MM Enterprise Structure Configuration
MM Enterprise Structure Configuration
MM Enterprise Structure Configuration
Configuration Pack
Enterprise Structure
Published by Team of SAP
Consultants at SAPTOPJOBS
Visit us at www.sap-topjobs.com
Copyright 2006-07@SAPTOPJOBS
back from you and we will do our very best to ensure that
Happy reading and wish you the very best in your SAP
career.
heymm@sap-topjobs.com
Over-view:-
• Planning
• Procurement
• Inventory Management
Planning: -
Procurement: -
Procurement Proposals: -
Purchasing: -
a. Purchase Order
b. Contracts
c. Scheduling Agreement
c. Scheduling Agreement: -
Inventory Management: -
• Vendor Master
• Source List
MRP takes the inventory into account and also the expected
receipt and issues during MRP run which is the vital data for
successful MRP.
MM with PP
MM with QM
MM with SD
MM with PM
MM with FI
• Enterprise structure
• Planning
• Purchasing
• Inventory Management
Define Plant
Define Storage Location
Assign Plant to a company
Define Purchase Organization
Purchase organization assignment
Defining material master field selection
Material Master Plant specific field selection
Define Material Type
Define number range for material type
Define Industry sector for material master.
Configuration - Planning:-
Configuration – Purchasing: -
BACKGROUND
INSTRUCTIONS
2. Click
3. Click on
4. Click appropriate node to look at more details.
company code
controlling area
Plant
Storage location
Sales organization
BACKGROUND
Plant level
INSTRUCTIONS
Follow the Menu Path: IMG → Enterprise structure →
Definition → Logistics - General → Define valuation level
1. Click
2. Select the radio button
3. Click Save
Define Plant
BACKGROUND
This configuration setting enables to define the plant. Each
manufacturing facility or branch of a company is defined as
a plant in SAP.
INSTRUCTIONS
1. Click
2. Click
3. Click
4. Click
7. Click
BACKGROUND
INSTRUCTIONS
1. Double click
3. Click
4. Click
BACKGROUND
INSTRUCTIONS
1. Click
2. Click
4. Click
6. Enter country
7. Click
8. Click .
Maintain Storage Location
BACKGROUND
INSTRUCTIONS
Click
Click
Click
Click
Double Click
Click
Select the sequence number
Click
Maintain the address.
Click
Click
BACKGROUND
INSTRUCTIONS
1. Click
2. click
4. Click .
Assign Plant to company
BACKGROUND
INSTRUCTIONS
1. Click
3. Click
5. Click
6. Click .
Assign purchase organization to the company
code
BACKGROUND
INSTRUCTIONS
1. Click
3. Click
5. Click
6. Click
Assign purchase organization to plant
BACKGROUND
INSTRUCTIONS
1. Click
3. Click
5. Click
6. Click
Example:
Basic D
Assign field to field selection groups
BACKGROUND
INSTRUCTIONS
1. Click
2. Click in purchasing value key row
3. Create new field ref by copying from the standard SAP
entry. E.g. IND6 as field reference.
4. Click
BACKGROUND
When there are more than one Bill Of Material, system will
select the first alternate by default.
INSTRUCTIONS
1. Click
3. Click Save .
Define material type
BACKGROUND
Only the menu path is given here and the rest of the settings
are similar to above 1.1.8.
INSTRUCTIONS
1. Click
Double click
Select the check box only in the relevant valuation area. E.g.
IND6, IND7 and IND9
7. Click
8. Click
9. Click Save
BACKGROUND
INSTRUCTIONS
1. Click
2. Click
4. Maintain the Text for the new group and maintain the
interval for internal and external number range
5. Click .
8. Click
10. Click
11. Click .
Define industry sector
BACKGROUND
INSTRUCTIONS
1. Click
3. Click
7. Click
8. Click
Maintain user specific settings
BACKGROUND
INSTRUCTIONS
1. Click
2. Click
3. Click
4. Click
5. Click
BACKGROUND
INSTRUCTIONS
1. Click
BACKGROUND
INSTRUCTIONS
1. Click
3. Click
4. Select 1 to exclude storage location from MRP
5. Click