Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Procedural Guideline Do 13-Construction

Download as pdf or txt
Download as pdf or txt
You are on page 1of 41
At a glance
Powered by AI
The document outlines guidelines for occupational safety and health in the construction industry as per Department Order No. 13. It discusses the legal bases, agencies involved, requirements for a safety program, and operational safety procedures.

Several government agencies are involved in enforcing construction health and safety laws including the Department of Labor and Employment, Department of Trade and Industry, Department of Health, Department of Public Works and Highways, Department of Interior and Local Government, and Department of Environment and Natural Resources.

The requirements outlined in Department Order No. 13 for a construction safety and health program include developing a company safety policy, specific safety program, safety committee, appointing safety personnel, accident reporting procedures, public protections, general safety rules, personal protective equipment use, hazardous material handling, and material storage procedures.

PROCEDURAL GUIDELINES

Department Order No. 13, series of 1998, otherwise known as THE GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND HEALTH IN THE CONSTRUCTION INDUSTRY

Department of Labor and Employment Bureau of Working Conditions Intramuros, Manila

PROCEDURAL GUIDELINES Department Order No. 13, series of 1998, otherwise known as THE GUIDELINES GOVERNING OCCUPATIONAL SAFETY AND HEALTH IN THE CONSTRUCTION INDUSTRY TABLE OF CONTENTS A. OBJECTIVES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. B. LEGAL BASES: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C. AGENCIES INVOLVED IN CONSTRUCTION HEALTH AND SAFETY LAWS AND RELATED ISSUANCES : 1. Department of Labor and Employment . . . . . . . . . . . . . . . . . . . . . . . .. .
a. Bureau of Working Conditions (BWC)

PAGE NO.

1 1

b. c. d. e.

DOLE-Regional Offices Employees Compensation Commission (ECC) Occupational Safety and Health Center (OSHC) Technical Education Skills Development Authority (TESDA) 3

2. Department of Trade and Industry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . a. Construction Industry Authority of the Philippines (CIAP) b. Construction Manpower Development Foundation (CMDF) c. Philippine Contractors Accreditation Board (PCAB) 3. Department of Health (DOH) - The Non-Communicable Diseases Control Office . . . . . . . . . . . . . 4. Department of Public Works and Highways (DPWH) - . . . . . . . . . . . - Office of the Building Official . 5. Department of Interior and Local Government(DPWH) - Bureau of Fire Protection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6. Department of Environment and Natural Resources(DENR) . . . . . . . 7. Construction Industry Tripartite Council(CITC) . . . . . . . . . . . . . . . . D. DEFINITION OF TERMS: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E. COVERAGE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4 4

4 4 4 57 7

ii

TABLE OF CONTENTS F. DEPARTMENT ORDER NO. 13, REQUIREMENTS: 1. Construction Safety and Health Program pursuant to Section 5, D.O. 13, series of 1998. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.1 Company Safety and Health Policy. . . . . . . . . . . . . . . . . . . . . . . . . . .

PAGE NO.

8 8 9 9 9 9 9 10 10 11 11 11 11 11 12

1.2 Specific Construction Safety and Health Program . . . . . . . . . . . . . . . . 1.3 Composition of Construction Safety and Health Committee .. 1.4 1.5 1.6 1.7 1.8 1.9 Safety and Health Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Specific Duties and Responsibilities of the Safety Officer. . . . . . . . . Applicable In-plant Safety and Health Promotion and Continuing Information Dissemination. ............................... Accident and Incident Investigation, Recording and Reporting. . . . . . . . Provisions for the Protection of the General Public Within the Vicinity of the Company Premises During Construction and Demolition. . . . . . . General Safety Within Construction Premises. . . . . . . . . . . . . . . . . . . .

1.10 Environmental Control (Rule 1070 of the Standards). . . . . . . . . . . . 1.11 Guarding of Hazardous Machinery (Rule 1200 of the Standards) . . . . . 1.12. Provisions For and Use of Personal Protective Equipment (PPE) - (Rule 1080 of the Standards). . . . . . . . . . . . . . . . . . . . . . . 1.13 Handling of Hazardous Substances (Rule 1090 of the Standards). . . . 1.14 General Materials Handling and Storage Procedures. (Rule 1150 of the Standards). . ........................... .... 1.15 Installation, Use and Dismantling of Hoist and Elevators.-Rule 1415.10 Testing and Examination of Lifting Appliance, Rule 1220 Elevators and Related Equipment. . .....................

12

iii

TABLE OF CONTENT 1.16 Testing and Inspection of Electrical and Mechanical Facilities and Equipment. . ........................... ......... 1.17 Workers Skills and Certification. . .......................

PAGE NO. 12 12 12 13 13 13 13 13 13 13 14 15

1.18 Provisions for Emergency Transportation Facilities for Workers.. . . 1.19 Fire Protection Facilities and Equipment. . .................

1.20 First-Aid and Health Care Medicines, Equipment and Facilities. . . . 1.21 Workers Welfare Facilities. . ...........................

1.22 Proposed Hours of Work and Rest and Rest Breaks. . . . . . . . . . . . 1.23 Waste Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..

