Japhat Civil Work Boq
Japhat Civil Work Boq
Japhat Civil Work Boq
2 2 BACK FILLING: back filling with excavated avalabil soil 104 Cum 170.00 17,680.00
5 5 Providing, fixing and stripping off steel shuttering for the all
items of RCC works including the cost of centering and
staging etc., complete all as per drawings, specifications and
as directed.
925 Sqm 450.00 416,431.80
11 11 Grove Cutting For VDF flooring (3x3m) 200 Rmt 135.00 27,000.00
15 15 Moorum filling from the out side brought (shed area) 171 Cum 600.00 102,600.00
5121323.59
NOTES:
1 POWER AND WATER MUST BE IN CLINT SCOPE
2 THE ABOVE RATES EXCLUDING GST
3 Advance for Civil work 30%.
4 Rock quantity has given by surveyer
MEASUREMENT SHEET
Sl. Ag.
DESCRIPTION Nos Length Breadth Depth Quantity Unit
No No
M30 Grade
Footing F1 4 2.300 2.000 0.650 11.960
F2 4 2.300 2.000 0.650 11.960
F3 2 2.100 1.800 0.600 4.536
F4 2 2.500 2.500 0.600 7.500
Pedestial C1 4 0.750 1.050 2.350 7.403
C2 4 0.750 1.050 2.350 7.403
C3 2 0.450 0.750 2.400 1.620
C4 2 0.450 0.450 2.400 0.972
Column C1 4 0.600 0.900 4.300 9.288
C2 4 0.600 0.900 4.300 9.288
C3 2 0.350 0.600 4.300 1.806
C4 2 0.450 0.450 4.300 1.742
Plingth Beam - Long 3 19.000 0.300 0.450 7.695
Plingth Beam - short 4 15.000 0.300 0.450 8.100
slab 1 19.000 15.000 0.150 42.750
slab beam 3 19.000 0.300 0.600 10.260
7 15.000 0.300 0.600 18.900
stair beam 1 2.800 0.230 0.450 0.290
163.471 Cum
Sl. Ag.
DESCRIPTION Nos Length Breadth Depth Quantity Unit
No No
4 4 CRS masonry in foundations and plinth in CM 1:6 proportion,
courses not less than 150mm tk using through/ bond stones at every
2m in each course including curing & 2 line dressing for a width of
1.5 cm. for edges of corner stones, curing etc., in between the stoned
boulder stones or aggregate to be well packed, the cement morter to be
packed using water, so that the morter covers all the gaps in between
stone boulders and binds properly, this shall be done each and every
course as per specification Complete finished Item of work as
directed.
5 5 Providing 200 mm tk. brick masonry using best quality table moulded
well burnt bricks in cement mortar 1:6 as specified including raking of
joints, scaffolding, curing etc., at all heights including all labour &
material etc., cement, above basement at all levels (Brick are to be
immersed in water before construction and sand for mortar shall be
screened wherever necessary.) Rate of brick shall be mentioned along
with the tender.Complete finished Item of work as directed.
1.200 M.T
8 8 shuttering
Footing F1 8 2.300 0.650 11.960
8 2.000 0.650 10.400
F2 8 2.300 0.650 11.960
8 2.000 0.650 10.400
F3 4 2.100 0.600 5.040
4 1.800 0.600 4.320
F4 4 2.500 0.600 6.000
4 2.500 0.600 6.000
Pedestial C1 8 0.750 2.350 14.100
8 1.050 2.350 19.740
C2 8 0.750 2.350 14.100
8 1.050 2.350 19.740
C3 4 0.450 2.400 4.320
4 0.750 2.400 7.200
C4 4 0.450 2.400 4.320
4 0.450 2.400 4.320
Column C1 8 0.600 4.300 20.640
8 0.900 4.300 30.960
Sl. Ag.
DESCRIPTION Nos Length Breadth Depth Quantity Unit
No No
C2 8 0.600 4.300 20.640
8 0.900 4.300 30.960
C3 4 0.350 4.300 6.020
4 0.600 4.300 10.320
C4 4 0.450 4.300 7.740
4 0.450 4.300 7.740
plingth beam - long walls 6 19.000 0.450 51.300
plingth beam - short walls 8 15.000 0.450 54.000
slab 1 19.000 15.000 285.000
slab beam 6 19.000 0.600 68.400
3 19.000 0.300 17.100
14 15.000 0.600 126.000
7 15.000 0.300 31.500
stair beam 2 2.800 0.450 2.520
1 2.800 0.230 0.644
925.404 Sqm
0 0.000
0.000 Sqm
14 14 Providing & fixing in position steel rolling shutters as per design &
drawing, using18g steel laths,pressed steel guides heavy MS pipe shaft
coiled springs, locking patti, MS brackets, ball bearings, including one
coat of approved make zinc chromate metal primer,2 coats of
approved make and shade synthetic enamel paint, scaffolding,
staging,cleaning,welding,grouting, curing etc., complete with gear
operated system.
1 4.000 4.000 16.000
Sl. Ag.
DESCRIPTION Nos Length Breadth Depth Quantity Unit
No No
16.000 Sqm
17 17 Moorum filling from the out side brought (flooring) 1 19.000 15.000 0.600 171.000
171.000 Cum
STEEL DETAIL
Dis. no. of items Nos in one item length ø of bar (mm) wt./m
F1 & F2 bottom(0.3+0.3 for L) 8 21 2.9 12 0.89
F1 & F2 bottom 8 24 2.6 12 0.89
F1 & F2 top 8 8 2.9 10 0.62
F1 & F2 top 8 9 2.6 10 0.62
F1 & F2 side bars 8 3 2.9 10 0.62
F1 & F2 side bars 8 3 2.6 10 0.62
F4 bottom 4 26 3.1 12 0.89
F4 top 4 9 3.1 10 0.62
F3 bottom(0.3+0.3 for L) 2 15 2.7 12 0.89
F3 bottom 2 18 2.4 12 0.89
F3 top 2 7 2.7 10 0.62
F3 top 2 8 2.4 10 0.62
column bars C1 & C2 8 12 7.8 25 3.86
stirups master 12 37 3 8 0.40
column bars C3 4 8 7.8 25 3.86
flooring 1 97 15 8 0.40
1 77 19 8 0.40
PB1 3 6 19 16 1.58
3 2 19 12 0.89
PB2 4 6 15 16 1.58
4 2 15 12 0.89
PB striups 3 95 1.6 8 0.40
4 75 1.6 8 0.40
SB1 3 6 19 25 3.86
3 2 19 16 1.58
SB2 7 6 15 25 3.86
7 2 15 16 1.58
Stair beam 1 3 2.8 25 3.86
1 2 2.8 16 1.58
SB striups 3 127 1.8 8 0.40
7 100 1.8 8 0.40
slab 2 100 19 8 0.40
2 128 15 8 0.40
KG
MT
total weight kg
433.608
444.288
115.072
116.064
43.152
38.688
286.936
69.192
72.09
76.896
23.436
23.808
2890.368
532.8
963.456
582
585.2
540.36
101.46
568.8
106.8
182.4
192
1320.12
180.12
2431.8
331.8
32.424
8.848
274.32
504
1520
1536
17128.306
17.13