Method Statement For Installation of VAV Box

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Method Statement For Installation of VAV Box

Method Statement for installation of VAV Box

Contents:

1. Introduction

2. Packing list

3. Tools

4. Procedures

1. Introduction

The following procedure has been prepared for the installation of the Variable Air Volume Boxes at
DIAL

2. Packing list

VAV Box shall includes

1. Factory mounted DDC Controller

2. Factory mounted damper actuator

3. Factory mounted velocity sensor

4. Factory mounted power supply

5. Loose thermostat

3. Tools.

General tightening or fastening tools (screw -drivers, drills, spanners etc.)

Calibrated multi-meters

Communication Accessories (Walkie-Talkie or Mobile Phone)

4. Installation Checklist.

4.1 Check the status of ducting work.

4.2 Required for work permission if required

4.3 Mark the location of junction box as per drawing

4.4 If ducting work is not completed notice to the ducting contractor


Method Statement for installation of VAV Box

4.5 Location – avoid areas with excessive vibration and electrical noise

4.6 To avoid damage disconnect power before installation

4.7 Check the provision of the DDC controller in each of the VAV boxes.

Procedures

5.1 Ensure sufficient space for access to the controller while installation

5.2 Ensure there is 4 Duct diameters straight inlet Duct, same size as inlet between the unit inlet and
transition take offs or fittings

5.3 The inlet of VAV Box is fixed with flexible or rigid circular duct of the same diameter of the VAV box and
is connected to the main supply duct

5.4 Circular Clip is used to fasten the flexible duct to the VAV box.

5.5 The outlet of the VAV box is rectangular in shape and is to be connected to the Duct by means of nut
bolt or slip joint to the distribution duct.

5.6 VAV Box has an arrow marking for direction of air flow as well as the vertical position, it is strictly
recommended that the direction of the arrow is followed for correct installation .

5.7 The thermostat is to be located in the zone served by the VAV box.

5.8 Cat-5/Cat-6 cable with RJ45 terminals at both ends is used to connect the thermostat to the box.

5.9 The temperature required is set on the thermostat. This temperature along with the sensed zone
temperature is send to the DDC controller of the VAV box, to regulate the desired amount of air to be
delivered into the room.

Storage and Handling of VAV Boxes.

6.1 The VAV boxes may be stored in a dry place away from direct sunlight.

6.2 Do not handle the VAV box by the cross flow velocity sensor.