1.24 Disaster and Emergency Preparedness Contingency . . . . . . . . . . 1.25 Safety Program . ........................... ........

1.26 Company Penalties/Sanctions for Violation/s of the Provision/s of Safety and Health Program . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2. Personal Protective Equipment by Type of Project . . . . . . . . . . . . . . . . 2.1 General Building Construction Project (GBC). 2.2 General Engineering Construction Project. 2.3 Specialty Construction Project 3. Safety and Health Personnel and Skilled Worker . . . . . . . . . . . . . . . . . 3.1 Minimum Required Safety Personnel 3.2 Qualification and Training of Safety and Health Personnel and Skilled Workers. 4. Construction Heavy Equipment. . 5. Signages and Barricades. . 5.1 Signage Procedures: 5.2 Posting 5.3 Barricading Procedures: 5.4 Installing of barricades ........................... ...

15

16 17

...........................

iv

TABLE OF CONTENT

PAGE NO.

6. Construction Safety and Health Committee. . 6.1 Composition 6.2 Duties and responsibilities 7. Construction Safety and Health Reports. .

.................

19

....................

20 20 21 22

8. Cost of Construction Safety and Health Program. . . . . . . . . . . . . . . . 9. Safety and Health Information 10. Welfare Facilities. . . ...........................

........................... ..........

G. PROCEDURES IN THE FILING AND PROCESSING OF CONSTRUCTION SAFETY AND HEALTH PROGRAM (CSHP) 1. 2. Where to File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Evaluation of Construction Safety and Health Program . . . . . . . . . A. General Requirements 1. Requirements for Submission . . . . . . . . . . . . . . . . 2. Project Description . . . . . . . . . . . . . . . . . . . . . . . . . B. Procedures in Processing and Evaluation . . . . . . . . . . . . . . . 1. Evaluation 2. Results of Evaluation 3. H. Inspection and Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24 24 24 24 2526 26 27

VIOLATION AND PENALTIES

LIST OF ANNEXES Annex PPE1Classification of construction works/activities for purposes of . . determination of mandatory minimum Personal Protective Equipment(PPE) requirements 28-30

Annex CHE -1 - Crane Inspection Checklist . . . . . . . . . . . . . . . . . . . . . . . . . .

31-36

Pursuant to Department Order No. 13 series of 1998, otherwise known as the Guidelines Governing Occupational Safety and Health in the Construction Industry and other Related Laws and Issuances, this Procedural Guidelines shall apply in the filing, processing and evaluation of Construction and Health and Safety Program (CHSP) and other Related Activities and/or Operations in all construction worksites and workplaces and appropriate sanctions in cases of violations thereof. A. OBJECTIVES This Guidelines aims to: 1. Harmonize D.O. 13 with other existing standards and laws related to safety and health particularly in the construction activities and operations in all worksites and workplaces. 2. Provide stakeholders with clear and complete guide in order to comply with the requirements of D.O. No. 13 including the relevant rules of the Occupational Safety and Health Standards. 3. Standardize the procedures in the filing and processing of applications of Construction Safety and Health Program. 4. Strengthen linkages with other government and agencies and organizations involved in safety and health in the Construction Industry. 5. Enhance compliance with the requirements of D.O. 13 as well as the relevant provisions of Occupational Safety and Health Standards. B. LEGAL BASES: a. Article 165, Chapter 2, Title I of Book IV of PD 442 otherwise known as the Labor Code of the Philippines, as amended provides that The Department of Labor and Employment shall be solely responsible for the administration and enforcement of occupational safety and health laws, regulations and standards in all establishments and workplaces wherever they may be located. b. Article 162, Chapter 2, Title I of Book Four of the Labor Code of the Philippines, provides that The Secretary of Labor and Employment shall by appropriate orders set and enforce mandatory occupational safety and health standards to eliminate or reduce occupational safety and health hazards in all work places and institute new and update existing programs to ensure safe and healthful working conditions in all places of employment. c. Department Order No. 13, series of 1998, Guidelines Governing Occupational Safety and Health in the Construction Industry.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 1 of 36

d. Section 10, D.O. 13 Safety on Construction Heavy Equipment. e. Department Order No. 16, series of 2001 mandates that the Bureau of Working Conditions (BWC), either directly or through accredited training organizations shall conduct continuing programs to increase the supply and competence of personnel qualified to carry out the provisions of the Standards. f. Section 6.6.2, Department Order No. 19, series of 1993, mandates that the Department through the Regional Offices shall strictly enforce the Occupational Safety and Health Standards, as amended, particularly Rule 1005 on Duties of Employers, Workers and other persons and Rule 1410 on Construction Safety. Through the Bureau of Working Conditions (BWC), the Department may issue a code of practice on Occupational Safety and Health for the Construction Industry. g. Occupational Safety and Health Standards (OSHS), Otherwise known as the Implementing Guidelines of the Article 162 of the Labor Code of the Philippines. h. Article 128 and 129 of the Labor Code of the Philippines (LCP) on the visitorial and enforcement power of the Secretary of Labor and Employment or her duly authorized representatives, including the labor inspectors. i. D.O. 57-04 Guidelines on the implementation of Enforcement Framework series of 2004. the Labor Standards

C.

