4 Laning As Per IRC SP 84 2009

Download as pdf or txt
Download as pdf or txt
You are on page 1of 56

D.V.Bhavanna Rao. M.Tech., F.I.E.

,
C.E. AP R&B Retired
Consultant (Roads & Highways)
in

for more presentations on Roads


and Bridges, please visit
http://aproadbuildqa.blogspot.com
bhavanna.r@egis-india.com
General

a) In built up areas, 6-lane divided carriageway


along with service roads shall be provided as part of
4-laning of the project Highway. Such stretches
where the requirement of 6-laning is dispensed with
and only 4-laning with or without service road and
footpath is to be provided as indicated in schedule
B.
b) Where there is a constraint of ROW width,
the authority may specify construction of a bypass.
The alignment of bypasses shall be as specified in
Schedule B and in conformity with the site
earmarked in Schedule A of Concession
Agreement.
Design Speed in Km/hour

Cross slope Design speed (km/hour)


Nature of
of the
terrain
ground Ruling Minimum

Plain and
Up to 25% 100 80
Rolling
Mountainous More than
60 40
and Steep 25%

Short stretches (say less than 1 km) of varying terrain


met with on the road stretch shall not be taken into
consideration while deciding the terrain classification for
a given section of a Project Highway.
Minimum width of median
Minimum width of median (m)
Plain and rolling Mountainous and
Type of section terrain steep terrain
Depressed
Raised Raised
Median
Open country
with isolated 4.5m 7.0m 2.0m
built up area
Built up Area 2.0m Not applicable 2.0m
Approach to
grade separated 4.5m Not applicable 2.0m
structures
Type and widths of median at various stretches
shall be as indicated in Schedule B.
Width of shoulders in Plain and Rolling Terrain

Width of shoulder (m)


Type of Section
Paved Earthen Total
Open country with
isolated built up 1.5m 2.0m 3.5m
area
Built up area 2.0m - 2.0m
Approaches to
grade separated 2.0m - 2.0m
structures
Approaches to
1.5m 2.0m 3.5m
bridges
Width of Shoulders in mountainous
and steep terrain (Hilly Area)
Width of shoulder including drain and
Type of Section
crash barrier as applicable
Open country with 1.5m (on hill side) Earthen
isolated built up area 2.0m (on valley side) shoulder
Raised footpath
along with
Built up area and
1.5m (on hill side) provision of
approaches to grade
2.0m (on valley side) adequate
separated
drainage along
structures/bridges
and across
footpath
In mountainous and steep terrain, the scope of work defined by the
authority may be two lane carriageways on different alignments
(contours). In that case IRC: SP:73-2007 shall apply to two lane
carriageways on different alignments.
Extra width of pavement and roadway
In each carriageway

Radius of curve extra width

75 - 100m 0.9m

101 - 300m 0.6m

The cross fall on straight portions of road


carriageway, paved shoulders and paved portion of
median shall be 2.5% for bituminous surface and 2.0%
for CC surface.
Super elevation shall be limited to 7%, if radius
of curve is less than desirable minimum radius. It
shall be limited to 5%,If radius of curve is more than
desirable minimum.
Minimum radii of horizontal curves

Desirable Absolute
Nature of terrain
minimum minimum

Plain and rolling 400m 250m

Mountainous and steep 150m 75m

The radius of horizontal curves for various


terrain conditions shall not be less than the desirable
minimum given above except for sections as indicated
in schedule B.
For such sections, the radius shall not be less
than absolute minimum.
Safe sight Distance

Safe Stopping Desirable


Design Speed
Sight minimum
Km/hour
Distance sight distance

100 180m 360m


80 130m 260m
60 90m 180m
40 45m 90m
Vertical alignment should provide for a smooth
longitudinal profile. Grade changes shall not be too
frequent as to cause kinks and visual discontinuities in
the profile. IRC: 73 should be kept in view.
Ruling and Limited Gradients
Nature of Ruling Limiting
terrain gradient gradient
Plain and
3.3% 5.0%
rolling
Mountainous 5.0% 6.0%
Steep 6.0% 7.0%
Long sweeping vertical curves shall be
provided at all grade changes. These shall be
designed as square parabolas.
Design of vertical curves and its
coordination with horizontal curves, shall be in
accordance with IRC:SP: 23.
Cattle and pedestrian under/ overpass

These shall be provided as specified in


Schedule B.
1) An under/overpass for crossing of cattle and
pedestrians may not be necessary within 2 km
from vehicular underpass
2) Width of crossing shall not be less than 5m.
3) Pedestrian crossings shall have provision for
movement of physically challenged persons.
4) Underpasses shall be preferred to Overpasses
5) PUP/ POP shall also be provided within a
distance of 200m from a school or hospital or
factory/ industrial area.
Lateral clearance at Underpasses

1) Full roadway width at the approaches shall be


carried through the underpass. This width shall
not be less than 12m (7m Carriageway + 2 × 2.5m
shoulders) or as indicated in schedule ‘B’.

