Pojectcvil
Pojectcvil
Pojectcvil
Department of Education
Region IX, Zamboanga Peninsula
ZAMBOANGA DEL SUR SHOOL OF ARTS AND TRADES
Pagadian City
PROJECT PLAN
Name of Pupil: ________________________________ Year and Section: ________________
Area
: ________________________________ Name of Project : ________________
Purpose of Project : ____________________________________________________________
_____________________________________________________________
Plan/ Working Drawing : (Make your working drawing in separate sheet with the proper
measurement)
Bill of Materials:
QUANTITY
UNIT
UNIT
COST
TOTAL COST
USES OF TOOLS
6.
7.
8.
9.
10.
COSTING:
A. COST OF MATERIALS : P _________________
B. COST OF LABOR (35%) : P _________________
C. TOTAL COST
: P _________________