AGENCIES INVOLVED IN CONSTRUCTION HEALTH AND SAFETY LAWS AND REGULATIONS AND OTHER RELATED ISSUANCES :
1. Department of Labor and Employment a. Bureau of Working Conditions (BWC)

Performs primarily policy formulation and program development and advisory functions in the administration and enforcement of laws relating to working conditions. Exercises technical supervision in the administration and enforcement of all Labor Standard laws, including health and safety in all establishments, workplaces and worksites. b. DOLE-Regional Offices Enforce laws, policies, plans programs, projects, rules and regulations of the Department on labor standards and working conditions and exercise the visitorial power through Labor Standards Enforcement Divisions (LSEDs), pursuant to Article 128 of the Labor Code, as amended. .

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 2 of 36

c. Employees Compensation Commission Initiates, rationalizes, and coordinates policies on employees compensation programs as well as deciding appealed cases from the Government Service Insurance System and Social Securities Services, the agencies which initially administer the employees compensation program. d. Occupational Safety and Health Center (OSHC) Plans, develops and implement training programs. Undertakes continuing studies and researches on OSH. Undertakes practical testing for standard specification for Personal Protective Equipment. Conducts work environment measurement and medical examination for the ready detection of occupational diseases. e. Technical Education Skills Development Authority (TESDA) Supervision in the development and implementation of the Skills and Equipment Standards Certification System. Issues the skills certification for critical construction occupation, pursuant to appropriate laws and issuances. 2. Department of Trade and Industry a. Construction Industry Authority of the Philippines (CIAP) Mandates to promote, accelerate and regulate the growth of the construction industry. Implements blacklisting proceedings pursuant to Section 5.2b.3 of the Revised Uniform Guidelines for Blacklisting Constructors Involved in Public Construction (Approved under CIAP Board Resolution No. 5, series of 2000) in cases of the failure of all the constructors to comply with D.O. 13, Labor standard laws including the Occupational Safety and Health Standards (OSHS). . b. Construction Manpower Development Foundation (CMDF) Serves as the manpower development board for Philippine construction and its allied industries. Undertakes training for skills development, safety awareness and other supervisory/managerial courses. Participates in the development of skills standards for the construction industry. c. Philippine Contractors Accreditation Board (PCAB)

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 3 of 36

The Board is vested with authority to issue, suspend and revoke licenses of contractors, investigate such violation of this act and the regulations there under as may come to each knowledge and, for this purpose, issue subpoena and subpoena duces tecum to secure appearance of witnesses in connection with the charges presented to the Board, and to discharge such other powers and duties affecting the Construction Industry in the Philippines. 3. Department of Health (DOH) - The Non-Communicable Diseases Control Office Responsible in the formulation and implementation of Chapter VII of The Code on Sanitation of the Philippines (P.D. No. 856), among others, which provides rules, and regulations on industrial hygiene and other sanitary requirements. 4. Department of Public Works and Highways (DPWH) - Office of the Building Official Responsible in the administration and enforcement of P.D. 1096 (National Building Code and Its Implementing Rules and Regulation) including the imposition of penalties for administrative violations. 5. Department of Interior and Local Government (DILG) - Bureau of Fire Protection Responsible for the implementation of the provisions of Presidential Decree 1185 otherwise known as the Fire Code of the Philippines which provide standards, rules and regulations on fire safety, prevention, protection and control/suppression. 6. Department of Environment and Natural Resources(DENR) - Environmental Management Bureau (EMB) Responsible in the issuance of Environmental Compliance Certificate (ECC) prior to construction activities. 7. Construction Industry Tripartite Council(CITC) Advisory and oversight functions in the formulation and implementation of laws, policies and issuances pertaining to working conditions, health and safety in the construction industry.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 4 of 36

D.

DEFINITION OF TERMS: As used herein, the terms below shall be defined as follows : 1. Accredited organization refers to any organization duly accredited by the Department of Labor and Employment (DOLE) which is pursuant to Rule 1030, delegated or authorized to perform functions related to the improvement of occupational safety and health such as training, testing, certification, safety and health audit or any other similar activity. Certified First-Aider refers to any person as defined in Rule 1960 of the Occupational Safety and Health Standards, trained and duly certified or qualified to administer first-aid by the Philippine National Red Cross or by any organization accredited by the same. Construction project manager/consultant refers to any person or entity who is hired by the project owner, to act in the owners behalf concerning the supervision and monitoring of all matters related to the overall execution of a construction project. The construction project manager shall be a separate entity from the general constructor or any subcontractor of the construction project. Construction safety and health committee refers to the general safety and health committee for a construction project site that shall be the overall coordinator in implementing OSH programs. Construction safety and health officer refers to safety personnel or any employee/worker trained and, in addition to their regular duties and responsibilities, tasked by his employer to implement occupational safety and health programs in accordance with the provisions of the Occupational Safety and Heath Standards (OSHS). Constructor deemed synonymous with the term builder and refers to any person or organization who undertakes or offers to undertake or purports to have the capacity to undertake or submits a bid to, or does himself or through others, construct, alter, repair, add to, subtract from, improve, move, wreck or demolish any building, highway, road, railroad, excavation or other structure, project, development or improvement, or to do any part thereof, including the erection of scaffolding or other structures or works in connection therewith. The term constructor includes subcontractor and specialty contractor. Emergency health provider refers to any person or organization who is certified or recognized by the Department of Health and who can provide the same or equivalent emergency health services as an emergency hospital, including emergency treatment of workers on site, emergency transport and care during
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 5 of 36

2.

