CIVIL ESTIMATE
2/23/2024
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
40.5
14.855
1
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
6 Filling with contractor's own earth ( excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm in depth,
consolidating each deposited layer by ramming
CUM 800 11040
and watering, lead up to 50 m and lift up to 1.5
m as per direction of site Engineer-in-charge
13.8
33.501
2
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
11 Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20xl5cm or nearest
available size confirming to IS 2185 part 1 of
1979 for super structure above floor two level
CUM 10800 425930.4
upto floor five level with thickness 15cm in :
CM 1:6 ( 1 cement : 6 coarse sand) etc
complete
39.438
480
3
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
16 Providing and laying vitrified floor tiles in
different sizes (thickness to be specified by the
manufacturer) with water absorption less than
0.08% and conforming to IS : 15622, of
approved make, in all colours and shades, laid
on 20 mm thick cement mortar 1:4(1 cement : 4 SQM 1536 145351.68
coarse sand), including grouting the joints with
white cement and matching pigments etc.,
complete.Size of Tile 600 x 600 mm.
94.63
4
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
22 Providing and fixing white vitreous china
pedestal type water closet (European type W.C.
pan) with seat and lid, 10 litre low level white
P.V.C. flushing cistern, including flush pipe,
with manually controlled device (handle lever),
conforming to IS : 7231, with all fittings and Nos 10000 30000
fixtures complete, including cutting and making
good the walls and floors wherever
required:W.C. pan with ISI marked black solid
plastic seat and lid
3
5
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
29 Providing and fixing PVC pipes, fittings
including fixing the pipe with clamps at 1.00 m
spacing. This includes jointing of pipes &
fittings with one step PVC solvent
M 350 7000
cement and testing ofjoints complete as per
direction of Engineer -in-Charge 20 mm dia 10
Kgf/cm2- Internal work - Exposed on wall
20
6
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
35 Providing and fixing 200mm wide square
uPVC rain water gutter including all
necessary
fittings and making all necessary connections M 190 1330
complete as per the direction of Engineer -
incharge at site OD75/21-22
7
17.5
37 Electrification 400000
38
TOTAL 3497618.28
7
CONSTRUCTION OF PROPOSED RESIDENCE FOR Mr. S V SUBIN & AMBILY V S ,
SMITHA BHAVAN (H), PALAKKATHAKIDI,KUNNAMTHANAM,
PATHANAMTHITTA IN RE SY NO.10/6-1 OF CHENGANASERY VILLAGE,
KOTTAYAM TALUK, KOTTAYAM DIST.
ESTIMATE SUMMARY
2/23/2024
SL NO DETAILS AMOUNT
TOTAL 6,412,988.52
CIVIL ESTIMATE
2/23/2024
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
40.5
14.855
9
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
6 Filling with contractor's own earth ( excluding
rock) in trenches, plinth, sides of foundations
etc. in layers not exceeding 20 cm in depth,
consolidating each deposited layer by ramming
CUM 800 11040
and watering, lead up to 50 m and lift up to 1.5
m as per direction of site Engineer-in-charge
13.8
33.501
10
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
Solid block masonry using pre cast solid blocks
(Factory made) of size 30x20xl5cm or nearest
available size confirming to IS 2185 part 1 of
1979 for super structure above floor two level
CUM 10800 425930.4
upto floor five level with thickness 15cm in :
CM 1:6 ( 1 cement : 6 coarse sand) etc
complete
39.438
11
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
142.50 m2 90 12825.00
12
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
5 Centering and shuttering including strutting,
etc. and removal of form for:Foundations,
footings, bases of columns, etc for mass
concrete 71.20 m2
14.86 m3
f Lintel
Ground floor 3.80 m3 12500 47500.00
First floor 2.80 m3 12600 35280.00
g Sunshade
Ground floor 2.80 m3 12500 35000.00
First floor 2.30 m3 12600 28980.00
h Flat Slab
Ground floor 14.20 m3 12000 170400.00
First floor 11.00 m3 12100 133100.00
i Stair case
Ground floor 1.80 m3 15000 27000.00
13
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
First floor 42.00 m3 5900 247800.00
14
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
Providing and laying R C C M25, 1:1.5:3 using
20mm metal including all cost and conveyance
of all materials all labour charges, including
mixing, laying and consolidation all lead and
lift, hire of form work, curing etc, complete.
