Contoh Site Folder Rollout
Contoh Site Folder Rollout
Contoh Site Folder Rollout
SITE DOCUMENTS
TELKOMSEL
RECTIFIER PROJECT
Area:
No. Site ID
NAD218W
1
SUMBAGUT
Site Name
LAM ALUE RAYA
(Acc. Harikristiyanto)
No. 74/PWR/ACA-TSEL/I/2014
To:
Bpk Marlon MP Manurung,Bpk. Victor Sitepu,Bpk. Rudy Irawan,Bpk. Surya,Bpk Bambang
Telkomsel Regional Medan
Perihal: Permohonan Undangan ATP Rectifier
Dengan hormat,
Bersama surat ini kami dari PT. Abhimata Citra Abadi menyampaikan permohonan surat izin pekerjaan ATP
POWER RECTIFIER dengan List Lokasi Site tertera:
1.
2.
3.
4.
5.
6.
7.
8.
9.
NAD218W
NAD254W
NAD273
NAD275W
SGI068
SGI101W
SGI112W
TKN123
TKN708
Tanggal
Waktu
Penanggungjawab
NOz Nama
: 15 25 Oktober 2014
: 09.00 Selesai
: PT. ABHIMATA / CV: Berkah Nabil na 082370558854
Jabatan
No Handphone
ID/KTP/SIM
M. Jamil
Teknisi
0823 70558854
1173020409720003
Musliadi
Teknisi
1111140107800045
Mukhsin
Teknisi
1108080510870003
Demikian permohonan Undangan ATP Rectifier ini kami buat, atas perhatian dan kerjasamanya kami
ucapkan terima kasih.
Zulkarnaini
Project Coordinator Sumbagut
SITE ID
SITE NAME
SITE ADDRESS
: NAD 218W
: LAM ALUE RAYA
:
New System
Upgrade
CONFIG SYSTEM
:
:
M800D
M820B
Serial Number :
EMERSON R48-2000
Rectifier
Rectifier
Rectifier
Rectifier
Rectifier
1:
2:
3:
4:
5:
EMERSON R48-2000e3
Rectifier
Rectifier
Rectifier
Rectifier
Rectifier
6:
7:
8:
9:
10:
BATTERY
BATTERIES
Battery Manufacturer:
Battery Capacity:
Battery Type:
Sacred Sun
6FTJ-100A
Sacred Sun
GFMJ-800AH
No. of battery
banks:
.. AH
Charging Current
Limit:
0.10C10
Battery Breakers:
AH / Bank
. Bank
Bank 2
V
Block 1
V
Block
2 ...................V
Block 3
V
Block
4 ...................V
Bank 3 ..............V
Block
1 .............V
Block
2 .............V
Block 3
.............V
Block 4 ..V
Bank
4 ...............V
Block
1 ................V
Block
2 ...............V
Block 3 V
Block 4 V
NOTE: Battery Open CCT shall be carried out in warehouse prior delivery of batteries to site.
Battery Open Circuit Voltage below 12.30VDC should not be installed and are to be replaced!
5m
in
15
min
30m
in
45m
in
1h
2h
3h
4h
5h
6h
8h
10
h
12
h
20
h
24
h
1.60V
37
5
202
122
89
71.
3
40.
9
29.
6
23.
3
19.
7
16.
9
12.
9
10.
6
8.9
7
5.6
2
4.6
9
1.67V
35
3
195
120
88
70.
9
40.
7
29.
1
23.
1
19.
6
16.
8
12.
8
10.
5
8.9
6
5.5
7
4.6
5
1.70V
34
9
192
118
87
70.
3
40.
4
28.
9
23.
0
19.
3
16.
5
12.
7
10.
5
8.8
7
5.5
6
4.6
5
1.75V
32
1
186
117
87
69.
3
39.
3
28.
6
2.8
0
19.
2
16.
4
12.
6
10.
4
8.8
7
5.5
5
4.6
4
1.80V
28
8
112
83
67.
5
39.
0
28.
4
22.
7
18.
8
16.
1
12.
5
10.
3
8.8
0
5.4
9
4.6
3
173
1.83V
27
4
158
110
80
64.
5
38.
5
27.
5
21.
7
18.
1
15.
5
12.
2
9.9
8.3
7
5.4
8
4.5
6
1.85V
25
7
153
103
77
62.
5
37.
0
26.
7
21.
4
17.
7
15.
2
11.
8
9.9
8.2
6
5.3
8
4.5
2
3
4
Isi Nilai
Klik Set
Isi Nilai
Klik Set
1
2
Isi dengan
3
Site Name
Isi dengan
5
Site ID
7
Isi dengan
Configurasi
4
6
8
Klik Query
10.
Site ID
PHOTO INSTALLASI
Photo Site
Rectifier Position
Distribution
PHOTO INSTALLASI
Battery
View
ACPDB
BUSBAR GROUNDING
RECTIFIER
Site Name / Number
: Lam Alue Raya / NAD 218W
Site Address
:
Type Rectifier
: / PS48300-4A/1800
: .
Serial Number
:
Capacity :
Date Test
:
A.
Rectifier Acceptance Test
Control Unit
Brand : EMERSON
Type : M 800 D
1
'210244025221440C0083
2. RECTIFIER MODULE
2
B.