3.

4.

5.

6.

7.

transport of injured workers to the nearest hospital, with adequate personnel, supplies and facilities for the complete immediate treatment of injuries or illnesses. 8. General constructor refers to a constructor who has general supervision over the constructors in the execution of the project and who directly receives instructions from the owner or construction project manager if one is appointed by the owner. Occupational health personnel refers to a qualified first-aider, nurse, dentist, or physician, engaged by the employer to provide occupational health services in the establishment/undertaking. Private Safety Organization deemed synonymous with the term consulting organization accredited pursuant to Rule 1030 of the Occupational Safety and health Standards. Project manager refers to the overall technical personnel of the general contractor and/or the subcontractor in charge of the actual execution of a construction project. Resident engineer refers a duly licensed engineer who shall be tasked to be present at the construction site at all times, whenever work is being undertaken, and shall have the responsibility of assuring the technical conformance of all designs, materials, processes, work procedures rendered for the execution of the construction project, including safety and health of all persons within the construction site. Safety personnel refers to any person engaged by any constructor, trained, accredited by DOLE and tasked to provide occupational safety and health services for the workers/employees in any construction project.

9.

10.

11.

12.

13.

14. Safety and Health Committee refers to a group tasked with the responsibility to monitor, inspect, and investigate all aspects of the construction project pertaining to health and safety of construction workers. 15. Safety organization refers to any organization recognized and accredited by the DOLE to conduct occupational safety and health training and/or safety and health audit. 16. Construction safety and health program refers to a set of detailed rule that shall cover the processes and practices utilized in a specific construction project site in conformity with the OSHS including the personnel responsible and the penalties for violations thereof.

17. General Labor Standards inspection including general occupational health and safety refers to inspection by authorized person/s of the work environment, including the location and operation of machinery other than those covered by
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 6 of 36

technical safety inspections, adequacy of work space, ventilation, lighting, conditions of work environment, handling, storage or work procedures, protection facilities. 18. Safety and health audit refers to a regular and critical examination of OSH management system in project sites, OSH programs and records conducted by authorized person in pursuance of Rule 1040, D.O. 13, s 1998 and D.O. 16, s 2001. 19. Skills standards refers to the written specification of the minimum stock knowledge and skills a worker should possess to perform the functions identified in the job description of his occupation.

20. Technical safety inspection- refers to inspection for the purpose of safety determination of boilers, pressure vessels, internal combustion engine, electrical installation, elevators, hoisting equipment and other mechanical equipment. 21. Trade test refers to an instrument used to measure workers skills and knowledge based on the requirements of the skills as prepared and determined by TESDA in coordination with its accredited organization/s. 22. Tool box meeting or gang meeting refers to daily meeting among workers and their respective supervisors for the purpose of instructions, discussion and proper briefing on the planned work, the assessment of past work, the possibility or actual occurrence of accidents at the site, tips and suggestions on how to prevent possible accidents and other related matters. Construction safety signage refers to any, but not limited to, emergency or danger sign, warning sign or safety instruction, of standard colors and sizes in accordance with the specifications for standard colors of signs for safety instructions.

23.

24. Heavy equipment refers to any machine with engine or electric motor as prime mover used either for lifting, excavating, leveling drilling, compacting, transporting and breaking works in the construction site, such as but not limited to crane, bulldozer, backhoe, grader, road compactor, prime mover and trailer, with minimum operating weight and horsepower rating of 1,000 KG and 10 HP, respectively, that are subject to test based on the requirements of D.O. No. 13. 25. Imminent danger refers to a condition or practice that could reasonably be expected to cause death or serious physical harm before abatement under the normal enforcement procedures can be accomplished. 26. Treatment Room refers to any enclosed area or room equipped with the necessary medical facilities and supplies, and located within the premises of the

