Luberef - Sulzer Rfi Monitoring Log

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 8

REQUEST FOR

Saudi Aramco 6717-ENG (11/98)

BI

To: Project Inspections U

Inspection/monitoring is

For the following lo

Work Permit required:

SAMPT representative
project requirements.
SAPMT Name

Signature

Telephone

This form received by

Name
Distribution:
QUEST FOR INSPECTION
Aramco 6717-ENG (11/98) 726-200 (Inspection Department)

4000002967 JO SPC-3295 Phase APPLICATI

roject Inspections Unit/Mr. Carmelo Feton T. Baco

ection/monitoring is required on (date) 3-Mar-16 at (time)

For the following location / equipment: (2.1) Material Rece

k Permit required: 0 Yes a No

MPT representative has verified that the work is ready for inspection and conforms to the
ect requirements.
MT Name Ismail Haitham

Date

Fax

form received by the undersigned inspection Department employee:

Carmelo Feton T. Baco Signature


NOTE: Inspector's signature is for receiving th

Distribution: A. Original - Project Mangement B. 1st


REF: SAEP 1150 & 1023

APPLICATION Title PDA Revamp Project At LU

Civil √ Mech'l. Plumb. Comms.

at (time) 10:30:00AM prior to (2.2) SATIP-40

) Material Receiving Inspection of propane commpressor pakages (C-2

Project Quality Plan: 0 Hold Point a


conforms to the CONTRACTOR has verified that the work to be inspected is co
the following specifications:
SAES/SATIP/SAIC SATIP-K-402-01

Contractor/Company JHECO/S

QA/QC Name Kamran Badar

QA/QC Signature

Date 3-Mar-16 Time


for receiving this request only not for approval of the work or facility inspec

B. 1st Copy - Inspection C. 2nd Copy


RFI. NO. SUL-MSE-PDA-16-004 Enter RFI Number
mp Project At LUBEREF II

Others
Elect.

(2.2) SATIP-402-01

pakages (C-2001/S)

Witness

e inspected is complete and in compliance with

K-402-01 SAIC-K-2002

JHECO/Sulzer

Kamran Badar

Date

Time
acility inspected.