SUMMARY OF COST
Project: Residence
Site : Banepa, Kavre
S.N. Description of Work Amount (NRs.) Remarks
A Building 6,822,539.36
B Sanitary works-5% of civil works 341,126.97
C Electrical Works-5% of civil works 341,126.97
Sub-Total 7,504,793.30
Contingency-5% 375,239.66
Total 7,880,032.96
Vat-13% 1,024,404.29
Total Cost Estimate 8,904,437.25
Abstract of Cost
Project: Residence
Site : Banepa, Kavre
Civil Works
S.N. Description of Work Quantity Unit Rate Rs. Per Amount (NRs.)
1 Site preparation work Before construction
with cleaning and disposal of debrises,
uprooting roots, solid wastes etc. all 840.00 Sq.Ft 1.28 Sq.Ft 1,073.42
complete .
2 Earthwork in excavation in ordinary soil. 2423.04 Cu.Ft 13.96 Cu.Ft 33,823.09
3 Earth filling in 150 mm thick layer, watering,
ramming including supply of filling materials
within 10 m distance all complete. 969.210 Cu.Ft 8.53 Cu.Ft 8,264.64
4 Sand filling, watering and compaction 647.00 Sq.Ft 8.55 Sq.Ft 5,533.96
5 Providing 4.5m length, 0.5m dia. Stone
column/gravel pile at 1.5m c/c just beneath 369.00 R.Ft 823.17 R.Ft 303,749.73
the foundation trench
6 Laying 1 Layer 400 micron Plastic Sheet 647.00 Sq.Ft 77.62 Sq.Ft 50,218.87
7 Flat dry brick soling on flat in foundation and
1205.30 Sq.Ft 101.49 Sq.Ft 122,322.12
floor including sand filling in joints.
8 Plain cement Concrete (PCC) in 1:3:6 ratio
for foundations, flooring and walls with
approved quality of cement and sand and
crushed stone aggregate including mixing, 261.89 Cu.Ft 317.79 Cu.Ft 83,224.81
laying, curing etc all complete in approval of
site engineer.
Project: Residence
Site : Banepa, Kavre
Footing
Footing F1, F2, F3 3 5.5 5.50 0.25 22.69
Footing F4, F5, F6 3 6.6 6.60 0.25 32.67
Footing EF1, E2, EF3 3 5.5 5.50 0.25 22.69
Strap Beam Along A-A, B-B,C-C 3 9.167 1.00 0.25 6.88
Toe wall Front 1 13.58 1.50 0.25 5.09
Toe wall Side 1 7 1.50 0.25 2.63
Inside Room 1 Area= 647.00 0.25 161.75
Tie Beam Along 1-1, 2-2, 3-3 3 13.33 0.75 0.25 7.50
Total 261.89 Cu.Ft
Plain cement Concrete (PCC) for RCC
works M20(1:1.5:3) for Beams with
approved quality of cement and sand and
crushed stone aggregate(Ready Mix
9 Concrete) including mixing, laying, curing
etc all complete in approval of site
engineer.