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 7 of 36

establishment where workers maybe brought for examination and treatment of their injuries or illnesses in cases emergency. 27. Unguarded surface refers to any working surface above water or ground, temporary or permanent floor platform, scaffold construction or wherever workers are exposed to the possibility of falls hazardous to life or limb. E. COVERAGE This Procedural Guideline shall apply to: a. All public and private operation and undertakings in the construction industry and its subdivision, namely general building construction, general engineering construction and specialty trade construction, based on the classification code of the Philippine Construction Accreditation Board of the Construction Industry Authority of the Philippines (CIAP); b. Companies and entities involved in demolition works; and c. Those falling within the construction industry as may be determined by the Secretary of Labor and Employment and as provided for under D.O. 13 and the Occupational Safety and Health Standards. F. DEPARTMENT ORDER NO. 13, REQUIREMENTS, The following shall be the minimum requirements for the approval of a Construction Safety and Health Program (CSHP). 1. Construction Safety and Health Program pursuant to Section 5, D.O. 13, series of 1998. 1.1 Company Safety and Health Policy. The following shall apply: A Company Safety Policy which shall serve as the general guiding principles in the implementation of safety and health on site duly signed by the highest company official or his duly authorized representative who has the over-all control of project execution and should include the contractors general policy towards occupational safety, workers welfare and health, and environment. A Safety policy, which shall include the commitment that the contractor shall comply with DOLE minimum safety requirements, including reporting requirements of the Occupational Health and Safety Standards (OSHS), and other relevant DOLE issuances. These may include, but are not limited to the following:

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 8 of 36

a. b. c. d. e.

Registration (Rule 1020 and DO 18-02) Report of Safety Committee Organization (Rule 1040) Notification of Accidents and Occupational Illnesses (Rule 1050) Annual Work Accident/Illness Exposure Data Report (Rule 1050) Application for installation of mechanical/electrical equipment for construction of structure for industrial use (Rule 1070 and 1160) f. Annual Medical Report (Rule 1960) 1.2 Specific Construction Safety and Health Program shall contain the tendering agencys requirements in addition to the minimum requirements under the appropriate sections of D.O. No. 13 whenever deemed as applicable. 1.3 Composition of Construction Safety and Health Committee. A structure and membership of the construction safety and health committee which shall be consistent with the minimum requirements of Section 11 of D.O. 13, series of 1998.
1.4 Safety and Health Personnel. The following shall apply:

a. All appointed first-aiders shall be duly trained and certified by the Philippine National Red Cross and shall possess a Certificate of Basic First Aid Training Course (Standard) with a valid PNRC ID Card. b. All appointed Safety Officers shall have completed the 40-hour BWC prescribed safety and health course as required by Rule 1030 of the OSHS, as amended by D.O. 16. All full-time safety personnel shall be accredited by the BWC pursuant to D.O. 16. c. All physicians and nurses assigned at the project site shall have completed the Bureau prescribed course on occupational safety and health course, pursuant to Rule 1960 of the OSHS. 1.5 Specific duties and responsibilities of the Safety Officer. The following shall apply: a. Specific duties and responsibilities shall comply with the outlined duties and responsibilities in Rule 1047 of the OSHS; and b. Procedure on the required performance of the assigned duties and responsibilities of safety officers in the construction site. 1.6 Applicable In-plant Safety and Health Promotion and Continuing Information Dissemination. The following shall apply: a. Detailed information dissemination or advisories to the new employees prior to on-site assignment. e.g. conduct of safety orientation, companys health and safety policies, hazards related to the job safety measures, safe work procedures.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 9 of 36

b.

c.

Detailed programs on continuing education such as trainings and seminars, if any, that shall be given to employees e.g. BOSH, refresher course, first aid training, refresher course toolbox meeting, construction safety training for site safety officers, 80-hour advance safety course prescribe. Arrangements for conveying information on safety and health IEC materials e.g. Posters/komics/flyers, safety signages, handbooks/manuals, bulletin boards Arrangements for setting up sub-committees on safety and health, where necessary. Schedule of safety related activities e.g. toolbox meeting, health and safety committee meeting

d. e.

1.7 Accident and incident investigation, recording, and reporting. The following shall apply: a. All accidents or incidences shall be investigated and recorded. b. All work related accidents resulting to disabling injuries and dangerous occurrences as defined in OSH Standards (Rule 1050) shall be reported. c. Responsible or duly authorized officer for accident or incident investigation recording and reporting who are either the employer/owner/project manager/safety officer d. Accident Report shall contain the minimum information as required in DOLE/BWC/OHSD/IP-6. e. Shall notify the appropriate DOLE Regional within 24 hours in case of fatal accidents. An accident investigation shall be conducted by the Regional Office within forty eight (48) hours after receipt of initial report of the employer. 1.8 Provisions for the protection of the general public within the vicinity of the company premises during construction and demolition. The following shall apply: a. Measures in order to ensure the safety of the general public shall be pursuant to Rule 11 of the National Building Code-Implementing Rules and Regulations: Protection of Pedestrians During Construction or Demolition b. Appropriate provisions and rules of OSHS Rule 1412.09: Protection of the Public Rule 1412.12: Protection against collapse of Structure Rule 1412.16: Traffic Control Rule 1413: Excavation Rule 1417: Demolition --------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 10 of 36

Rule 1060: Premises of Establishments D.O. 13, Section 9: Construction Safety Signs Other relevant provisions of OSHS.

