Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Inspection Checklist For: Ductwork: Inspection and Test Plans (ITP) - MUM-15 Duct Work Installation Checklist

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Inspection and Test Plans (ITP) – MUM-15

Duct Work Installation Checklist

Client: Project Name: Project No:

Area: Drawing No’s: Date: Sheet: 1 of 3

Check Conducted By: Signature: Check Approved By: Signature:

INSPECTION CHECKLIST FOR: DUCTWORK


The below checks are to be completed by the Mechanical Contractor prior to start-up of associated fan or FCU system

INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
Quality Control
1 Duct work material approved for use Yes No Yes No
2 Installation methods approved for installation Yes No Yes No
3 All duct work not being used is correctly stored Yes No Yes No
Installation
4 Drawings on site are the latest issue Yes No Yes No
5 Duct work is free of damage Yes No Yes No
6 Confirm correct spacing of supports as specified Yes No Yes No
Confirm duct work runs are correctly located and have
7 Yes No Yes No
adequate clearance from other services
Confirm duct work is installed with sufficient rigidity,
8 bends and offsets allowing for flexibility to absorb Yes No Yes No
movement and vibration from connected equipment
Confirm all sensing devices have been installed as per
9 Yes No Yes No
the approved drawings
All dampers, motors, sensors that are installed are at a
10 Yes No Yes No
reachable height from the floor or platform
Confirm duct work joints and seams are sealed with
11 Yes No Yes No
emmer seal or equal
Confirm duct work joints and seams are sealed with
12 Yes No Yes No
emmer seal or equal
Commissioning
13 All duct work have been pressurised to the normal Yes No Yes No
1
operating pressure to achieve minimum audible
leakage
Rust, grease and other dirt removed from internal
14 Yes No Yes No
surface of duct work prior to running the fan or FCU
Rust, grease and other dirt removed from external
15 surface of duct work prior to painting and/or Yes No Yes No
insulation installed
Mark alterations, sizes and location on As Built
16 Yes No Yes No
drawings for record purposes

ADDITIONAL COMMENTS:

You might also like