Logistics Project
Logistics Project
Logistics Project
PROJECT REPORT ON
AT
PGDMLM (2009-2010)
SUBMITTED BY:-
PUNE-411041
1
CERTIFICATE
Place: Pune.
Date:
2
ACKNOWLEDGEMENT
At this moment I also thank almighty, my Parents and God for the
blessings showed upon me and also my Friends for their valuable
suggestions.
4
DECLERATION
5
PREFACE
“To manage a business well is to manage its future & to manage the future is to manage
information” an aspect of management education is to undergo winter training in the
corporate world and then make a revolution of it. This training is offered at the completion of
first semester PGDM and prior to commencement of the second semester PGDM the
companies offer the winter trainee’s wide varieties of interesting and challenging project.
Winter training requires that the student attains practical experience in an industrial
organization for a period of four weeks. The winter project investigates some significant
aspect or problem of an organization. It gives students an opportunity to observe the business
organization in operation and sharpen their skills by putting then to use.
Winter training enables the students to undergo research work or an on the job training .This
training enables individuals to make a better informed carrier choice regarding both
functional specializations and type of organization.
Yet it is sufficient for the student to apply the management concept to the real life situations
and at the same time also be it their independent judgments and creativity.
6
CONTENTS
1. EXECUTIVE SUMMARY 7
2. INTRODUCTION 9
3. RESEARCH METHODOLOGY 12
4. OBJECTIVE OF STUDY 16
5. COMPANY PROFILE 18
8. CONCLUSION 53
9. BIBLIOGRAPHY 55
7
CHAPTER -1
EXECUTIVE SUMMARY
8
EXECUTIVE SUMMARY
The main problem regarding the matter of production is that, the raw material flow is slow, so
the company has to keep stock of raw material in good numbers. This is the ideal strategy
adopted by the manufacturing companies.
Now considering all these difficulties there was a need to develop a perfect inventory
management system.
The project also constitutes the study of documentation procedures that are followed in the
industry, like preparation of job order, generation of delivery challan cum invoice,
reconciliation of quantity, settlement of claims, etc.
The work that has been done in this project has given some important clues to the
management about the areas which thought were doing good and not only this it has also tried
to throw some light on the possible changes that can be made in order to achieve more and
more efficiency.
The main purpose of selecting this project is to study the aspects involved in purchase,
production & inventory management and the several documentation processes that are
involved in the working of the company.
9
[
CHAPTER -2
INTRODUCTION
10
Production can be defined as the manufacturing of goods and services, in production
management different things should be kept in mind which is determination of production
requirement, manufacturing process, order priority &right quality.
Inventories are the stock of raw materials of any kind that are stored for future use, mainly in
production process. Inventory management is the forecasting of analysis and modeling,
inventory stimulation. Inventories are materials or resources of any kind having some
economic value and management of these are called inventory management. There are
different types of inventories which are as follows:-
• In process inventory.
• M R O inventory.
• In transit inventories.
These are the types of inventories which are to be managed which are called Inventory
management.
11
Purchasing management done by different organizations through using different methods
which are as follows:-
•Schedule buying.
•Forward buying.
•Speculative buying.
•Contract buying.
•Blanket orders.
• Tender buying.
There is a vital need for integration so that customers can achieve their transportation
requirements while maximizing the value of money spent in getting their goods to market.
They require better use of existing assets and industry cooperation, and greater competition.
Companies aiming to be an integrated solutions provider have to tackle this by extending
their supply chain capabilities.
12
CHAPTER -3
RESEARCH METHODOLOGY
13
RESEARCH METHODOLOGY
understood as a science of studying how research is done scientifically. Why a research study
has been undertaken, how the research problem has been defined, in what way and why the
hypothesis has been formulated, and what data have been collected and what particular
method has been adopted, why particular technique of analyzing data has been used and a
host of similar other questions are usually answered when we talk of research methodology
Research design:-
A research design serves as a bridge between what has been established (the research
objectives ) and what is to be done , in the conduct of the study. In this project the research
done is of conclusive nature. Conclusive research provides information that helps in making a
rational decision.
Descriptive design was choose to measure the satisfaction level of production on the basis of
Intensive to workers etc. This design ensured complete clarity and accuracy it also insured
minimum bias in collection of data and reduced error in data interpretation. Statistical method
was followed in this research because the data was descriptive nature and is also enabled
accurate generalization.