1.9 General safety within construction premises. The following shall apply: The provisions for danger signs, barricades, and safety instructions for workers, employees, public, and visitors such as, housekeeping; walkway surfaces; means of access i.e. stairs, ramps, floor openings, elevated walkways, runways and platforms; and, light. 1.10 Environmental Control (Rule 1070 of the Standards). The following shall apply: a. Monitoring and control of hazardous noise, vibration and air-borne contaminants such as gases, fumes, mists and vapors. b. Provisions to comply with minimum requirements for lighting, ventilation and air movement. 1.11 Guarding of hazardous machinery (Rule 1200 of the Standards). The following shall apply: a. Provisions for installation/design of built-in machine guards. b. Provisions for built-in safety in case of machine failure. c. Provisions for guarding of exposed walkways, access-ways, working platforms. 1.12 Provisions for and use of Personal Protective Equipment (PPE) - (Rule 1080 of the Standards). The following shall apply: a. Appropriate types and duly tested PPEs to be issued to workers after the required training on their use. b. Provisions for maintenance, inspection and replacement of PPEs. c. In all cases the basic PPE commonly required for all types of construction projects are hard hats, safety shoes and working gloves. Other PPEs shall be required depending on the type of work and hazards. 1.13 Handling of Hazardous Substances (Rule 1090 of the Standards). The following shall apply: Provision for identification, safe handling, storage, transport and disposal of hazardous substances and emergency procedure in accordance with Material Safety Data Sheet (MSDS) in cases of accidents.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 11 of 36

1.14 General materials handling and storage procedures. (Rule 1150 of the Standards). The following shall apply: - Safe use of mechanical materials handling equipment - Secured and safe storage facilities - Regular housekeeping as necessary so as not to constitute and/or present hazards - Clearly marked clearance limits - Proper area guarding of storage facilities 1.15 Installation, use and dismantling of hoist and elevators.-Rule 1415.10 Testing and Examination of Lifting Appliance, Rule 1220 Elevators and Related Equipment. The following shall apply: a. Provisions to ensure safe installation, use and dismantling of hoist and elevator; b. Periodic inspection of hoists and elevators. 1.16 Testing and inspection of electrical and mechanical facilities and equipment. The following Rules of the Occupational Safety and Health Standards shall apply: Rule a. b. c. d. e. f. Coverage

Rule 1160 - Boiler Rule 1170 - Unfired Pressure Vessels Rule 1210 - Electrical Safety Rule 1220 - Elevators and Related Equipment Rule 1410 - Construction Safety Rule 1415.10 Training and Examination of Lifting Appliance

1.17 Workers skills and certification. The following shall apply: a. Provisions to ensure that workers are qualified to perform the work safely. b. Provisions to ensure that only qualified operators are authorized to use and operate electrical and mechanical equipment. 1.18 Provisions for emergency transportation facilities for workers. The following shall apply: Rule 1963.02 of the Occupational Safety and Health Standards - Emergency Medical and Dental Services

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 12 of 36

1.19 Fire Protection Facilities and Equipment. The following rule shall apply: a. Fire protection facilities and equipment as required under Rule 1940 of the OSHS b. Proposed structure and membership of fire brigade c. Provision for training on emergency preparedness 1.20 First aid and health care medicines, equipment and facilities. a. Identification of the proposed first aid and health care facilities that the employer shall provide satisfying the minimum requirements of OSHS. b. Identification of the medical and health supplies, such as medicines and equipment to be provided. c. In all cases, the provision of first aid medicines and emergency treatment shall be mandatory. d. In the absence of the required on site health care facilities, the employer shall attach a copy of a written contract with a recognized emergency health provider as required under the OSHS. 1.21 Workers Welfare Facilities. The following shall apply: Provisions for toilet and sanitary facilities Proposed bathing, washing, facilities Proposed facilities for supplying food and eating meals Proposed facilities for supplying potable water for drinking and for washing e. Proposed facilities for locker rooms, storing and changing of clothes for workers. 1.22 Proposed Hours of Work and Rest and Rest Breaks. The following shall apply: a Work schedules, working hours, shifting schedules b. Frequency and length of meals and breaks c. Schedule of rest periods 1.23 Waste Disposal. The following shall apply: a. Proposed method of clearing and disposal of waste. b. Provisions for permits and clearance where require in disposal of hazardous wastes. 1.24 Disaster and Emergency Preparedness Contingency 1.25 Safety Program . The Safety Programs shall contain the following: a. Standard work procedures.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 13 of 36

a. b. c. d.

b. Job hazard analysis for the following activities as applicable to the project. c. Other hazardous work, not outline herein but will be performed during project execution must also be included. The activities may consist of any number of the following, depending on the nature of the project, vis--vis exposure to hazards: a. Site Clearing b. Excavations c. Erection and dismantling of scaffolds and other temporary working platforms d. Temporary electrical connections/installations e. Use of scaffolds and other temporary working platforms f. Working at unprotected elevated working platforms or surfaces g. Work over water h. Use of power tools and equipment i. Gas and electric welding and cutting operations j. Working in confined spaces k. Use of internal combustion engines l. Handling hazardous and/or toxic chemical substances m. Use of hand tools n. Working with pressurized equipment o. Working in hot or cold environments p. Handling, storage, usage and disposal of explosives q. Use of mechanized lifting appliances for movement of materials r. Use of construction heavy equipment s. Demolition The hazard analysis shall contain the following: a. Identification of possible hazards for a particular activity. b. Identification of any company permits or clearances needed prior to the performance of the activity together with the name of person/s who is authorized to issue such permit or clearance. c. Identification of the proposed improvement in work standard procedures that shall be followed during implementation of a particular activity. d. Company inspection procedures to ensure safety during the execution of a particular activity. e. Identification of emergency procedures in case of accidents or any untoward incident while performing a particular activity. 1.26 Company Penalties/Sanctions for Violation/s of the Provision/s of Safety and Health Program The appropriate penalties or sanctions for violation of company rules and regulations or those stipulated in the CHSP and the observance of due process.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 14 of 36

