RT Procedure
RT Procedure
Project: Gas Pipeline Abu Humos/ El Nobaria 42" Diameter & 65 Km Length
Location:
Purchase Order No. GASCO Project No.:
RT procedure
Page 1 of 9
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Date 24-May-2007
File Ref.
Revision history
0 21-Jul-2006 Approved
Summary
This construction method statement is intended to ensure the integrity of the activity for
Construction of abu humos el nobaria p/l 42" will done safely and matching with the company
spec. and requirement also consider the all parameter for work in agriculture field and the
common ability of the available equipment without any environmental impact . This method of
statement will apply along the project unless otherwise noted in the project quality manual or
procedures. This covers all activities related to the construction of front end activity.
Page 2 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
1- Scope
This procedure is applicable for Radiographic inspection method When it is
used for examination of welds to determine the compliance of a product with
specified Code
2- References
Applicable Codes Sections are ASME V, article2
ASME B31.3
3- Evaluation
Acceptance Criteria are as described herein under (subject tables are enclosed):
4- Personnel
4.1 Personnel shall be Knowledgeable, Trained and familiar with relevant
codes, Standards, Specification, equipment and Procedures.
4.2 Shall be qualified and certified according .to Petrojet Written Practice.
4.3 Examination shall be made by personnel certified as level I (under
supervision of level II or III) Or Level II. Results shall be interpreted by personnel
certified as level II or III.
5- Equipment
Gamma ray source IR 192 and X- ray 450 KV, 10 MA.
6- Manufacturing stage
As per applicable ITP.
7- Surface preparation
Test surface shall be free From weld ripples or irregularities.
8- Marking
The weld shall be marked by equally spaced reference markers (numerals)
Each reference marker shall be identified by progressive numbers.
see attached location marker sketches.
9- Film identification
Radiographs shall be identified by symbols consisting of lead letters or
numerals, that shall be positioned so that their image appear in the
radiograph, each section of weld radiograph shall be identified by the
information shown in fig I
Page 3 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Fig 1
Film Identification
PJ CWS
S.NO.
ASTM
0 10 20 30 40
WELD 50
NO. DATE
11-Scattered radiation
As a check on back – scattered radiation a lead letter (B) (13Mm height
1.5Mm thickness) Shall be attached to the back of each film holder if the
light image of the “B” appear on the dark background, the radiograph shall
considered unacceptable.
A dark image of B on a lighter background is not cause for Rejection.
12-Geometric unsharpness
Page 4 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Table “2”
12-3 Final acceptance of radiographs shall be based on the ability to see the
prescribed pentameters Image and the designated wire of a wire pentameter.
13-Penetrameters
Page 5 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
sufficient overlap area between the two films has been maintained to fulfill Ug .
Requirements.
Table “4”
IQI selection
Table “5”
IQI selection
Nominal Single-Wall Material Source Side Film Side
Thickness Range Mm Wire type Wire type
“essential wire” “essential wire”
Up to 6.4, incl. 5 4
Over 6.4 through 9.5 6 5
Page 6 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Page 7 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Notes:
1- t : thickness of weld excluding any allowable reinforcement .
1-1 In case of two different thickness as T is the thinner of these two thickness.
L: length of the longest indications in the group.
SUBJECT : Butt welds with thickness up to 90 mm for gamma ray and 120 for X-ray
MATERIAL : Carbon , low alloy and stainless steels
Reference code : ASME V Article 2
Page 8 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Film Source
Source
Source
Page 9 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
1-Scope
This procedure is used for the control and maintenance the quality image development
process of industrial radiographic film processing. This procedure is used for wet
chemical manual and automatic processes techniques.
2- References codes
ASME V , ASME SE 999.
3- Personnel
3-1 Personnel shall be knowledge, trained and familiar with developing process,
equipments and procedures.
3-2 Personnel shall have level I or II according to SNT-TC-1A.
4- Equipment
4-1 Automatic processing M/C.
4-2 Stainless steel hangers.
4-3 Stainless steel rod.
4-4 Calibrated thermometer.
4-5 Stainless steel heater.
4-6 Timer.
4-7 Automatic dryer.
4-8 Calibrated Densitometers.
5- storages
5-1 Storage of chemicals :follow the manufacturer s recommendations, storage
temperatures as per manufacturers recommendations or between ( 4-30 C º) ,
higher temperature will produce rapid oxidation that cause decrease in activity,
lower temperature can cause crystallization.
5-2 Film storage at temperature less than 24 C º ,air tight and light tight and humidity
less than 50 %
6- Procedure
6-1 Chemical mixing: before mixing solutions thoroughly clean all mixing
equipment, the chemical solution for manual and automatic processing shall be
mixed in poly-ethylene, pvc, stainless steel tanks.
6-2 Follow up the MSDS instructed by the manufacturers.
6-3 The manufacturers instructions shall be followed for mixing the chemicals
( correct volume of water, temperature specified and add chemicals in the order
listed.).
6-4 The water supply should be filtered water to insure that there no sedimentation.
6-5 Processing hangers and tanks should be free of corrosion and chemicals
deposits.
Page 10 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
6-6 In case of no processing is running the chemical solutions are protected in tanks
with dust cover (tight cover ) which also minimize evaporation and oxidation
Page 11 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
N.B: If Time Of Processing Solution Exceed One Month, A Test Strip Shall
Be Processed And Follow The Above Steps 6, 7.8, 7.9 .
Page 12 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
8- Records
8-1 Brand name and model of processor.
8-2 Brand names and batch number of chemicals used.
8-3 Time of development.
8-4 Temperature of chemicals.
8-5 Date new chemicals.
8-6 Replenishment rate .
Page 13 of 14
DOCUMENT TITLE: RT procedure DOCUMENT NO.: Abu Humos/El Nobaria PTJ-GASCO-42" P/L-001PL
Revision No.: A
Table “IX”
Notes:
1- t: Thickness of weld.
Page 14 of 14