14
SOURCES OF DATA
Primary Data
Prime data are those which are collected a fresh and for the first time, and thus happen to be
original in character it was collected through following ways
1) Interview
2) Observation.
Secondary Data
Secondary data are those which have already been collected by someone else and which have
already been passed through the statically process the data were collected in the form in
company profile and produce profile through following ways
1) Internet
2) Newspapers
3) Journals
15
RESEARCH INSTRUMENTS:
Industrial visit were used as it helped to prepare this project. Collecting data through
questionnaire was very time saving and personal observations was very time saving and cost
factor was also reduced. The respective departments and the net was also helpful in collecting
data.
SAMPLE DESCRIPTION:
SAMPLE DESIGN
The universe: - This consist the workers, employees and the production department.
SAMPLE METHOD
The sampling method used for the selection of the workers and employees is expert
judgmental sampling.
SAMPLE SIZE
METHOD OF COLLECTION:-
Data was collected through questionnaire, industrial visit and from departments. Questions
were of both types open ended and close ended. In these Questionnaire were not self
administered, I asked questions from various people in the logistic unit and then I noted all
the answers of questions.
16
CHAPTER-4
OBJECTIVE OF STUDY
17
OBJECTIVES OF THE STUDY
This being a part of the Electrical and Technology sector so the most important thing in this
sector is the quality product & prompt delivery of the materials. In this regard the production,
purchase & inventory department of any organization plays the most important role.
Therefore, the main objective of the study is to know how purchase, production &storage of
products and the information related to the product takes place in the company.
1. To study the existing production strategy, adopted by Victrans Engineers Pvt. Ltd.
2. To examine the strength and weakness of existing strategies.
3. To understand the effectiveness of logistics strategic in the market.
4. To suggest the measures to overcome the weakness from the existing strategies.
18
CHAPTER-5
COMPANY PROFILE
19
COMPANY PROFILE
Victrans Engineers Pvt. Ltd. was founded in1989 by Mr. S. K. Dutta in Nagpur with an
objective of making instrument transformers. Victrans Engineers Pvt. Ltd. produces current
transformers and potential transformers. It not only produces these products but also provides
services for these products. Victrans Engineers Pvt. Ltd. is located in an industrial area of
Nagpur called Hingna, MIDC, which is 14 kms from zero mile, Nagpur. The product ranges
of the company are as follows:
20
INTRODUCTION OF VICTRANS ENGINEERS PVT. LTD.
Victrans Engineers Pvt. Ltd. manufactures current and potential transformers and also
provides services for these products. It manufactures these products in the required
specifications and standards. VEPL produces transformers which are used in different public
and private sector organizations like Maharashtra State Electricity Transmission Co. Ltd.,
Delhi Transmission Co. Ltd., Kirloskar Brothers Ltd., Suzlon Infrastructure Services Ltd.,
Larson & Tourbo Ltd. (ECC division).
The transformers are of superior quality and extremely durable. VEPL pays revenues to the
government and also provides employment to a lot of people.
21
MISSION OF VEPL
• ENRICHES LIVES
We will do our best to provide quality products and services, which will improve the life
style of the users.
• QUALITY POLICY
Our dealers are our partners to practice this golden rule in our relations with others.
The conduct of our companies’ affairs must be pursued in a manner that command respect
for honesty and integrity.
22
AUTHORITY STRUCTURE
MANAGING PARTNER
PARTNER
TECHNICAL
MANAGER ADMINISTRATION
MARKETING
MANAGER PURCHASE
PRODUCTIO
N
I.S.O
FEBRICATION
23
CUSTOMERS OF VEPL
24
Shreem Capacitors Private Ltd.
Eri-Tech Ltd.
Ashtavinayaka Constructions.
AGM-Power
Emco Ltd.
25
Simms Engineering’s.
Technical Associates.
Traders Electricals.
Shalaka Infro-tech.
Continental Industries.
26
CHAPTER-6
27
PURCHASE PROCEDURE
vendor information format number QMSP-03-F-01 is sent to the vendor to get desired
executive, production & then put up to the director for approval on approval, the trial
order is placed. If in two consecutive trial orders, no rejection are found then the
3. Vendors rating for critical materials is carried out once in six months & based on the
rating, they are either included or deleted from the approved list.
28
VENDOR RATING PROCEDURE
Vendor supplies are evaluated for each lot supplied, as per vendor rating system & values are
entered in a format.
