मो रया Construction: Estimate
मो रया Construction: Estimate
मो रया Construction: Estimate
2 Excavation for foundation in hard murum & 2823.00 Cft 16.00 45168.00
boulder including removing the excavated
material upto a distance of 50m. beyond the
building area & stacking and spreading as
directed, preparing the bed for the foundation
and necessary back filling, ramming, watering,
including, shoring & strutting etc.
12 Providing and fixing single Aluminium louvered 24.00 Sq.ft. 200.00 4800.00
windows of approved make, medium type
,relevant ISI sections and specifications, with
fixtures, locking arrangement, as required,
etc.complete.
Total 1047013.00
Electrifications @ 5% 50627.00
Total 1191776.00
(Rs. Eleven Lakh Ninety One Thousand Seven Hundred Seventy Six Only) 1191776.00