6.48 m3
15
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
16
ITEM
DETAILS OF WORK QTY PER RATE AMOUNT
No:
24 Applying melemine matt finish to T. W main
entrance door including surface preparation,
filler,etc complete as per the direction of
Engineer in charge. 10.00 m2 1200 12000.00
TOTAL 5344157.10
17
CONSTRUCTION OF PROPOSED RESIDENCE FOR Mr. S V SUBIN & AMBILY V S ,
SMITHA BHAVAN (H), PALAKKATHAKIDI,KUNNAMTHANAM, PATHANAMTHITTA IN
RE SY NO.10/6-1 OF CHENGANASERY VILLAGE, KOTTAYAM TALUK, KOTTAYAM
DIST.
DETAILED ESTIMATE FOR CIVIL WORKS
2/23/2024
ITEM UNI
DETAILS OF WORK NO LENGTH BREDTH HEIGHT QTY
No: T
GF
18
1.36 m3
f Lintel
W4 0 2.60 0.20 0.20 0.00
W3 0 2.10 0.20 0.20 0.00
W2 0 1.60 0.20 0.20 0.00
KW2 0 1.60 0.20 0.20 0.00
KW3 0 2.10 0.20 0.20 0.00
G1 0 2.28 0.20 0.20 0.00
G2 0 3.66 0.20 0.20 0.00
V 0 1.20 0.20 0.20 0.00
D 0 1.50 0.20 0.20 0.00
DD 0 1.70 0.20 0.20 0.00
DD1 0 1.50 0.20 0.20 0.00
D2 0 1.35 0.20 0.20 0.00
D1 0 1.50 0.20 0.20 0.00
19
Deduction
W4 -1 2.00 1.50 0.20 -0.60
W3 -1 1.50 1.50 0.20 -0.45
W2 -6 1.00 1.50 0.20 -1.80
KW2 -1 1.00 1.00 0.20 -0.20
KW4 -1 2.00 1.00 0.20 -0.40
G1 0 1.68 1.00 0.20 0.00
G2 0 3.06 1.00 0.20 0.00
V -3 0.60 0.60 0.20 -0.22
D -1 0.90 2.10 0.20 -0.38
MD -1 2.20 2.10 0.20 -0.92
27.31
Say 27.31 m3
20
13 Water proofing
Toilet 7.60
2 2.50 1.50 7.50
2 8.00 0.60 9.60
-2 0.75 0.60 -0.90
Roof top 160.30
184.10 m2
21 Vitrified GF 72.76
Stair 10.11
5 % for Skirting 3.64
86.51 m2
21
30.45 m2
27 Sythetic enamel
D 2 9.45 1.13 21.26
V 2 0.54 0.50 0.54
W 2 17.75 0.50 17.75
39.55 m2
22
CONSTRUCTION OF PROPOSED RESIDENCE FOR Mr. S V SUBIN & AMBILY V S ,
SMITHA BHAVAN (H), PALAKKATHAKIDI,KUNNAMTHANAM, PATHANAMTHITTA IN
RE SY NO.10/6-1 OF CHENGANASERY VILLAGE, KOTTAYAM TALUK, KOTTAYAM
DIST.
DETAILED ESTIMATE FOR CIVIL WORKS
2/23/2024
ITEM UNI
DETAILS OF WORK NO LENGTH BREDTH HEIGHT QTY
No: T
FF
e Beam
FF beam 8.57 0.20 0.35 0.60
0.60 m3
f Lintel
W3 4 2.10 0.20 0.20 0.34
W2 1 1.60 0.20 0.20 0.06
V 1 1.28 0.20 0.20 0.05
D 2 1.50 0.15 0.10 0.05
0.50
23
D2 -2 0.75 2.10 0.20 -0.63
10.01
12 Ceiling plastering
Roof slab 102.37
Sunshade 29.25
Beam 8.57 0.90 7.71
139.33 m2
24
19 D2 1 0.75 2.10 1.58 m2
27 Sythetic enamel
D 2 3.78 1.13 8.51
W 2 9.00 0.50 9.00
V 2 0.31 0.50 0.31
17.81 m2
25
Compatibility Report for raosamma john estimate.xls
Run on 05-02-2020 1:05
The following features in this workbook are not supported by earlier versions of
Excel. These features may be lost or degraded when you save this workbook in
an earlier file format.
Some cells or styles in this workbook contain formatting that is not supported 6
by the selected file format. These formats will be converted to the closest
format available.