2) Guardrails/Crash barriers shall be provided for


protection of vehicles from colliding with the
abutments and deck of the structures.

3) The width of cattle and /or pedestrian underpass


shall not be less than 5m.
Vertical clearance at Underpasses

1) For vehicular underpass: 5.5m Minimum

2) For pedestrian and cattle under pass:

3.0m (to be increased to 4.5m in case


certain categories of animals such as
elephant/camel are expected to cross the
project highway frequently. This will be as
specified in Schedule ‘B’)
Lateral and Vertical clearance at Over
pass

Full roadway width shall be carried


through the overpass structure unless
otherwise specified in Schedule B. Provision
shall also be made for future widening to 6-
lane with service roads. Crash barriers shall
be provided on abutment side and on sides of
pier to protect collision.

Vertical clearance at Overpasses: 5.5m


minimum at all points of the carriageway.
Access Control
Access to the Project Highway shall be
provided at the following locations:

1) Intersection with National Highways


2) Intersection with State Highways
3) Intersection with major District Roads
4) Intersection with Village roads/Other roads
subject to a minimum distance of 3 km
from the nearest intersection.
Service Roads
1) Width of service shall be 7m. Their length and
location shall be included in schedule B.
2) For stretches where bridge length is less than
60m and service road is required on both sides
of stream, service road shall continue across the
stream by providing 2-lane bridges.
3) For bridges length of 60m or more, separate
bridge structures may not be necessary. Service
road shall be merged with Project Highway at
50m before the bridge structure unless otherwise
specified in Schedule B.
4) Service road crust shall be designed for 5 MSA of
design traffic in 4-laning and for 10 MSA in case
of 6-laning with design CBR at project site.
Grade Separated Structures
All the details shall be specified in
Schedule B. The approach gradient to the
grade separated structure shall not be
steeper than 2.5% (1 in 40).
Geometric design standards for various
elements of grade separators shall be as per
IRC:92
Vehicular under/overpass shall be
provided at the intersection of project
highway with NH and SH. Such under/
overpass shall be provided on other roads
carrying Average Daily Traffic of more than
5000 PCUs on the date of inviting bids.
Median Openings
 Median openings shall not be spaced closer than 2
km. Additional controlled openings shall also be
provided for inspection and diversion of traffic
during repair and rehabilitation.
 Median opening shall not be provided in front of the
service road entry. Location of opening shall be so
decided to minimize intraflow. This distance shall not
be less than 150m.
 All median openings shall be provided with
additional 3.5 m shelter lane by the side of median in
both directions for waiting vehicles to take U turn.
 Length of median opening shall not be less than 20
m.
 Fencing shall be provided to separate service roads
and Project highway.
Design Service Volume for 4-lane highways in PCUs per day

Design Service Volume in PCUs per day


Terrain
Level of Service ‘B’ Level of Service ‘C’
Plain and Rolling 40,000 60,000
Mountainous and
20,000 30,000
Steep

Unless or otherwise specified in the C.A.,


the Project Highway shall be widened to 6-lane
when total traffic including that in service roads
reaches the design service volume
corresponding to level of service ‘C’ mentioned
above.
Important Features to be studied and finalized
in Road Embankment design

1)Design of embankment and remedial/ground


improvement treatment where necessary.
2)Construction methodology for embankments
with height more than 6m.
3)Design of retaining walls/ earth retaining
structures.
4)Protection measures for slopes and drainage
arrangement.
5)Design of pond ash embankment where use
of pond is proposed as per IRC:SP:58.
Important Features to be studied and
finalized in Road Cut Section design

1) Type of cutting involved and proposed


cut slopes.
2) Slope Stability measures like pitching
and breast walls.
3) Details of erosion control measures.
4) Drainage arrangement to divert seepage
water in case of cut sections in hilly
terrain like deep side trains. Their slope
shall not be flatter than 1 in 200.
Method of Design of Pavement and design
period

1) For flexible pavement, IRC:37 Guidelines for


design of flexible pavement. Design period is 15
years or operation period whichever is more.

