LARSEN & TOUBRO (OMAN) LLC

INSTALLATION CHECKLIST FOR CABLE TERMINATION

CONSTRUCTION OF 132/33 KV GRID STATION AND ASSOCIATED


PROJECT
TRANSMISSION SYSTEM AT MISFAH AREA (TENDER 175 /2009)
CLIENT Oman Electricity Transmission Company SAOC
CLIENT’S CONSULTANT Energoprojekt Entel LLC
CONTRACTOR Larsen & Toubro (Oman) LLC

RFI No DATE
CABLE JOINTER
LOCATION
CERTIFICATE No.
CABLE NO VALID UP TO
TERMINATION CABLE SCHEDULE
DRAWING NO NO
Inspection Details Results
1. Is material approval sheet available for termination kit

2. Type of Termination

3. Check System rated voltage (V)

4. Ensure termination tool-kit available at site

5. Weather conditions prevailing ( Temperature, humidity etc )

6. Check cable identification number is installed.

7. Check Gland Earthing is done.

8. Check the tightness of the Gland Check nut

9. Check the Cable Gland shroud.

REMARKS/OBSERVATIONS:

TITLE Larsen & Toubro (Oman) LLC Energoprojekt Entel LLC


NAME
DESIGNATION
SIGNATURE
DATE

MISFAH- SF – E 03