PARAMET RATIN
RES MARKS G
Full rejection-Nil
QUAN Up to (+ -)2%-Full marks
TITY(AGAINST 20
Up to 10%- 10 marks
PURCHASE ORDER)
29
If any marks on six months rating is found to be >85, the vendor Continues to be in
the approved list. If the rating is <70-85, vendor is informed about the deficiency by a
letter & if the rating is <50,or failing the quality any of the parameters order
placement is discontinued & vendor is informed to submit fresh samples for approval.
Purchase Orders are released by after reviewing the rating. The purchase orders
contain the purchase data such as clear product description, product specification,
acceptance criteria, delivery periods and inspection criteria along with commercial
data details as per the format records of such are maintained. In case of amendments,
purchase orders are reviewed for and approved by partners of the company. Purchase
orders are prepared for items having values above Rs. 10000/-
Purchased products inspection is carried out to ensure the specification given &
30
New Vendor Information Sheet
This information sheet is filled by new vendor so that the company can know about the
vendor.
VENDOR NAME:
PROPRIETORS NAME:
LEGAL STATUS:
CONTACT NO. :
FAX NO. :
EMAIL ADD:
Are you ISO 9000 certified? If yes please furnish Xerox copy of certificate.
Have you been approved to any customer? If yes, please furnish copy of certificate.
Any other product time approved obtained? if yes, furnish copy of certificate.
32
[
[ [
[ [
[ [[
33
[
34
[
[[
35
Inventory Control
Successful, well organized businesses rely heavily on inventory management system to make
certain that adequate inventory levels are on hand to satisfy their customers demand. The
inventory control module for the business accounting system provides this level of control by
offering high end features normally reserved for large companies including manufacturing
capabilities, serial number tracking and multi-ware house support. Inventory control even
features and image library that allows you to assign a picture to each part. Improved customer
service leads to increased profitability. And when integrated with the accounts receivables
and order entry modules, inventory control can significantly boost your service level while
complex project management, inventory control can be coupled with the job cost module to
help track all inventory related expenses for a project. Inventory tracking is enhanced even
more when integrated with the custom office module, which creates detailed spread sheet to
provide further analysis of inventory performance. The inventory control system offers
comprehensive reporting capabilities to top of inventory status. It can help to bring about the
creation of improved purchasing policies, pricing methods, even enhanced customer service.
36
STEP 1:
The process of issue begins with the issue sheet prepared and sent by the planning department
STEP 2:
The supervisor at the material control receive the receipts, check the requirement and they
look for the availability of raw materials. If the total requirement is already in the stock it is
separated and issued. In case of none availability either order is being placed for the material
for the planning is informed regarding the scene. Material control identifies the required
material from a huge stock of variety of the material by multipurpose tag attach to each lot of
raw material.
37
• Grade of the material.
STEP 3:
Raw material are issued basically to three division or units they are here indigenous material
STEP 4:
After issue of raw material the material control supervisor prepares a manual record of what
he issued using issue sheet. The basic content of the sheet are as follows: Department of issue
grade which is issued. Lot number issued Size of material issued Number of bush issued
Total number of quantity issued Signed by concerned issuing authority or supervisor.
STEP 5:
Through the requirement and issue are always in contrast with each other but sometimes
uncertainties occur and this result is the situation of left over which is rare in nature.The sheet
is divided into two parts that is excess supply and unusable material.
Quantity left
Decision on what to do of left over that is whether it is put to some other job or removed and
stocked.
38
STEP 6:
After the left over reaches the yard its specific features are compared with the one being sent
and then it is stocked at specific place until it comes to some use.
MIS SYSTEM
MIS stands for management information system and is a form of generating information
regarding the various ongoing process in the organization with the help of digital or electronic
media it is very much vital it is very much vital for the proper functioning and smooth
running of the each and every organization.
MODULE OF MIS:
FINANCE
QUALITY
&
ASSURANCE
ADMINISTRAT
DEPARTMENT
ION
MARKETING PURCHASE
ERP
SYSTEM
39
STORE ISSUE SLIP
40
ANALYSIS OF MONTHLY DISPATCH OF CT & PT
(2008-2009) (2007-2008)
41
Dispatch Figures
42
ROUTINE TEST
I R VALUE
HVPF TEST
P.D. TEST
OVER VOLTAGE
MEASUREMENT OF RESIS
TRE TEST
ACCURACY TEST
ISF TEST
43
STORAGE HANDLING
In times of severe competition, many retailers recognize the importance of controlling cost.