2. Personal Protective Equipment by Type of Project 2.1 General Building Construction Project (GBC). The following classifications shall apply: Classification: Air Navigation Facilities, Power Transmission & Distribution, Building and Housing, Communication facilities, Sewerage, water treatment plants and Site/Land development. (For the required PPE see Annex PPE-I) 2.2 General Engineering Construction Project. The following classifications shall apply: Classifications: Roads and airports(Horizontal structure), bridges, irrigation system, flood control and drainages, dams, tunneling, ports and harbor, water supply (For the required PPE see Annex PPE-I) 2.3 Specialty Construction Project. The following classifications shall apply: Classifications: Electrical work, mechanical work, plumbing and sanitary work, air conditioning or refrigeration, water proofing work, painting work, communication facilities, foundation or piling work, structural steel work, concrete pre-cast, elevator or escalator, well drilling work, navigational equipment and instrument installation, electromechanical work, metal roofing and siding installation, structural demolition and landscaping. (For the required PPE see Annex PPE-I) 3. Safety Personnel and Skilled Worker . The following shall apply: 3.1 Minimum Required Safety Personnel. The following shall apply: a. The General Constructor shall provide for a full time officer, who shall be assigned as the general construction safety and health officer to oversee full time the overall management of the Construction Safety and Health Program. b. The General Constructor shall provide for additional Construction Safety and Health Officer/s in accordance with the requirements for Safety Officer of

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 15 of 36

D.O. 16, s. 2001, depending of the total number of personnel assigned to the construction project site. c. The General Constructor shall provide for one (1) Construction Safety and Health Officer for every ten (10) units of heavy equipment assigned to the project site. d. Each construction contractors/subcontractors shall provide for the required number of safety officers in accordance with the requirements of D.O. 16 series 2001. 3.2 Qualification and Training of Safety and Health Personnel and Skilled Workers. The following shall apply: a. Training of OSH Personnel shall be pursuant to D.O. 16 series of 2001 and its Procedural Guidelines. b. Worker Skills Certification for the critical operations/occupations shall be pursuant to D.O. 13 and D.O. 19 as well as the TESDA requirements on worker competency. 4. Construction Heavy Equipment. The following shall apply: 4.1 Accreditation of Organization for Testing of Construction Heavy Equipment shall be pursuant to D.O. No. 16 and its Implementing Guidelines and Procedural Guidelines on Accreditation and Performance Audit of Testing Organization for Construction Heavy Equipment. (Please see Annex B Checklist of Requirements for Accreditation of Testing Organization) 4.2 Conduct of Inspection and Test of Construction Heavy Equipment shall be pursuant to Sec. 10 of D.O. No. 13 and its Procedural Guidelines. The following shall apply: a. Procedural Guidelines on Accreditation and Performance Audit of Testing Organization for Construction Heavy Equipment b. Standard Checklist for Testing and Inspection of Construction Heavy Equipment. (See Annex CHE-I) c. Inspection Procedures for DOLE Inspectors 4.3 TESDA Certification Requirements for Operators. Certification for Operators shall be in accordance with the requirements of TESDA on worker competency.. 4.4 Monitoring and Evaluation of CHE Test/Inspection conducted shall be pursuant to the Procedural Guidelines on Accreditation and Performance Audit of Testing Organization for Construction Heavy Equipment.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 16 of 36

5. Signages and Barricades. The following shall apply: Construction Safety Signages shall be provided as a precaution and to advise the workers and the general public of the hazards existing in the worksite. 5.1 Signage Procedures: The signages shall be: a. Posted in prominent positions and at strategic locations. b. As far as practicable, be in the language understandable to most of the workers employed in the site. c. For non-raised floor areas, the attached yellow CAUTION sign shall be used when using yellow CAUTION tape. (See Table II of the OSHS) d. For non-raised floor areas , the attached red DANGER sign shall be used when using the red DANGER tape. (See Table II of the OSHS) e. Placed in designated areas at four (4) feet from ground level, if there are no other more practicable height placement. f. Regularly inspected and maintained in good condition to achieve its purpose. Signages that are damaged; illegible or that no longer apply as to purpose, site or language, shall be removed or be replaced by the safety officer when needed. g. Removed after the hazard is completely eliminated. If upon work completion the hazard is still present, the signage shall remain in place. h. Designed and constructed following the Overall Dimensions of Safety Signs Formula as required by the OSHS (see Table II, B page 178, OSHS) i. Specific with the type of hazard and should indicate the name of the contaminant/ substance involved (for chemical hazards), and the type of PPE or respiratory equipment to be worn. 5.2 Posting of Signages shall include, but not limited to the following places: a. Areas where there are risks of falling objects. b. Areas where there are risks of falling, slipping, tripping among workers and the public c. Prior to entry in project sites, locations and its perimeter. d. Where there is mandatory requirement on the usage of PPEs. e. Areas where explosives and flammable substances are used or stored f. Approaches to working areas where danger from toxic or irritant airborne contaminants/ substances may exist, g. All places where contact with or proximity to electrical facility/equipment can cause danger h. All places where workers may come in contact with dangerous moving
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 17 of 36

