Project Owner Contractor Date
Project Owner Contractor Date
Project Owner Contractor Date
PROJECT
OWNER
CONTRACTOR
DATE
NO.
DESCRIPTION
PURCHASE REQUEST
QUANTITY
UNIT
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
REQUESTED BY:
RELEASED BY:
PREPARED BY:
CASILI CRIS B.
PIC
APPROVED BY:
RELEASED
QUANTITY
ES
ITEM NO:
ASED
UNIT
BALANCE
QUANTITY
UNIT
NOTED BY:
MACQUILLE TRAMPE
IPM
DATE
TO
FROM
SUBJECT
:
:
:
:
FEBRUARY 23,2016
ROCKWELL PRIMARIES DEVELOPMET CORPORATIONS
METROLINK CONSTRUCTION DEVELOPMENT CORPORATIONS
WAREHOUSE OFFICE
ESTIMATED COST
LABOR COST
ITEM
1
2
3
ITEM DESCRIPTION
Skilled
Helper
Site Architect/Engineer
UNIT
days
days
days
QTY
15
15
10
UNIT
sets
QTY
2
EQUIPMENT COST
ITEM
1
2
3
4
ITEM DESCRIPTION
Power Drill
5% Material Contingency
5% Labor Contingency
Prepared by:
Noted By:
CASILI CRIS B.
Project Incharge
Approved By:
MR. CHRISOPHER
Director of Oper
RPDC
UNIT PRICE
700.00
500.00
1000.00
TOTAL
PRICE
10500.00
7500.00
10000.00
28000
UNIT PRICE
200.00
PRICE
400.00
0.00
0.00
0.00
0.00
TOTAL
28000.00
400.00
28400.00
1420.00
1420.00
5680.00
5680.00
3408.00
aterial Contingency:
% Labor Contingency:
20% Mark-up:
Overhead Expenses:
12% VAT Inclusive:
GRAND TOTAL:
say:
46008.00