2) For Design of Rigid pavement, IRC:58 Guidelines


for the design of Plain Jointed Rigid Pavements for
Highways. Design period is 30 years
Flexible Pavement – Design and
Strategy

1) Design of flexible pavement for design life of


15 years or operation period, whichever is more.
2) Stage Construction:
a) Thickness of sub- base and base layers for
full design period and initial bituminous surfacing
for a minimum design period of 10 years.
b) Pavement shall be strengthened by
bituminous overlay as and when required to extend
the pavement life to full operation period.
Rigid Pavement – Design and Strategy
1) Design period: 30 years.
2) Pavement Quality Concrete (PQC) shall
rest on Dry Lean Concrete (DLC) sub base of
150mm thick.
3) DLC shall meet minimum cement and
compressive strength requirements as specified
inIRC:SP:49. It shall extend PQC by 0.5m on either
side.
4) below DLC layer Granular Sub Base (GSB)
layer 150 mm thick shall be provided throughout
the road width. It shall be designed to obtain a
drainage coefficient of not less than 20 m per day.
Performance Evaluation

1) Roughness of each lane for full length


shall be measured bi-annually using approved
method and equipment.
2) Structural evaluation of the pavement
shall be made by taking deflection
measurements every 5 years in accordance
with the procedure given in IRC:81, unless
needed earlier for stretches exhibiting severe
distress during the operation and
maintenance period.
Strengthening of existing pavements

1) Extent of distress, nature of deficiency and


treatment required shall be assessed.
2) Necessary corrective measures to be taken
as per schedule K.
3) Extensively damaged stretches are to
designed as a new pavement.
4) Where the existing pavement built over an
untreated expansive/ black cotton soil sub grade
shall be treated separately and require
reconstruction.
5) No granular layer shall be provided over an
existing bituminous surfacing.
Design of Overlay

1) Thickness of overlay shall be assessed


on BBD deflection technique as per IRC:81
and existing structural layers.
2) Design period shall be the same as
specified for the new pavement.
3) Design traffic will be estimated as per
the procedure described for new pavement.
4) Thickness of bituminous overlay for
pavement strengthening shall not be less than
50 mm BC.
Paved Shoulders

1) Paved Shoulders shall be provided for


a width of 1.5m.
2) If the existing thickness of paved
shoulder, if any, is less than the thickness of
existing pavement, the paved shoulders shall
be reconstructed to the pavement thickness
in the adjoining carriageway.
Construction, Workmanship and Quality
of works shall be as per section 900 of
MORTH Standard Specifications for Road and
Bridge works.

In case of premature distress in the form


of cracking, rutting, patching, loss of camber
or any other structural or functional distress,
necessary remedial measures shall be
undertaken for conforming to the minimum
requirements prescribed in schedule K of CA.
In case of repetition of distress,
reconstruction shall be resorted to after
proper investigations.
Highway Drainage

For efficient drainage system for the


entire Project Highway including structures
and facilities, directions contained in clause
309 of MORTH specifications, IRC:SP:42 Road
Drainage and IRC:SP:50 Urban Drainage as
relevant shall be followed.
Surface Drainage
Surface Drainage: The water from
road and adjacent areas shall be
intercepted and carried through roadside
drains to natural outfalls.

As far as possible, longitudinal slope


shall not be less than 0.5% for lined drains
and 1.0% for unlined drains.

the side slopes of unlined drains shall


be as flat as possible and shall not be
steeper than 2H:1V.
Sub-Surface Drains shall be provided
a) for lowering the water table for
drainage of sub- grade.
b) for drainage of pervious sub-base in
situations where it may not be practicable to
extend the sub-base across the shoulder.
c) for control of seepage flow
d) for control of capillary rise
Sub surface drains outside the road
pavement shall be sealed at the top to avoid
percolation of surface water into these
drains.
Aggregate Drains

a) The trench for aggregate drain shall


be of minimum 300mm width and cut to a
depth to expose the granular pavement
courses to be drained.

b) Aggregate grading shall be as per


table 8 of IRC SP: 42.

c) the aggregate drain shall be


provided with a geo-textile wrap to act as
filtration and separation layer.
Drainage of Embankment with height above 3 m

