Definitions of Terms ........................................................................................................................ 37

14. Forms ............................................................................................................................................... 40

s
ge
Pa
ed
ct
le
Se

Page 4
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

5. QUALITY STANDARDS
APPLICABLE REGULATIONS, INDUSTRY, and COMPANY STANDARDS

5.1. OVERVIEW
[CompanyName] personnel and suppliers are accountable for compliance to standards-based written
specifications.

To achieve expectations reliably and consistently, specifications are clearly spelled out, not only for results
but also for processes. Specifications apply to materials, work steps, qualified personnel and suppliers,
safe work rules, and environmental work conditions.

Standards ensure that results are specified rather than left to discretionary practices.

s
5.2. REGULATORY CODES

ge
All [CompanyName] Welding and Fabrication activities comply with the relevant regulations. The Quality
Manager identifies regulatory requirements applicable to the jurisdictions served, including:



Applicable Federal regulations
Applicable State regulations
Pa
• Applicable building codes and local addenda to building codes
• Applicable Fire Code
ed

• Applicable Fuel and Gas Code


• Applicable Mechanical Code
• Applicable Plumbing Code
ct

• Additional regulations specified by the customer contract


The Quality Manager identifies regulatory requirements that apply to a specific job.
le

The Supervisor had shop access to relevant codes and government regulations.
Se

5.3. INDUSTRY QUALITY STANDARDS


All [CompanyName] Welding and Fabrication activities comply with generally accepted good
workmanship practices and industry standards.

The Quality Manager identifies supplemental requirements for industry standards that apply to a specific
job during the Quality Assurance/Quality Control Planning when it is not otherwise specified by the
contract, contract technical specifications, or approved drawings.

Page 12
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

Regulatory Codes and Industry Standards

Reference Standard
Division Description Reference Standard Title
No.
5 Minimum spacings and edge AISI SG02-KIT North American Specification for the Design of Cold-Formed
distances for screws Steel Structural Members
5 Installation of bracing and CFSEI Field Installation Guide for Cold-Formed Steel Roof Trusses
permanent bracing and bridging
5 Installation of chimneys, vents, and NFPA 211 Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-
smokestacks Burning Appliances
5 Framing and reinforcing openings SDI DDP Deck Damage and Penetrations
through a steel deck
5 Install high-strength bolts RCSC's "Specification for Structural Joints Using ASTM A 325 or
A 490 Bolts"

s
5 Welding standards AWS B2.1/B2.1M Specification for Welding Procedure and Performance
Qualification

ge
5 Standard practices for structural AISC Code of Standard AISC Code of Standard Practice for Steel Buildings and Bridges
steel fabrication – bound series of Practice for Steel Buildings and
standards Bridges
5

5
Specification for steel fabrication for
structural steel buildings
Structural steel joints
Pa
AISC Specification for
Structural Steel Buildings
RCSC Specification for
AISC Specification for Structural Steel Buildings

RCSC Specification for Structural Joints Using ASTM A325 or


Structural Joints Using ASTM A490 Bolts
A325 or A490 Bolts
ed

5 Standard design symbols ANSI/AWS A2.4 Symbols

5 Standard terms ANSI/AWS A3.0 Terms and Definitions


ct

5 QA recommended practices AWS Welding Quality Welding Quality Assurance Guideline for Fabricators (WQAG)
Assurance Guideline for
le

Fabricators (WQAG)
5 Coating of steel SSPC Steel Structures Painting Steel Structures Painting Manual, Volume I, Good Painting
Manual, Volume I, Good Practice
Se

Painting Practice
5 Coating of steel SSPC Steel Structures Painting Steel Structures Painting Manual, Volume II, Systems and
Manual, Volume II, Systems Specifications
and Specifications
5 Special provisions for seismic AISC Seismic Provisions for Seismic Provisions for Structural Steel Buildings
applications Structural Steel Buildings
5 Detailing standards for the design of AISC Detailing for Steel Detailing for Steel Construction
structural steel details Construction
5 Workmanship and techniques for AWS D1.1/D1.1M Structural Welding Code – Steel
welded construction

Page 13
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

JOB - SPECIFIC WELDING PROCEDURE STANDARDS


The Quality Manager approves welding procedures before they can be used to fabricate metal.

Records of approved welding procedures are maintained on Form QW-483 Welding Procedure
Qualification Record, included as an exhibit.