Footing
Footing F1, F2, F3 3 5.5 5.5 1.00 90.75
Footing F4, F5, F6 3 6.6 6.6 1.17 152.50
Footing EF1, E2, EF3 3 5.5 5.5 1.00 90.75
Ground Floor 1 Area= 647.27 0.42 271.85
First Floor 1 Area= 647.27 0.42 271.85
Second Floor 1 Area= 504.00 0.42 211.68
Sill Band
Ground Floor
Toe Wall 1 13.58 0.75 0.25 2.55
Along A-A 1 11.42 0.75 0.25 2.14
Along B-B 1 11.42 0.42 0.25 1.20
Along C-C 1 22.42 0.75 0.25 4.20
Along 1-1 1 24.33 0.75 0.25 4.56
Along 2-2 1 15.67 0.42 0.25 1.65
Along 3-3 1 24.83 0.75 0.25 4.66
Toilet and Void 1 18.75 0.42 0.25 1.97
First Floor
Along A-A 1 22.42 0.75 0.25 4.20
Along B-B 1 22.42 0.42 0.25 2.35
Along C-C 1 22.42 0.75 0.25 4.20
Along 1-1 1 16.00 0.75 0.25 3.00
Along 2-2 1 12.58 0.42 0.25 1.32
Along 3-3 1 24.83 0.75 0.25 4.66
Toilet and Void 1 21.92 0.42 0.25 2.30
Second Floor
Along A-A 1 11.42 0.75 0.25 2.14
Along B-B 1 10.00 0.75 0.25 1.88
Along C-C 1 22.42 0.75 0.25 4.20
Along 1-1 1 9.83 0.75 0.25 1.84
Along 2-2 1 10.00 0.42 0.25 1.05
Along 2-2 1 12.50 0.75 0.25 2.34
Along 3-3 1 24.83 0.75 0.25 4.66
Toilet and Void 1 30.17 0.42 0.25 3.17
Lintel Band
Ground Floor
Toe Wall 1 13.58 0.75 0.75 7.64
Along A-A 1 11.42 0.75 0.75 6.42
Staircase
Slab 3 4.50 3.42 0.33 15.24
3 2.33 3.42 0.33 7.89
3 5.67 3.42 0.33 19.20
Steps 39 Area= 0.24 3.42 32.01
Total 1426.82 Cu.Ft
Formwork, shuttering, centering with
19mm thick waterproof ply for R.C.C
Column and footing with necessary
propping, scaffolding, staging, supporting
12 inclusive of wedging and cutting holes for
utilization till the support if fully unyielding
nett.
Footing
Along A-A 3 22.00 1.33 87.78
Along B-B 3 26.00 1.67 130.26
Along C-C 3 22.00 1.33 87.78
Column
Column upto Plinth Level
Column C1-C9 9 4.00 4.00 144.00
From Plinth level to First Floor
Column C1-C9 9 4.00 16.34 588.10
From First Floor to second Floor
Column C2-C9 8 4.00 8.17 261.34
Total 449.82 Sq.Ft
Ground Floor
Along 1-1 1 25.33 2.25 56.99
Along 2-2, 3-3 2 27.33 2.25 122.99
Along A-A,B-B,C-C 3 21.42 2.25 144.59
First Floor
Along 1-1 1 25.33 2.25 56.99
Along 2-2, 3-3 2 27.33 2.25 122.99
Along A-A,B-B,C-C 3 21.42 2.25 144.59
Second Floor
Along 1-1 1 25.33 2.25 56.99
Along 2-2 1 25.33 2.25 56.99
Along 3-3 1 10.08 2.25 22.68
Along B-B, C-C 2 21.42 2.25 96.39
Along A-A 1 13.42 2.25 30.20
Total 1347.84 Sq.Ft
Formwork, shuttering, centering with
19mm thick waterproof ply for R.C.C Slab
with necessary propping, scaffolding,
staging, supporting inclusive of wedging
14 and cutting holes for utilization till the
support if fully unyielding nett.
Ground Floor
Inside 1 Area= 647.27 647.27
Outside Boundary 1 106.00 0.42 44.52
First Floor
Inside 1 Area= 647.27 647.27
Outside Boundary 1 106.00 0.42 44.52
Second Floor
Inside 1 Area= 504 504.00
