4 Laning As Per IRC SP 84 2009
4 Laning As Per IRC SP 84 2009
4 Laning As Per IRC SP 84 2009
,
C.E. AP R&B Retired
Consultant (Roads & Highways)
in
Plain and
Up to 25% 100 80
Rolling
Mountainous More than
60 40
and Steep 25%
75 - 100m 0.9m
Desirable Absolute
Nature of terrain
minimum minimum
Cement
Any type of cement specified in IRC:21 may be
used for the works subject to limitations, if any,
specified therein.
Coarse Aggregates