Project: Samsun CCPP: Title: ITP of Switchgears
Project: Samsun CCPP: Title: ITP of Switchgears
Project: Samsun CCPP: Title: ITP of Switchgears
SAMSUN CCPP
440-00-YG-QPH-KSR-002
Rev.:00
Purpose of issue:
Approval
Date:19/07/2011
Prepared:
KSR
Reviewed:
PPR
Approved:
OMV
Power Projects Ltd. reserve all rights on this document and on the information contained therein.
Reproduction, use or disclosure to third parties without Power Projects Ltd. written permission is strictly forbidden
KKS NO:
Rev:
0
Page No:
0
440-00-YG-QPH-KSR-002
LIST OF REVISIONS
Index
Date
19/07/2011
Pages
Raw Description
Previous Rev.
Current Rev.
00
Prepared
KSR
Checked
PPR
Approved
OMV
KKS/Record
No:
Revision:
440-00-YG-QPH-KSR-002
Date:
19.07.2011
Switchgear Erection
No
2
3
4
Description
BEFORE ERECTION
TRANSPORTATION
INSTALLATION
UNPACK
INSTALATION
MV SWTCHGEARS
ERECTION
FINAL
DOCUMENTATION
Activity
Relevant
Document
KESIR
ENGINEERING
PPR
OMV
SW
Calibration
Certificate
TRANSPORTATION INSTALLATION
Installation Instruction
SW
SW
UNPACK INSTALATION
Installation Instruction
SW
Installation Instruction
MV Switchgear Front
View
Installation Instruction
MV Switchgear Wiring
diagrams
SW
SW
Visual Inspection
Report
Installation Instruction
Visual Inspection
Report
SW
Installation Instruction
Check list
SW
Specifications
Installation Instruction
Installation Instruction
SW
Drawings
Handover
Package
NOTES:
Definitions
E: Works Execution
R: Records review
Notes
Revision
0
Modifications
Prepared by
KESIR
Check by
PPR
Approved by
OMV
Date
19.07.2011