Outside Boundary 1 99.00 0.42 41.58
Staircase
Slab 3 4.50 3.42 46.17
Base Side 3 4.50 0.33 4.46
Base 3 2.33 3.42 23.91
Side 3 2.33 0.33 2.31
Ground Floor
Toe Wall 1 12.92 0.75 8.92 86.43
Along A-A 1 11.42 0.75 8.17 69.95
Along B-B 1 11.42 0.42 8.17 39.17
Along C-C 1 22.42 0.75 8.17 137.33
Along 1-1 1 24.33 0.75 8.17 149.03
Along 2-2 1 15.67 0.42 8.17 53.75
Along 3-3 1 24.83 0.75 8.17 152.09
Toilet and Void 1 24.67 0.42 8.92 92.42
Deduction
Dw 1 3.50 0.75 7.50 -19.69
Window 2 2.00 0.75 5.67 -17.01
Door 1 3.25 0.75 7.00 -17.06
Window 1 6.75 0.75 6.67 -33.77
Window 1 3.00 0.75 5.00 -11.25
Window 1 10.00 0.75 6.67 -50.03
Toilet Door 1 2.50 0.42 7.00 -7.35
First Floor
Along A-A 1 22.42 0.75 8.17 137.38
Second Floor
Along A-A 1 11.42 0.75 8.17 69.98
Along B-B 1 10.00 0.75 8.17 61.28
Along C-C 1 22.42 0.75 8.17 137.38
Along 1-1 1 9.83 0.75 8.17 60.23
Along 2-2 1 10.00 0.42 8.17 34.31
Along 2-2 1 12.50 0.75 8.17 76.59
Along 3-3 1 24.83 0.75 8.17 152.15
Toilet and Void 1 30.17 0.42 8.17 103.53
Deduction
Dw 1 3.50 0.75 8.00 -21.00
Door 1 3.25 0.75 7.00 -17.06
Window 1 5.83 0.75 5.00 -21.86
Window 2 1.50 0.75 5.00 -11.25
Door 1 3.25 0.75 7.00 -17.06
Window 1 1.67 0.75 5.00 -6.26
Window 1 2.50 0.75 5.00 -9.38
Window 1 5.83 0.75 5.00 -21.86
Parapet
Top 1 113.00 0.75 3.00 254.25
Deduction
Railing 1 3.50 0.75 3.00 -7.88
Staircase 1 3.17 0.75 3.00 -7.13
Compound Wall
Step-1 1 105.17 1.5 0.50 78.88
Step-2 1 105.17 1.167 0.50 61.37
Wall 1 98.17 0.75 4.00 294.51
Post 7 1.00 1 2.00 14.00
Total 2958.83 Cu.Ft
Ground Floor
Toe Wall 1 12.92 8.92 115.25
Along A-A 1 11.42 8.17 93.27
Along B-B 1 11.42 8.17 93.27
Along C-C 1 22.42 8.17 183.10
Along 1-1 1 24.33 8.17 198.70
Along 2-2 1 15.67 8.17 127.98
Along 3-3 1 24.83 8.17 202.79
Toilet and Void 1 24.84 8.92 221.57
Column 9 1.50 9.33 125.96
Beam
Ground Floor
Along 1-1 1 25.33 1.5 38.00
Deduction
Dw 1 3.50 8.00 -28.00
Window 2 2.00 5.67 -22.68
Door 1 3.25 7.00 -22.75
Window 1 6.75 6.67 -45.02
Window 1 3.00 5.00 -15.00
Window 1 10.00 6.67 -66.70
Toilet Door 1 2.50 7.00 -17.50
First Floor
Along A-A 1 22.42 8.17 183.17
Along B-B 1 22.42 8.17 183.17
Along C-C 1 22.42 8.17 183.17
Along 1-1 1 17.00 8.92 151.64
Along 2-2 1 12.58 8.17 102.78
Along 3-3 1 24.83 8.17 202.86
Toilet and Void 1 21.92 8.92 195.53
Column 9 1.50 9.33 125.96
Beam
First Floor
Along 1-1 1 12.50 1.5 18.75
1 9.83 2.25 22.12
Along 2-2 1 13.00 1.5 19.50
1 10.00 2.25 22.50
Along 3-3 1 27.33 1.5 41.00
Along A-A,B-B 2 21.42 2.25 96.39
Along C-C 1 21.42 1.5 32.13
Ceiling 1 Area= 570.92 570.92
Deduction
Dw 1 3.50 8.00 -28.00
Window 1 10.00 6.67 -66.70
Door 1 3.25 7.00 -22.75
Window 1 1.67 5.00 -8.35
Window 1 1.00 5.00 -5.00
Window 1 2.00 5.00 -10.00
Second Floor
Along A-A 1 11.42 8.17 93.30