Welding procedures shall be qualified and approved, in accordance with the applicable ASME Welding
Code(s) or Specification(s) (i.e., D1.1, D1.1M) or AWS B2.1, Specification for Welding Procedure and
Performance Qualification.

The welding procedure must identify the filler material.

When the governing AWS Welding Code(s) mandates that welding procedures be qualified by test, the
Welding Fabricator shall have PQRs that support the applicable WPSs. When prequalified WPSs or
Standard Welding Procedure Specifications (SWPSs) published by the AWS are permitted, PQRs are not
required.

s
The Quality Manager or Certified Welding Inspector (CWI) reviews and approves the welding procedure

ge
before being used in production welding operations.

The WPSs and PQRs are controlled by the Quality Manager according by the document and record control
procedures specified in the relevant section of this Quality Manual.
Pa
The applicable WPSs shall be available to welders or welding operators during testing and production
welding.
ed

5.4. MATERIAL AND EQUIPMENT SPECIFICATIONS


The Quality Manager ensures that all types of materials and equipment that affect quality are identified
and controlled.
ct

The Quality Manager evaluates the expected use of materials and equipment and identifies types of
le

materials and equipment that may affect project quality. For each item, the Quality Manager sets
specifications for their intended use, including:
Se

• Compliance to contract requirements


• Compliance to code and industry standards and listing requirements
• Structural integrity
• Performance
• Durability
• Appearance
• Product identification for traceability.
The Quality Manager identifies controlled material and equipment that apply to the project.

The Quality Manager ensures that purchase orders for listed materials and equipment include the
relevant specifications as specified in section 6.2 Purchase Order Requirements.

Only approved materials are used in the fabrication process.

5.5. WORK PROCESS SPECIFICATIONS

Page 14
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

The Quality Manager ensures that work processes are controlled to ensure that the specified
requirements are met. When appropriate, the Quality Manager will specify project quality standards for
work processes that may include:

• References to documented procedures such as manufacturer’s installation instructions


• Procedures for carrying out process steps
• Methods to monitor and control processes and characteristics
• Acceptability criteria for workmanship
• Tools, techniques and methods to be used to achieve the specified requirements.

5.6. CONTROLLED MATERIAL IDENTIFICATION AND TRACEABILITY


The Quality Manager determines types of project materials that require quality controls.

For each type of quality-controlled material, the Quality Manager determines lot control traceability
requirements, if any, and specifies the means of lot identification. Identification methods may include
physical labels, tags, markings and/or attached certification documents.

s
When lot controlled materials are received, the Superintendent verifies that materials have the specified

ge
lot identifications.

The Superintendent maintains lot identification at all production phases from receipt, through production,
installation, or assembly, to final completion. Acceptable methods for preserving lot identification include
Pa
physically preserving observable lot identifications, recording the lot identification on a work task quality
inspection form or other work record, or collecting the physical lot identifier as a record along with
supplemented with location.
ed

If lot controlled materials are without lot identification, the Superintendent deems the materials as
nonconforming and segregates them and/or clearly marks them to prevent inadvertent use. The
Superintendent treats the material according to the company policy for nonconformances. Only the
ct

Quality Manager can re-identify or re-certify the materials.


le

5.7. MEASURING DEVICE CONTROL AND CALIBRATION


The Quality Manager evaluates the project requirements and determines if there are measuring devices
Se

that require controls to assure quality results.

For each type of device the Quality Manager identifies:

• Restrictions for selection


• Limitations on use.
• Calibration requirements including the frequency of calibration. All calibrations must be
traceable to national measurement standards.
When a measurement device is found not to conform to operating tolerances, the Quality Manager
validates the accuracy of previous measurements.

5.8. [COMPANYNAME] QUALITY STANDARDS


[CompanyName] quality standards supplement contract requirements when they are necessary to ensure
quality.

The Quality Manager identifies supplemental requirements for [CompanyName] Quality standards that
apply to a specific job on the Job Quality Assurance/Quality Control Manual.

Page 15
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

When [CompanyName] quality standards differ from industry standards or product manufacturer
instructions, the Quality Manager justifies that the standard reliably achieves quality results and then
documents the justification.

All [CompanyName] fabrication activities conform to the company quality standards.