N
O
1
2
BRAND : EMERSON
S/N 1 : '210213080921450E0087
S/N 2 : '210213080921450D0053
S/N 3 : '210213080921450801C2
TYPE :
S/N
S/N
S/N
S/N
7:
8 : ___________________
9 : ___________________
10: ___________________
PRE-STARTUP
CHECK INTRUCTION
OK
4
5
10
S/N :
S/N 4 :
S/N 5 :
S/N 6 :
Module
V :
1.1.1.1.1
Take
documentation photo
11
NOT OK
Remarks
C. START UP
VALUE INPUT
VRS : ________________V
VRT : ________________V
VST : ________________V
VRN : ________________V
V SN : ____ ____________V
VTN : ________________V
VNG : _______________ V
Frek. ( Hz ) : _________________Hz
N
CHECK INSTRUCTION
O
1
On MCB input in panel ACPDB
2
On MCB Battery
Of MCB input in Rectifier make sure the batter back up ( 2
minutes )
On MCB input in Rectifier
D. SETTING PROGRAM
IR : ________________A
IS : _____ ___________A
IT : ________________A
IN : ________________A
OK
3.
NOT OK
Remarks
N
O
SET POINT
DEFAULT
MEASURE
Float Voltage
53.5 Volt
Volt
Boost Voltage
55.9 Volt
Volt
High Voltage
56.4 Volt
Volt
Low Voltage
45.0 Volt
Volt
Battery Disconect
43.2 Volt
Volt
2 Bank
Bank
7
8
Total capacity
Current Limit
200 Ah
0.10 C 10
Ah
C 10
Remarks
3.1
3.1.1
ACCEPTANCE TEST
E. ALARM TEST
N0
1
ALARM
AC Main Failure
Rectifier Failure
PASS
FAIL
Remarks
F. MATERIAL
NO
NOT
OK
QTY
OK
Rectifier Module
3.2
3.3
3.4
AC Distribution Load
3.5
DC Distribution Load
12
1
2
3
4
5
10
MATERIAL
Remarks
G. FINAL VERIFICATION
NO
DESCRIPTION
OK
NOT
OK
Remarks
3.6
REMARKS ITEM :
ACCEPTANCE TEST
Battery
Type
: SACRED SUN 6 FTJ-100A
:_______10_____ %ofC10
No of Bank : 2 Bank
Vdc/ 100
Ah
N
o
1
2
3
4
S/N Battery
Bloc
k
ORD 01439
E60TRP
ORD 01516
E60TRP
ORD 01216
E60TRP
ORD 01225
E60TRP
Charging Rate
Capacity
Times ( minutes )
Of
10
20
30
40
50
60
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
13.0
12.7
5
12.5
12.4
5
12.4
12.3
5
12.2
5
1
2
3
4
ORD 01515
E60TRP
ORD 01434
E60TRP
ORD 01497
E60TRP
ORD 01340
E60TRP
Total (Vdc ) Bank
Load Current ( A )
48
Remark
s
4
Total (Vdc ) Bank
Load Current ( A )
4
Total (Vdc ) Bank
Load Current ( A )
Approve BY,
_________,___ ____ ____
PT. TELKOMSEL
PT. ABHIMATA
_________________
________________
ACCEPTANCE TEST
Layout
Lokasi
Area
Rectifier
Emerson
TOWER
KWH
METER
Pintu Pagar
FORMULIR KERJA
CHECK LIST ATP POWER SUPPLY
Nama Lokasi
Merk Dan Type Rectifier
No.Unit : '21010707192146A7002B C1
: NETSURE 501AAO /
PS48300-4A/1800
: 3 Module
2 Bank
NO
PENGECEKAN
I.1.
1
2
3
Visual Check :
Kabinet rectifier
Tata letak kabinet rectifier dan kabinet batere
Name Plate
a. Merk / Supplier
b. Type
c. Tegangan nominal output
d. Kapasitas rectifer
e. Tanggal instalasi
Labelling :
OK
NOK
KETERANGAN
I.2.
1
2
I.3.
1
2
I.4.
a. MCB/Fuse input AC
b. LLVD/BLVD
c. MCB/Fuse batere
d. Kabel input/power
e. Kabel grounding
f. Arrester
g. Batere bank
h. Kabel external alarm
Instalasi
Kerapihan instalasi
Kekencangan koneksi
Pengukuran
Tegangan Input
Perbandingan meter internal dan external
a. Tegangan Output
b. Arus Beban
c. Arus Batere
Test Kapasitas Modul Rectifier
FORMULIR KERJA
CHECK LIST ATP POWER SUPPLY
I.5.
I.6.
Setting Rectifier
Test Fungsi
a. Back up batere
b. LLVD/BLVD
c. External alarm
II.
NO
II.1.
1
2
3
4
II.2.
1
2
3
PENGECEKAN
Visual Check :
Kondisi fisik batere
Name Plate
a. Merk
b. Kapasitas batere
c. Tanggal instalasi
Kebersihan
Data test kapasitas batere di
Pabrik/warehouse
Instalasi
Kerapihan
Kekencangan koneksi
Pelindung terminal batere
OK
NOK
KETERANGAN
BATERE
Catatan:
PT. Telkomsel
Di Periksa Oleh : __________________
Tanggal : ___________________
Tanggal : __________________
Tanda Tangan :
Tanda Tangan :
____________________
NIK :
NIK :
RECTIFIER CHECKLIST
OF DOCUMENTS
SITE NAME
SITE
ID
: Lam Alue
Raya
: NAD 218W
AREA
: SUMBAGUT
: INSTALL
POWER
RECTIFIER
TYPE OF
WORK
N
O.
1
Description
Supporting Documents
1.
1 WTCR
1.
2 BAUT
1.
3 Warranty Certificate
Site
Folder
2. Power System
1 Configuration
Constant Current
2. Discharge Characteristic
2 Units
Potograp
hs
3.
1 Photographs
Acceptan
ce Test
4. Rectifi
1 er
4. Batter
2 y
Abhimat
a
Remarks
Layout
5. Layou
1 t
Wiring
Diagram
7.
1 Wiring Diagram
T-Sel
YES
NO
YES
Deficience Found
NO