Along B-B 1 10.00 8.17 81.70
Along C-C 1 22.42 8.17 183.17
Along 1-1 1 9.83 8.17 80.31
Along 2-2 1 10.00 8.17 81.70
Along 2-2 1 12.50 8.17 102.13
Along 3-3 1 24.83 8.17 202.86
Deduction
Dw 1 3.50 8.00 -28.00
Door 1 3.25 7.00 -22.75
Window 1 5.83 5.00 -29.15
Window 2 1.50 5.00 -15.00
Door 1 3.25 7.00 -22.75
Window 1 1.67 5.00 -8.35
Window 1 2.50 5.00 -12.50
Window 1 5.83 5.00 -29.15
Parapet
Top 1 113.00 3.00 339.00
Deduction
Railing 1 3.50 3.00 10.50
Staircase 1 3.17 3.00 9.50
Compound wall
Wall 1 98.17 4.00 392.68
Post 7 4.00 2.00 56.00
Total 6522.63
Staircase
Slab 3 4.50 3.42 46.17
3 2.33 3.42 23.91
3 5.67 3.42 58.17
Steps 39 1.42 3.42 189.40
Deduction
Toilet Door 4 2.50 6.50 -65.00
Toilet Window 1 2.00 4.00 -8.00
Total 618.84 Sq.Ft
Parapet
Top 1 113.00 1 0.25 28.25
Deduction
Railing 1 3.50 1 0.25 -0.88
Staircase 1 3.17 1 0.25 -0.79
1 9.75 9.75
Total 9.75 R.Ft
Fencing with 62mm x 62mm size mesh
made up of 7mm dia rods framed on
25x25x4mm angles and 50mm dia M.s
37 blackpipe post in 2m interval including
jointing, fixing, erection and primer with a
all necessary M.S grills and plates
1 54.00 54.00
Total 54.00 R.Ft
k]h g+=
1 3fF; sf6\g] To;sf] h/f lemSg], l9:sf] k'm6fpg] / n]en ldnfpg] sfo{ ===============
@
2 ;fx|f] k|sf/sf] Sn], g/d d'/d 9'+uf -#) ;]=dL=;Dd_ ld;] 5
3 ;fdfGo df6f]n] k'g]{ sfd !%, !% ;]=dL= sf] txdf km}nfpg df6f] afx] 5
4 ˆnf]l/Ëdf afn'jf eg]{ sfd ========================= 56
5 Ps tx Knfli6s km]N6 nufpg] sfd ===================== 87
6 hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd-lk=;L=;L= !M# 18
7 hu leQf kvf{ndf l;d]G6 s+lqm6 ug]{ sfd -lk=;L=;L= !M 19
8 ;'k/ :6«Sr/, 8]s :n]a ljdx?df l;d]G6 s+lqm6 ug]{ sfd -!M!.%M#_================
20
9 cf/=;L=;L= nflu kmnfd] 808L sf6\g], df]8\g] #) dL6/ ;Dd == 24
10 sf7df kmdf{ agfpg] sfd =========================== 24
11 sf]nddf kmdf{ nuffpg] sfd ======================== 25
12 jLddf kmdf{ agfpg] sfd -jLdsf] prfO{ )=# dL= ;Dd_ = 26
13 e'O{+tNnfdf d]l;g d]8 O{+6fsf] uf/f] nufpg] sfd l;d]G6 d;nf -!M$_ df 9===========
14 e'O{+tNnfdf lrDgL e§fsf] O{+6fsf] uf/f] l;d]G6 d;nf - 11
15 e'O{+tNnfdf lrDgL e§fsf] O{+6fsf] uf/f] l;d]G6 d;nf - 13
Supplying and fitting Aluminium fixed panel window with Ventilation but without fly
1 mesh shutter from section (88 x38.1x1.2)mm 107
Supplying and fitting Aluminium sliding window with Ventilator from section (101
2 x45x1.50)mm …… 108
d
?= 264764.27 #=dL=
?= 13799.07 j=dL=
?= 8786.60 j=dL=
sfd
?= 5989.01 j=dL=
?= 6743.83 j=dL=
sfd
?= 2416.23 j=dL=
?= 3232.92 j=dL=
?= 3526.01 j=dL=
?= 2335.82 j=dL=
?= 240.72 j=dL=
?= 4020.27 j=dL=
fd
?= 393.68 j=dL=
?= 225.15 j=dL=
sfd
?= 279.51 j=dL=
?= 269.63 j=dL=
] sfd
?= 679.43 j=dL=
fd
?= 4405.69 /=dL=
?= 11851.62 /=dL=
?= 1847.61 /=dL=