Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Inspection Checklist - Field Maintenance Report: Busse

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

BUSSEMF

Inspection Checklist Field Maintenance Report


Ident-Nr.:
Type:
Location / Operator:

General
Date________
Time in ________ Out __________
Field Technician(s)_____________________________________
Inspection call

6 / 12 / 18 / 24 / 36 months
Regular Service

Regular service
Sample

Repair of deficiencies
Troubleshooting

Plant status
Counter

Hours of operation _____________________ [h]


Permeate _____________________ [gal]

Water: _____________________ [gaq

Accessibility

Yes

NO

System operates

Yes

NO

Cover free from defects

Yes

NO

System recovers

Yes

NO

Check

fully functional
fully functional
fully functional
fully functional

defect
defect
defect
defect

solenoid valve
pumping system
pressure increasing

fully functional
fully functional
fully functional

Septic / first buffer Soloids


Odor

sanitary napkins
aerobic

Fat I Wax
septic/fecal

Other:________________
soapily
acid

MBR

thin (MLSS <10)


thick (10< MLSS <20)
aerobic
septic /fecal
without color
slightly yellow
odorless (fresh)
musty I muffled
free of suspended solids
suspended solids

extremely thick (MLSS>20)


soapily
actd
yellow
brown
fecal

Permeate

Air blower
Submerged pump
Level switch
Air-lift pump

Texture (optically)
Smell
Color
Odor
Turbidity

Samples (before service)

defect
defect
defect

pH-Value. Alkalinity, TSS. Turbidity, cBOD, COD, TKN,NO3

Permeate flow before service ___________________ [gal/h] after service ___________________ [gal/h]

Carried out
Samples

before service
after service

Pumping

Septic tank

Change of membranes

Yes

Cleaning of

Septic tank

Buffer tank

Buffer tank
NO

____ [pieces]

Yes

Buffer tank
Septic tank
tub aeration
inspection glass
Air Blower

MBR
Buffer tank
Level switches
___________

solenoid valves

NO

Functional check

pumps & piping


Permeation

aeration
Alarm panel

Active carbon filter

Check

cleaning

Remarks:

Permeate

MBR

Septic tank
Coarse matter separation
membrane modules
Venting
pumping system

Disposal of solids Septic tank I buffer tank

MBR
MBR

change of

_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________

___________________________

________________________

BUSSE Innovative System GmbH

Customer/Operator

You might also like