Method Statement - Project Management Assignment
Method Statement - Project Management Assignment
MS-EH-01/00
METHOD STATEMENT
Definition:
The process in preparing a construction site by putting up a fencing system along the
perimeter of the site is referred to as erecting of hoarding. Fencing panels can be
rapidly assembled, however, care does need to be taken to ensure the panels are
stabilised correctly.
SITE CONSIDERATIONS
Assess access and condition of site for delivery and storage of hoarding stillages
Assess access and conditions of site for safe erecting procedures.
Assess condition of ground in the proposed perimeter.
STRUCTURAL CONSIDERATIONS
Ensure ground is able to support concrete fence bases.
Ensure consideration against wind loading is taken when erecting hoarding systems
in exposed location.
PROTECTIVE CLOTHING
Hard hat, Safety footwear, Gloves and overalls should always be worn when erecting
hoarding systems.
METHOD
YES
SITE
CONSIDERATIONS
YES
VERIFY
STRUCTURAL
CONDITIONS
AWAIT
ARCHITECT'S
NO INSTRUCTIONS TO
APPROVAL
PROCEED
YES
PROJECT PLANNING
& LOGISTICS
ENSURE
GROUND IS NO LEVEL GROUND
LEVEL
YES
FIT GATES
ARCHITECT'S
NO REMEDIAL ACTIONS
APPROVAL
YES
FIT ANTI-LIFT
DEVICES
FIX STABILISERS
YES
SITE
CONSIDERATIONS
YES
VERIFY
STRUCTURAL
CONDITIONS
AWAIT
ARCHITECT'S
NO INSTRUCTIONS TO
APPROVAL
PROCEED
YES
PROJECT PLANNING
& LOGISTICS
ENSURE
GROUND IS NO LEVEL GROUND
LEVEL
YES
FIT GATES
ARCHITECT'S
NO REMEDIAL ACTIONS
APPROVAL
YES
FIT ANTI-LIFT
DEVICES
FIX STABILISERS
FIT GROUND
SKIRTS
FIT SIGNAGE
CLEAR SITE