In high embankments and approaches to


bridges, special arrangement for protection of slopes
shall provided as per clause 7 of IRC: 42, in order to
ensure that embankment slopes maintain their shape
during the monsoon season.
Drainage arrangement shall include provision of
kerb channel at the edges of roadway to channelize
the water, and CC lined chutes along the slopes at
desired intervals to discharge water into side
channels.
The chute drains and drains at toe of the
embankment shall be of Plain Concrete (M15 grade) ,
over proper bedding.
Median Drainage

The median should have adequate longitudinal


slope to the nearest culvert to drain off transversely.
In case the carriageway is sloping towards un
kerbed median (wider than 5 m), provision of a central
swale shall be made for the drainage of median. The
swale shall slope longitudinally for drainage, water
intercepted by inlets at intervals and discharged
through transverse drains into outlet channel.
Median width 7 m or less shall be turfed or paved
and could be crowned for drainage across the
pavement.
In super elevated sections, proper arrangement
shall be made without allowing water drain on the
other carriageway.
General Requirements for Structures

1) All bridges shall have independent


superstructure for each direction of travel unless
otherwise specified in Schedule B. culverts may have
single or independent superstructure.
2) Viaduct spans shall be provided if the height
of solid embankment in built-up sections is more than
5m.
3) Width of median in the culvert and bridge
portion shall, as far as possible, be kept same as that
in approaches. In case median width is different from
that of approach section due to site constraints,
suitable transition shall be provided near approaches
for guiding vehicular traffic.
General Requirements for Structures -
continued

4) For median in structures portion, a suitably


designed catch pit shall be provided to collect and
carry discharge from median drain. For bridges, where
the median is more than 1.2 m wide, it shall be open to
sky. Safety barrier on the median side shall be
provided at a clear distance of 0.5 m from carriageway
edge.
5) Suitable provision shall be made for retaining
earth in median portion either by extending abutment
wall or constructing a new retaining wall.
6) Any utility service to be carried by the
structures shall be specified in Schedule B of C.A.
Width of Structures to be provided
New Culverts : Overall width of all culverts shall be
equal to roadway width of the approaches. Outermost
face of railing /parapet shall be in line with the outer
most edge of shoulder.
New Bridges: 1) Overall width of new bridge shall
be same as the roadway width of approaches. All new
bridges shall have a footpath on left side of the traffic.
2) Where the daily traffic exceeds 30,000 at the
time of feasibility study/bidding, width of new bridge the
width of new bridge shall be as per six-lane standards.
3) Where the length of bridge structure including
grade separated structure exceeds 1 km, provision shall
be made for passing place at the rate one passing place
for every one km. No such requirement of passing place
for 6-lane structure
Width of Structures – Existing Culverts

All culverts which are structurally distressed or


not having sufficient vent/size shall be
reconstructed as new structures of standard width.
All existing culverts which are not to be
reconstructed shall be widened equal to roadway
width of the approaches.
Culverts and Hume pipe structures shall be
widened to make the standard deck width mentioned
earlier. If additional widening width required is less
than 0.5 m, widening may be dispensed with and
traffic shall be guided with the help of crash barriers
in a transition of 1 in 20 on either side of
approaches.
Width of Structures – Existing Bridges
All bridges which are structurally distressed
shall be reconstructed as new bridges.
Bearings, expansion joints, railings, crash
barriers, wearing surface etc., which are not in
sound condition, shall be replaced.
If the width of additional widening is less than
1.0 m (0.5 m on each side) or less widening may be
dispensed with and necessary traffic guidance
measures taken.
Bridges having 2-lane carriagway particularly
those with T-beam/ box type superstructure with
well/ pile foundations, which are in sound condition,
may be retained. Width of new structure constructed
on other side shal be as specified earlier.
Culverts and Bridges using pipes

NP4 RCC pipes conforming to IS: 458 shall be


used. Minimum diameter of pipes for new culverts shall
be 1200 mm.
Existing culverts of 900 mm diameter and above,
which are in sound condition and functioning
satisfactorily, may be extended using the same diameter
pipes.
All culverts with pipe diameter less than 900 mm
shall be replaced with minimum 1200 mm diameter.
Minimum depth of earth cushion over pipe
including road crust shall not be less than 1000 mm for
new culverts. In case of existing sound and safe culverts
a minimum cushion of 600 mm may be OK.
In case of insufficient cushion, encasing of pipe in
concrete shall be ensured.
Safety Barriers