Cost knowledge is thus a foundation for improving supply chain relationship with known
supply chain relation costs, the information’s needed to most effectively structure the supply
chain can be provided. Moreover, different opportunities needed to most simultaneously
reduce cost and increase performance can be identified. The logistic cost made in the part of
the supply chain that include the warehouse and the store are presented. It can be seen that the
majority of operational costs are handling costs. In another empirical study by saghir and
jonson the same trend was observed : they found that 75% of the handling time in the retail
chain occur in the store. In their paper efficiency improvement through the integration and
development of new packing system are described. In this article, the potential to improve
handling efficiency is discussed by identifying the drivers for stores handling (i.e. given the
packages and the inventory replenishment rules). Handling costs in the stores in the two retail
chains investigated in this paper are equal to around 50 million euro per year, indicating that
efficiency gains lead to substantial euro saving as well.
44
ACTIVITY OF ORGANIZATION
SUPPLIERS
PRODUCT
STOCK PRODUCTION
PHYSICAL DISTRIBUTION
CUSTOMER
45
SWOT ANALYSIS
The overall evaluation of strength, weakness, opportunity and threat is called swot analysis.
STRENGTH
WEAKNESS
• Highly bureaucrat.
46
OPPORTUNITY
• Developing cities.
• Electrification in villages.
THREAT
47
QUESTIONNAIRE
Ans: Yes 15 No 5
Yes
No
Oracle
SAP
48
• For how many days you maintain the inventory of raw
materials?
30 Days
60 Days
Ans: Yes 7 No 13
Yes
No
49
• Do you prefer single or multiple vendor for purchasing raw
materials?
Single
Multiple
Ans: Yes 15 No 5
YES
NO
50
51
CHAPTER-7
52
FINDINGS:-
During the one month training in VICTRANS ENGINEERS PVT.LTD. we find number of
things and if the company pay attention in these findings it can become the top most company
in the sector here are some of the findings which we find during that one month duration of
training:-
• In the company, the Material Handling is done with the help of the Systematic
• The major portion of the company is operated through the Oracle Software
• Usually, multiple vendor system is preferred over the single vendor system.
• The testing of the raw material and the finished goods is carried out at both
53
SUGGESTIONS:-
As the production storage & purchase is very important in VEPL and it has prove it to their
best also but there are some drawbacks and if they fulfill it they might become the top
• Though the material handling techniques are used, there is a significant scope to
improve the handling process. The better material handling tools should be used to
• The regular maintenance of the material handling equipments should be carried out.
• The audit should be carried out in the intervals of 3 months so as to calculate the
• The working hours should be increased by 2 hours at the most so as to increase the
productivity.
• The single vendor system should be used on trail basis. This will help the company to
• In the company, they use both Oracle and SAP software for ERP. Instead of using two
different software, they should use only one software as main ERP System Tool.
54
CHAPTER – 8
CONCLUSION
55
CONCLUSION
How Inventory Increases?
Rejection:
Rejections due to poor quality of raw material or process rejections at every stage due
to quality checks.
Even implementation of Sample Inspection has resulted in faulty batches to pass by &
found as defective in the final stages of production, resulting in losses.
Cancellation of Orders:
Due to economic slowdown, many a times there is cancellation of huge orders which
leads to excessive inventory of finished goods.
Producing extra to tackle unidentified loss of files & to avoid shortage to complete
orders. This result in excess files produced in every batch of production for orders.
And these files keep on adding up to inventory until the next order for the same file
type is placed.
Scrap accounted at every stage of production which accumulates to almost more than
8%.
Obsolete Raw Material – outdated raw material kept in the warehouse. Not being rid
off as it will account for this year losses and it is carried forward, adding up to
unnecessary utilization of space.
Issues regarding Production & Inventory Control
Poor Maintenance: Machines not maintained properly so breakdown occurs & affects
output. But still machines are run as it is, which results in low quality of goods.
Break-down in Line Layout Undesirable, as it reduces the production capacity.
Weighing Machines need to be kept in every department to avoid unnecessary
material handling & thus save time and thus avoid workers from unnecessarily
wandering on pretext of work and wasting time.
Reduction in Manpower, so workers don’t work whole-heartedly.
Stagnant Inventory
Check on implementation & worker effectiveness
• Trained labor needed for doing a particular job – training required for Job Rotation.
56
BIBLIOGRAPHY
57