C 18 3 24 5 23 2
D 7 5 12 3 10 -2
E 10 5 15 9 15 0
F 5 12 17 10 15 -2
G 8 17 25 15 23 -2
H 2 25 27 23 25 -2
I 9 17 26 16 25 1
J 5 27 32 25 30 -2
Answer: B-D-F-G-H-J
2. Refer to the same network diagram that was used in the previous
question (Question 12 from page 187 of your textbook). Assume
that task A actually finished at 5 weeks and task B actually
finished at 5 weeks. Recalculate the expected project completion
time for the project. Which activities would you focus on in order
to get the project back on schedule?
Helpful Hint:Remember that actual finish times (AF) are based in reality
and cannot be created mathematically. You should only have AF values
for those activities that have already been completed.
C 18 5 23 5 23 0 -
D 7 5 12 3 10 -2 -
E 10 5 15 5 15 0 -
F 5 12 17 10 15 -2 -
G 8 17 25 15 23 -2 -
H 2 25 27 23 25 -2 -
I 9 17 26 16 25 -1 -
J 5 27 33 25 30 -3 -
Answer:
20 weeks - 16 weeks = 4 weeks that this activity’s duration can be
reduced by
Answer:
A CPI value of less than 1.0 means that for every dollar actually
expended, less than one dollar of earned value is received.
A CPI of greater than 1.0 means that for every dollar expended, your
earned value is equal to or greater than that original dollar spent.
Helpful Hint:Shaded areas represent cells that you need to fill in
values to complete the table.
Table 1: CBC
Week
T
B 1
C 1 2 3 4 5 6 7 8 9 0
$
3 1
Task 1 0 0 15 5
$
7 1 2 1 1
Task 2 0 10 10 0 0 0 0
$
4 2
Task 3 0 5 5 5 5
$ 2
3 0
Task 4 0 5 5
$
1 2
7 1 1 2 1 3 1 0
Total 0 0 25 15 0 5 5 5 0 5
1 1 1 1 1
1 3 5 6 8 0 3 4 5 7
Cumulative 0 5 0 0 5 0 5 5 0 0
Task 4
1 2 2 1
Total 0 6 18 12 9 7
Cumulative
Table 3: Percent
Complete
Week
1 2 3 4 5 6
3 8 10
0 0 0
Task 1 % % %
1 5 6
0 25 35 5 5
Task 2 % % % % %
1 2
0 0
Task 3 % %
Task 4
Answer:
Answer: $170
d)
e) What is the cumulative earned value (CEV) of the project at the
end of week 6? How does this compare with cumulative actual
costs (CAC)?
Answer:
g) What is the CV? To receive full credit, you must show your
formula and your calculations.
(formula) CV = Answer
(calculation) = Answer
(calculation) = Answer
(calculation) = Answer