5.9. APPLICATION OF MULTIPLE SOURCES OF SPECIFICATIONS


Should multiple sources of specifications apply to a work task, the higher level of specification applies.
When there are equal levels of specifications that conflict, the specifications are applied in this order:

• Submittals approved by the customer


• Contract technical specifications
• Contract drawings
• Government regulations that exceed requirements of items below
• [CompanyName] quality specifications, including subcontract specifications
• [CompanyName] Quality Manual

s
• Product installation instructions
• Industry standards

ge
• Generally accepted practices
Should multiple sources of conflicting specifications apply to a job, the Quality Manager defines the
Pa
standards that apply to the specific job on the Job Quality Assurance/Quality Control Manual.
ed
ct
le
Se

Page 16
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

12. RECORD AND DOCUMENT CONTROLS


12.1. OVERVIEW
[CompanyName] ensures that quality related documents and records are created, current versions are in
use, complete, identifiable, and stored properly.

12.2. QUALITY SYSTEM DOCUMENTS

12.2.1. QUALITY MANUAL


The Quality Manager maintains the [CompanyName] Quality Manual that documents [CompanyName]
quality policies. Each policy identifies the titles of personnel responsible.

The Quality Manager ensures that the Quality Manual and documents related to a work task are

s
accessible to personnel performing the work.

ge
The Quality Manager maintains, improves, and updates the manual as necessary. At least annually, the
Quality Manager determines if updated versions of standards and product installation instructions are
available. If so, the Quality Manager updates the Quality System documentation accordingly.

12.3. DOCUMENT CONTROLS


Pa
The President controls all company-wide quality system documents including:
ed

• Approval of all quality system documents and for adequacy prior to issue or reissue.
• Ensures that applicable documents are available and usable at points of use
• Prevents unintended use of obsolete documents
ct

The Quality Manager controls quality system documents including:


le

Approval of all quality documents and for adequacy prior to issue or reissue
• Ensures that applicable documents are available and usable at points of use
• Prevents unintended use of obsolete documents
Se

12.3.1. CONTROL OF SYSTEM DOCUMENTS


The Quality Manager controls documents related to the [CompanyName] Quality System including:
• Quality System Manual
• Quality System Procedures
• Contract Management Procedures (including interface and coordination with customers and
regulatory agencies)
• Government regulations
• Industry standards
• Procurement specifications
The Quality Manager ensures that records of the distribution of Quality System documents are kept.
When new versions are distributed, obsolete versions are destroyed or controlled to prevent inadvertent
use.

Page 34
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

12.3.2. CONTROL OF CONTRACT DOCUMENTS


The Operations Manager controls documents related to specific customer contracts including:

• Customer contracts
• Contract technical specifications
• Contract drawings
• Shop drawing submittals and approvals
• Product data submittals and approvals
• Allowances and unit price submittals and approvals
• Requests for information and customer responses
• Inspection and test plans

12.4. RECORD CONTROLS


The Quality Manager verifies records for conformance to the Quality System Requirements and approves
all Quality System records.

s
Records demonstrating conformance with and operation of the Quality System are retrievable for at least
five years. The Quality Manager verifies records for conformance to the Quality System Requirements.

ge
12.4.1. QUALITY SYSTEM RECORDS CONTROL
Pa
The Quality Manager verifies the completeness, accuracy, and retention of job-specific Quality System
records including:

• Annual reviews
• Quality improvement records
ed

12.4.2. CONTRACT RECORDS CONTROL


The Quality Manager verifies the completeness, accuracy, and retention of contract-specific Quality
ct

System records including:


le

• Inspection and test records


• Quality submittals to the customer
Se

• Quality system audits


• reviews
• Calibration certificates
• Daily log reports
• Incident reports
• Redline drawings
• Qualified personnel approvals
• Quality improvement records
• Quality records specified by customer contract, or contract technical specifications
• Welding quality records, forms, and reports including:
o Welder Performance Qualification records (WPQRs)
o Welding Procedure Specifications (WPSs)
o Procedure Qualification Records (PQRs)
o Material Test Reports (MTRs) (when required by the contract, governing code or
specification)
o Nondestructive Examination (NDE) reports (when required by the contract, governing code,
or specification)
o Nondestructive Examination Personnel Qualification Records

