Budgetary Project Cost Section Wise Equipment & Boughtout Items Cost Civil & Structural Section Project Cost (Machinery + Construction)

Download as xls, pdf, or txt
Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1/ 6

BUDGETARY PROJECT COST Section wise equipment & Boughtout items cost Civil & structural section Project

cost (Machinery + Construction)

TARY PROJECT COST 100780000 70000000 170780000

COSTING OF REACTION SECTION Bought outs Calibration tank (2 nos) Agitator for Reactor (2 nos) Filter press charging pump (2 nos) Hot water dosing pump (2 nos) PLC & Scada & instrumentation Insulation & cladding Fabrication Reactor (2 nos) Hot water tank Total C COSTING OF FILTRATION SECTION Filter press( 3 nos) Belt conveyers ( 4 nos) Wash water pump ( 2nos) Recycle wash water pump ( 2nos) Flushing water pump Control pannel Total D COSTING OF SLURRY PREPERATION SECTION Cake hopper Intake screw feeder Liquification vessle Recirculation pump Feed storage tank (2 nos) Feed tank agitator (2 nos) Acid dosing tank Acid dosing pump Control pannel Total E COSTING OF CFHAG SECTION Bought out Fans with motors (5 nos) Feeder Furnace component Sonic soot blower MDC Bucket elevator with dedusting

Refractory Anchors Control panel Insulation & cladding Instrument Fabrication Furnace casing Module casing Ducting Bunker Hopper Tube bundle with transport structure & bending Royalty charges (PEI) Detailed Engg charges (PEI) Total F COSTING OF SPRAY DRYING + COMPACTION SECTION Spray dryer fabrication Feed pump Feed strainer (2 nos) Rotary Atomiser,Atomiser cone & Air distributor (PEI) Cooling blower Rotary valves ( 2 nos) (PEI) I.D. blower Bag filter fabrication Bag filter boughtouts Dilution air valve Expansion joints Screw feeder (2 nos) Vibro shifter (2 nos) Control pannel Insulation + cladding Design & consultancy (PEI) Compaction plant Total G

STING OF REACTION SECTION HDP MS/RL SS316/MS 120000 1680000 300000 100000 2000000 175000 2500000 450000 7325000 6000000 1800000 200000 140000 30000 400000 8570000 200000 450000 1200000 120000 1500000 900000 60000 40000 450000 4920000

MS/RL MS Total C

STING OF FILTRATION SECTION PP/MS Nylon/MS CS CS CS Total D OF SLURRY PREPERATION SECTION SS316/MS SS316/MS SS316/MS SS316/MS MS/RL MS/RL HDP Teflon/HDP Total E

OSTING OF CFHAG SECTION MS MS MS/SS MS/SS MS MS 1200000 200000 500000 1400000 250000 1250000

MS/SS

2300000 300000 600000 275000 500000

850000 1680000 600000 700000 200000 8500000 1200000 1800000 Total F 24305000 SPRAY DRYING + COMPACTION SECTION SS304/MS 4000000 SS316 250000 SS316 80000 SS316/MS 1150000 MS 60000 SS304/MS 280000 MS 300000 SS304/MS 1350000 STD 700000 STD 100000 STD 400000 SS304/MS 650000 SS304/MS 400000 550000 200000 1800000 SS304/MS 7500000 Total G 19770000

MS/SS MS MS/SS MS MS SS/MS