Boq 6-14-2022
Boq 6-14-2022
Boq 6-14-2022
Location :-JAWALAKHEL
Bill Of Quantities
1 Earthwork
Earth work in Excavation
E/W in excavation inclusive of shoring and dumping,
surplus waste along with trenching, dewatering all
necessary as per design, specification & instruction
of Consultant, all
complete.
2 Earthwork Disposal outside the site. 32,302.30 Cu. ft 25.00 807,557.50
3 Earthwork Backfilling 8,443.00 Cu. ft 12.00 101,316.00
6 Sheet piling
pachakanya
HYSD Fe 500 Grade 142,388.20 kg 190.00 27,053,758.00
/ hama
Tile Works
Providing and laying Vertified tiles of 6 mm thick of
Somany or equivalent including bedding cement mortar
in (1:3) on floor and wall and true line level, joint finished
with joint filler as per drawing, specification and instruction
of
the Consultant. (Base rate of tiles is 120/Sqft)
26 Floor Tiles at Toilet (Including 44mm thick (1:6) 4,421.33 Sq.ft 285.00 1,260,079.05
Wall Tiles (Including 25mm thick (1:4) C/S base
27 3,282.86 Sq.ft 285.00 935,615.10
mortar.)
Steel railing in combinations with 2", 1.5" & 1/2" sizes of
S. S. circular pipes as per design with S/S shoe & handrail
28 218.75 r ft. 750.00 164,062.50
all complete as per drawing, specification and
instruction of Consultant.
Notes:
Change in Specification may bring change in rates
All quantities shall be verified in site
The rate is excluding 13% VAT
This rate is valid till 6 months from estimation date