Page 35
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

o Weld Identification Reports (weld mapping) when required


o Record of Final Inspection (i.e., traveler, inspection record, check off list)
o Heat Treatment Records (when required by the contract, governing code, or specification)
o Receiving Material Inspection Reports
o Nonconformance Reports (NCRs)
o Calibration Records of Test Equipment
o Internal Quality Audit Rep
The Quality Manager assigns record control responsibilities and document location that apply to a specific
job.

s
ge
Pa
ed
ct
le
Se

Page 36
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

14. FORMS
[CompanyName] Controlled Materials Form ......................................................................................... 41
[CompanyName] Material Inspection and Receiving Report .................................................................. 42
[CompanyName] Daily Production Report ............................................................................................. 43
[CompanyName] Work Task Inspection Form ....................................................................................... 44
[CompanyName] Nonconformance Report ............................................................................................ 45
Form M-8 Ultrasonic Unit Calibration Report-AWS ................................................................................ 46
Form M-9 dB Accuracy Evaluation.......................................................................................................... 47
Form M-10 Decibel (Attenuation or Gain) Values Nomograph ............................................................... 48
Form M-11 Report of UT of Welds ......................................................................................................... 49
Form N-1 Welding Procedure Specification Prequalification .................................................................. 51
Form N-3 WPS QUALIFICATION TEST RECORD_ELECTROSLAG AND ELECTROGAS WELDING................... 53
Form N-4 WELDER, WELDING OPERATOR, OR TACK WELDER QUALIFICATION TEST RECORD ................. 54

s
Form N-7 REPORT OF RADIOGRAPHIC EXAMINATION OF WELDS........................................................... 55

ge
Form N-8 REPORT OF MAGNETIC-PARTICLE EXAMINATION OF WELDS .................................................. 56
Form N-9 STUD WELDING APPLICATION QUALIFICATION TEST DATA..................................................... 57
Form S-15 Report of UT (Alternative Procedure) .................................................................................... 58
Pa
ed
ct
le
Se

Page 40
Quality Manual
Copyright
Questions? Call First Time Quality 410-451-8006
[ImagePlaceHolder] [CompanyName] Quality Manual

[CompanyName]
Material Inspection and Receiving Report
Version 20150308

Contract ID Contract Name Purchase Order No. Supplier Bill of Lading No. Date

[ProjectNumber] [ProjectName]

s
Stock/Part Quantity Conditional

ge
Item No. No. Description Received Condition Marking Accept Use Reject

Pa
ed
ACCEPTANCE
ct Receiving Quality Control
le
Listed items have been accepted by me or under my supervision
Se

Conform to contract specifications EXCEPT as noted herein or on supporting documents.


Received in apparent good condition EXCEPT as noted

Signature of authorized person and date: _________________________________________________________________

EXCEPTIONS:

Page 42
Quality Manual
Copyright
[ImagePlaceHolder]
Questions? [CompanyName]
Call First Time QualityQuality Manual
410-451-8006

Form N-1 Welding Procedure Specification Prequalification

s
ge
Pa
ed
ct
le
Se

Page 51
Quality Manual
Copyright
[ImagePlaceHolder]
Questions? [CompanyName]
Call First Time QualityQuality Manual
410-451-8006

s
ge
Pa
ed
ct
le
Se

http://www.aws.org/technical/forms/N-1.pdf

Page 52
Quality Manual
Copyright
[ImagePlaceHolder]
Questions? [CompanyName]
Call First Time QualityQuality Manual
410-451-8006

Form N-3 WPS QUALIFICATION TEST RECORD_ELECTROSLAG


AND ELECTROGAS WELDING

s
ge
Pa
ed
ct
le
Se

http://www.aws.org/technical/forms/N-3.pdf

Page 53
Quality Manual
Copyright
[ImagePlaceHolder]
Questions? [CompanyName]
Call First Time QualityQuality Manual
410-451-8006

Form N-4 WELDER, WELDING OPERATOR, OR TACK WELDER


QUALIFICATION TEST RECORD

s
ge
Pa
ed
ct
le
Se

http://www.aws.org/technical/forms/N-4.pdf

Page 54
Quality Manual
Copyright
 
 

 
For More Information:
Contact: Ed Caldeira 
410‐451‐8006 
www.firsttimequality.com 
EdC@FirstTimeQuality.com 
   

For More Information, contact: Ed Caldeira • Caldeira Quality, LLC • First Time Quality℠ 
410‐451‐8006 • www.firsttimequality.com  • EdC@FirstTimeQuality.com 

You might also like