(i) For bridges without foot paths, concrete


crash barriers shall be provided at the
edge of the carriageway on all new
bridges.
(ii) The type design for the crash barriers may
be adopted as per IRC:5. The design
loading for the crash barriers shall be as
per Clause 209.7 of IRC:6.
(iii) For bridges with foot paths, pedestrian
railing shall be provided on the outer side of
footpath.
Road Over Bridge (Road over Rail)
(i)In case a 2-lane bridge exists over the railway tracks,
another two-lane bridge shall be constructed for one side traffic.
(ii)In case the bridge is to be provided over an existing level
crossing, twin 2-lane bridges shall be constructed with overall
width as given in Sub-Para 7.3 (ii) of this Section. If the alignment
of road at the existing railway crossing has skew angle more than
45 degrees, the alignment of road or of pier/abutment shall be
suitably designed to reduce skew angle up to 45 degrees.
(iii)The horizontal and vertical clearances to be provided
shall be as per requirement of the Railway authorities.
(iv)The Concessionaire shall be required to obtain
approvals of all designs and drawings from the concerned Railway
authorities.
(v)The construction of ROB within the railway boundary
shall be under the supervision of Railway authorities.
(vi)The approach gradient shall not be steeper than 1 in 40.
Road under Bridges (Road under Railway line)
(i) Full roadway width as in the approaches shall pass
below the bridge structure allowing for widening of
Project Highway to 6-lane at a later date. The service
roads where provided shall be continued in the bridge
portion also.
(ii)The vertical and lateral clearances shall be as per
guidelines given in Section 2 of this Manual.
(iii) These structures shall be designed to carry railway
loads. The Concessionaire shall be required to obtain
approvals of all designs and drawings from the
concerned Railway authorities. The design of structure
shall be in accordance with relevant Railway codes.
(iv) The construction of RUB and its approaches shall be
carried out in conformity with the terms specified in the
approval granted by the Railway authorities.
Materials

i) All materials to be used in works shall be in conformity


with the requirements laid down for relevant item in IRC/MORTH
Specifications unless otherwise specified in this Section. If the
Concessionaire proposes to use any material, which is not
covered in IRC/MORTH Specifications, it shall conform to relevant
Indian Standards, if there are any, or to the International
Standards. Proprietary products proposed to be used shall be
proven by use in comparable international road and bridge
projects, and shall be supported with authenticated licensing
arrangement with the manufacturer.
(ii)The Concessionaire shall identify the proposed sources
of materials and submit the proposal prior to delivery. If it is found
that proposed sources of supply do not produce uniform and
satisfactory products at any time during execution, the
Concessionaire shall procure acceptable materials conforming to
the specifications from other sources.
For manufactured items, Concessionaire shall
submit the following details

a) Name of manufacturer and name of


product/process/system
b) General features of the product/process/system
along with specifications and standards adopted
for the product /process /system
c) Authenticated copies of license/agreement
d) Details of projects where the
product/process/system has been successfully used
e) Limitations, if any
f) Acceptance tests and criteria
g) Installation and maintenance procedure and
schedule
h) Performance warranty.
Structural Concrete

The Concrete for use in structures shall


conform to the provisions in Clauses 302.6 to 302.9
of IRC:21 and Section 1700 of MORTH
Specifications. Wherever High Performance
Concrete (HPC) is proposed to be used, the same
shall conform to the provisions of IRC:SP:70.
Sampling and testing of concrete shall be as per
Clause 302.10 of IRC:21. Acceptance criteria for
concrete shall conform to Clause 302.11 of IRC:21.

Cement
Any type of cement specified in IRC:21 may be
used for the works subject to limitations, if any,
specified therein.
Coarse Aggregates

Before commencement of the works, at


least three samples, in accordance with the
procedure laid down in IS:2430, shall be taken
for each quarry source to ascertain the
quality, suitability and fitness of the available
material for use in the works. Fresh tests shall
be conducted in case there is any change in
the source or the type of rock being quarried.
The proposal, along with a copy of test
reports, shall be submitted.
Sand/Fine Aggregates

(i) All fine aggregates shall conform to IS:383


and tests for conformity shall be carried out as per
IS:2386 (Part I to VIII). The fineness modulus of fine
aggregates shall be between 2.0 and 3.5.
(ii) Before the commencement of the works, at
least three samples as per IS:2430 shall be taken for
each quarry source to ascertain the quality,
suitability and fitness of the available material for
use in the works and the proposal along with a copy
of test reports shall be submitted to the IE for
review and comments, if any.
(iii) Fine aggregates having positive alkali-
silica reaction shall not be used.
Water

(i) Water for use in the works for mixing and


curing of concrete shall be in conformity with
Clause 302.4 of IRC:21.

