Rizvi New Unit Shed-3 - 68'X111'
Rizvi New Unit Shed-3 - 68'X111'
Rizvi New Unit Shed-3 - 68'X111'
Dear Sir,
Task Design & Consultancy is very grateful to you for giving the opportunity to quote for
your esteemed project.
This proposal has been prepared considering latest building code and loading condition as per
BNBC-2006 and based on the dimensions and other parameters as provided by you.
We have tried our utmost to ensure that this proposal would meet all your requirements and
specifications; however, in some cases we may have had to make some assumptions, suggest
certain deviations and/or exclude some items. We would request you to kindly take note of
the same.
Thank you once again for giving us the opportunity to be associated with your esteemed
project and we earnestly look forward to doing business with you.
Sincerely yours,
Regard
Note: 1. There will be no middle column in 1st floor for knitting machine. So rafter weight will be higher.
2. To install Knitting machine in 1st floor, Main beams are considered heavier.
Payment Condition:
Excluding VAT & AIT
Payment Terms:
PAYMENT SCHEDULE OF THE CONTRACT SHALL BE AS FOLLOWS:
1. 60% down payment within 3 days from the date of signed contract in form of account
pay/cash cheque.
2. 20% after delivery of framing material or 12 days from starting of work.
3. 15% after delivery of purlin, sheeting & insulation or 18 days from starting of work.
4. 5% has to be released by 7 days after handover.
Payment Method:
A/C payee or cash cheque on behalf of “Task Design & Consultancy.”
Project Duration
2 (One) months from Date of advanced payment. Eid Vacation has to be considered for
the project duration.
Project Validity
1. This proposal is valid for 14 days from the above noted date.
2. If the job (project) is not “Released for Production” within Eight weeks from the date of entering this
order at TASK DESIGN & CONSULTANCY office, it will be subject to delivery change and price change in
accordance with the prevailing delivery schedules and prices at the end of the above noted period.
Changes/ Revisions
Any change and/ or revision to the above stated scope of supply may lead to a variation in
the price and the delivery period. A change must not hold payment for work completed in
the original contract.
Regard