SEDULE
SEDULE
SEDULE
Sub: Renovation of Internal road with Paver Blocks at Bardhaman Science Centre (Phase-1).
Sl.
Description of item Qty. Unit Rate Amount
No.
1.0 Earth work in excavation of foundation trenches or drains, in all
sorts of soil (including mixed soil but excluding laterite or
sandstone) including removing, spreading or stacking the spoils
within a lead of 150 m. as directed. The item includes necessary
trimming the sides of trenches, levelling, dressing and ramming the
bottom, bailing out water as required complete. Depth of excavation
not exceeding 1,500 mm. 20 Cum. 119.27 2,385.40
2.0 Earth work in filling in foundation trenches or plinth with good
earth, in layers not exceeding 150 mm. including watering and
ramming etc. layer by layer complete. (Payment to be made on the
basis of measurement of finished quantity of work)
With earth obtained from excavation of foundation. 20 Cum. 77.54 1,550.80
3.0 Filling in foundation or plinth by silver sand in layers not exceeding
150 mm as directed and consolidating the same by thorough
saturation with water, ramming complete including the cost of
supply of sand. (Payment to be made on measurement of
finished/ compacted quantity) 10 Cum. 521.07 5,210.70
4.0 Dismantling all types of plain cement concrete works (upto 150mm
thick), stacking serviceable materials at site and removing rubbish
as directed within a lead of 150m & upto at any level. 0.5 Cum 939.00 469.50
5.0 Dismantling R.C. floor, roof, beams etc. including cutting rods and
removing rubbish as directed within a lead of 150 m. including
stacking of steel bars. 0.5 Cum 1,956.00 978.00
6.0 Labour for taking out old Single flat soling including removing of
debris and stacking of serviceable materials within a lead of 150 m.
as per direction of Engineer In Charge. 10 Sqm. 9.81 98.10
7.0 Labour for taking out brick-on-edge of herring bone bond including
removing debris to flank or berm sorting out serviceable materials
and stacking serviceable materials within a lead of 150 m. as per
direction of Engineer In Charge. 100 Sqm. 17.32 1,732.00
8.0 Labour for taking out brick-on-end edging including removing
debris to flank or berm sorting out serviceable materials and
stacking serviceable materials within a lead of 150 m. as per
direction of Engineer In Charge. 100 Mtr. 6.64 664.00
9.0 Labour for laying Single brick flat soling (thickness 75 mm) with
departmental bricks including carriage of departmental bricks within
a lead of 150 meters preparation of bed as necessary with brick
joints properly filled in and packed with local sand or powdered
earth and including necessary cushion of similar materials below the
soling (and in between layers when more than one layer is used)
(The item included the cost of obtaining local sand or powdered
earth) 10 Sqm. 35.84 358.40
10.0 Single brick flat soling (thickness 75 mm) with picked Jhama bricks
including preparation of bed as necessary with brick joints properly
filled in and packed with powdered earth and including necessary
cushion of similar material below the soling (and in between layers
when more than one layer is used) completes as per direction.
75 Sqm. 312.00 23,400.00
Page 1 of 3
Sl.
Description of item Qty. Unit Rate Amount
No.
11.0 Brick work with 1st class bricks (Class designation 75) in cement
mortar (1:6)
In Foundation & upto plinth.
Page 2 of 3
Sl.
Description of item Qty. Unit Rate Amount
No.
19.0 Providing and laying at or near ground level factory made kerb
stone (size: 300 mm x 300 mm x width 150 mm at bottom with
bevelled nosing at top) of M-25 grade cement concrete in position
to the required line, level and curvature, jointed with cement mortar
1:3 (1 cement: 3 coarse sand), including making joints with or
without grooves (thickness of joints except at sharp curve shall not
to more than 5mm) and curing the mortar joints for at least 3 days,
including making drainage opening wherever required and back
filling the vertical piece properly with earth duly compacted,
including cost and carriage of all materials etc. as per direction of
Engineer-in-charge (length of finished kerb edging shall be
measured to calculate volume for paymen). (Precast C.C. kerb stone
shall be approved by Engineer-in-charge). 15 Cum. 8500.00 1,27,500.00
20.0 Priming one coat on timber or plastered surface with synthetic oil
bound primer of approved quality including smoothening surfaces
by sand papering etc. (This item is applicable to new work or old
work when the original surface has been exposed by removal of old
paint) 75 Sqm. 38.00 2,850.00
21.0 Painting with best quality synthetic enamel paint of approved make
and brand (ICI Dulux 5 in 1 or Equivalent) including smoothening
surface by sand papering etc. including using of approved putty etc.
on the surface, if necessary.
Two coats (with any shade except white) with super gloss (hi-gloss)
of approved quality on timber or plastered surface. 75 Sqm. 81.00 6,075.00
22.0 Removal of rubbish, earth, scrap material etc. from the working site
and dispose of the same beyond the compound in truck loads in
conformity with Municipal/Corporation rules and as per instruction
of Engineer – in – Charge. 1 L.S. 2,500.00 2,500.00
Cost of Civil works ::: 912399.80
GST, as applicable over cost of Civil work @ 18% ::: 164231.96
Cost of Civil works excluding labour welfare cess ::: 1076631.76
Labour welfare cess @ 1% ::: 10766.32
Total amount of Civil Work ::: 1087398.08
Say Rs. 1087398.00
NOTE :
1 Tenderers should visit the site before quoting the rate to understand the nature of work and condition of the site.
2 Rates shall be quoted inclusive of all materials, wastage, labour, hire charges of all tools, plants and machinery,
shifting charges, taxes & duties etc. required for this job. No additional payment shall be done by the BITM
for this purpose.
3 The work shall be required to carry out without obstructing the visitor's movements and may also be required to
carry out beyond office hours (if required) for which no additional payment shall be made.
4 The work will be carried out after following all respective precautionary measure and safety rules. Expenditure
towards insurance coverage for the labourers working at site has to be included in the rate.
5 Regarding the work directives of the Engineer-in-Charge shall be final and binding.
6 All materials must be approved by the Engineer-in- Charge before supplying at site.
List of Approved materials :
i) Cement: Ultratech/ ACC/ Lafarge/ Ambuja.
ii) Reinforcement: JSW/ JSPL/ SHYAM/ SRMB/ BMASL/ ELECTROSTEEL/ SSL.
iii) Synthetic Enamel: Asian paints/ ICI Dulux/ Berger.
Page 3 of 3