(ii)Water from each source shall be tested


before the start of works and thereafter every
three months and after each monsoon till the
completion of the works and the proposal
along with a copy of test reports submitted to
the Independent Engineer for review and
comments, if any.
Chemical Admixtures
(i) Shall comply with IS:9103 and meet the requirements
stipulated in clause 5.5 of IS:456.
(ii) Admixtures generating hydrogen or nitrogen or containing
nitrates, sulphides, sulphates, or any other material liable to affect
the reinforcement/ embedment or concrete shall not be used.
(iii) Compatibility of admixture with the cement being used shall be
tested before actual use in the works.
(iv) Admixtures shall not impair the durability of concrete. They
shall not combine with the ingredients to form harmful compounds
or endanger the protection of reinforcement against corrosion.
(v)The packaging of admixtures shall clearly indicate the name of
the manufacturer/ supplier, brand name (name of the product),
date of production and expiry, batch/ identification number.
vi) pH value and colour.
(vii) Latest date of test and name of the laboratory.
(viii) Shelf life, maximum and minimum temperature for storage,
precautions to be taken while mixing etc., in use.
Steel for Prestressing

In addition to the requirement mentioned in


Clause 1009.2 of MORTH Specifications, the steel for
prestressing shall satisfy following conditions:
(i) Uncoated stress relieved low relaxation steel
conforming to IS:14268.
(ii) Prestressing steel shall be subjected to
acceptance tests in respect of modulus of elasticity,
relaxation loss at 1000 hrs, minimum ultimate tensile
strength, stress- strain curve etc. prior to actual use
on works as per guidelines contained in BS:4447.
The modulus of elasticity value, as per acceptance
tests, shall conform to the design value, which shall
be within a range not more than 5 per cent between
the maximum and the minimum.
Reinforcement/ Un-tensioned Steel
(i) Only Fe 500 grade of steel shall be used on works and all reinforcing
steel for use in works shall be procured from main/ major producers. Fe
415 grade of steel can also be used where permissible as per IRC
Codes and Guidelines.
(ii) Only fresh steel shall be brought to the site. Every bar shall be
inspected before assembling on the work; and defective, brittle or burnt
bars shall be discarded. Cracked ends of bars shall be cut before use.
(iii) Only Thermo Mechanically Treated (TMT) bars conforming to
IS:1786 shall be used as reinforcing steel.
(iv) All reinforcement shall be free from loose rust and coats of paints,
oil, mud or any other substance, which may destroy or reduce bond.
The reinforcement bars bent and fixed in position shall be free from
loose rust or scales, coats of paints, oil, mud or chloride contamination
and other corrosion products. Where cleaning of corroded portions is
required, proposal for effective method of cleaning such as sand
blasting shall be submitted to the IE for prior review and comments.
(v) Proprietary steel products will be permissible provided they conform
to the minimum requirements.
Steel for Bearings

Mild steel, high tensile steel, cast steel,


steel forgings, and stainless steel shall
conform to the provisions contained in clause
925.1 of IRC:83 (Part III).
Structural Steel

All structural steel, castings and


forgings, fasteners (bolts, nuts, washers and
rivets), welding consumables and wire ropes
and cables shall conform to the provisions of
clause 505.1.2, 505.2, 505.3, 505.4 and 505.6
respectively of IRC:24.
Bitumen
Bitumen shall be paving bitumen of
viscosity grade complying with Indian Standard
Specifications for “Paving bitumen” IS:73:2006
of grade appropriate for the traffic and climatic
conditions of the Project Highway. The heavily
trafficked roads in hot areas may find harder
grade bitumen more appropriate while
pavements in mountainous regions subject to
sub-zero temperatures during winter months
carrying relatively lower traffic loads and subject
to the phenomenon of “Frost Heave” may find
less viscous bitumen resistant to fatigue and
cold cracking more appropriate.
Storage of Materials

All materials shall be stored at proper


places so as to prevent their deterioration or
intrusion of foreign matter and to ensure the
preservation of their quality and fitness for
the work. Any material, which has deteriorated
or has been damaged or is otherwise
considered defective after review by the
Independent Engineer shall not be used in the
works and shall be removed from site by the
Concessionaire at his cost. Such materials
shall not be made acceptable by any
modifications.