A/C SYSTEM UNIT INSTALLATION CHECK SHEET

Contract Title: Customer: Job No.: Unit: Area / Unit Location / Zone: 1. Unit received in good condition - no damage 2. Unit, make, model & type 3. Transit bolts removed 4. Foundation for the unit as per approved drawing 5. Vibration isolator provided 6. Sufficient clearance available around the unit 7. Service and air flow space available 8. Unit installed as per approved drawing 9. Associated services such as field power isolator provided 10. Condensate drain availability 11. Unit alignment 12. Electrical termination 13. Unit is grounded for electrical leakage 14. Fuse rating 15. Required power availability 16. Piping connection 17. Access to the unit available Remarks Make: Serial No.: Model No.: Date: Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked Checked N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Accept Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject Reject

Sub Contractor Signature: Name / Designation: Date:

Main Contractor:

Client:

Venkat

You might also like