Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

DEPRO

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

Premier Production Fabricators L.L.C.

Estimation Sheet
Client Name : DEPRO Date : 18 Oct 2010
Description : Fabrication, Painting & Supply of Transport Frame Lifting Arrangement
Qty 01 No. Ref : Enq # 07

Sr. No. Description Qty.M/No./M² Unit Price R.O Total Price R.O

1 Hollow Tube: 120 x 60 x 5mm x 6Mtrs Length 1 50.000 50.000


2 Hollow Tube: 80 x 80 x 5mm x 6Mtrs Length 6 26.000 156.000
3 Hollow Tube: 80 x 80 x 4mm x 6Mtrs Length 2 23.000 46.000
4 Hollow Tube: 75 x 75 x 4mm x 6Mtrs Length 2 22.000 44.000
5 Hollow Tube: 60 x 60 x 5mm x 6Mtrs Length 1 20.000 20.000
6 Hollow Tube: 60 x 60 x 4mm x 6Mtrs Length 4 19.000 76.000
7 Flatbar: 100 x 5mm x 6Mtrs Length 2 8.000 16.000
8 Flatbar: 40 x 5mm x 6Mtrs Length 2 4.000 8.000
9 Roundbar: Dia 50mm x 6Mtrs Length 1 40.000 40.000
10 Roundbar: Dia 40mm x 6Mtrs Length 1 30.000 30.000
11 Gratings: 900 x 25 x 4.5 x 6Mtrs Length 1 80.000 80.000
12 Plate: 25mm x 25% of 4'x 8' 1 55.000
13 Plate: 20mm 1 2.000
14 Plate: 10mm 1 3.000
15
16
17
18
19
Material Cost 626.000

Blasting 40.000
Labour Cost 330 M/H @1.200 396.000
Overheads 50.000
Consumables 30.000
Painting 80.000
Transportation NO

Prepared By
Grand Total R.O 1222.000
Profit % 25 305.500
Approved By
Total with Profit 1527.500
Format No. SL/F22 Rev00, Date : 10-10-2007, Page - 1 of 1

You might also like