parts of machinery or equipment i. Locations of fire alarms and fire-fighting equipment j. Locations for instructions on the proper usage of specific construction equipment, tools. 5.3 Barricading Procedures: The following shall apply: a. The contractor shall provide all necessary barricades, safety tapes, safety cones or safety lines as required in isolating or protecting an unsafe work area from other workers, pedestrians or vehicular traffic. b. Barricades shall completely enclose the hazardous area and effectively limit unintentional or casual entry. c. Barricades shall be three (3) feet vertical height from the ground, when no other more practical height specification is available. d. Barricades shall be maintained in good condition to achieve its purpose. e. Barricades that are damaged; faded or that no longer apply as to purpose, site or meaning, shall be removed or shall be replaced by the safety officer. f. Barricade tape shall not be used on the floor as this presents a slipping hazard of its own. g. In addition to using the proper warning tape, the contractor shall use the appropriate safety signage when barricading an area. h. All barricades shall be removed after the hazard is completely eliminated. I. Upon work completion, if the hazard is still present, the barricade shall remain in place. 5.4 Installation of barricades shall include, but not limited to the following worksites conditions: a. b. c. d. e. f. g. h. i. j. k. l. hazardous areas trip hazard robotic movement energized electrical works overhead suspended load test critical high pressure test chemical introduction fall exposure Emergency Response Zone Unsafe condition zone Danger zone Confined and enclosed space

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 18 of 36

6. Construction Safety and Health Committee. The following shall apply: 6.1 Composition a. Project Manger or his representative as chairperson ex-officio b. General Construction Safety and Health Officer c. Construction Safety and Health Officers d. Safety representatives (SAFETY OFFICER) from each subcontractor. If DOLEs minimum requirements based on the number of workers of the contractor/sub-contractor requires only a part time safety officer, the safety officer need not be an accredited safety practitioner or consultant. e. Doctors, nurses and other health personnel pursuant to the requirements stated in Rule 1042 of the OSHS f. Workers representatives If there are no contractors/sub-contractors or the constructor is a subcontractor, the safety and health committee shall be in accordance with the requirements of Rule 1040 of the Occupational Safety and Health Standards. 6.2 Duties and responsibilities a. The Project Manager or his representative shall act as the Chairperson of the committee. b. The committee shall conduct safety meetings at least once a month. c. The persons constituting the Safety and Health Committee shall, as far as practicable, be at the construction site whenever construction work is being undertaken. d. The committee shall continually plan and develop accident prevention programs. e. The committee shall review reports of inspection, accident investigation and monitor implementation of the safety program. f. The committee shall provide necessary assistance to government authorities authorized to conduct inspection in the proper conduct of their activities g. The committee shall initiate and supervise safety trainings for its employees h. The committee shall conduct safety inspection at least once a month, and shall conduct investigation of work accidents and shall submit a regular report to DOLE. i. The committee shall initiate and supervise the conduct of daily brief safety meetings or toolbox meetings.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 19 of 36

j. The committee shall prepare and submit to DOLE, reports on said committee meetings. k. The committee shall develop a disaster contingency plan and organize such emergency service units as may be necessary to handle disaster situations.

7. Construction Safety and Health Reports. The following shall apply: 7. 1 The Construction Safety and Health Report shall include: a. b. c. d. Monthly summary of all safety and health committee meetings Summary of all accident investigations /reports Corrective/Preventive measures/action for each hazard Periodic hazards assessment with corresponding remedial measures for new hazards e. Safety promotions and trainings conducted/attended 7.2 Submission of Reports. The following shall apply: a. All general constructors shall be required to submit a monthly construction safety and health report to the BWC copy furnished the DOLE Regional Office concerned. b. In case of any dangerous occurrence or major accident resulting in death or permanent total disability, the concerned employer shall notify the appropriate DOLE Regional Office within twenty-four (24) hours from occurrence. c. After the conduct of investigation by the concerned construction safety and health officer, the employer shall report all disabling injuries to the DOLE Regional Office on or before the 20th of the month following the date of occurrence of accident using the DOLE/BWC/HSD-IP-6 form. 8. Cost of Construction Safety and Health Program. The following shall apply: 8.1 The total cost of implementing a Construction Safety and Health Program shall be mandatory and shall be made an integral part of the projects construction cost as a separate pay item, duly quantified and reflected in the Projects Tender Documents and likewise reflected in the Projects Construction Contract Documents. 8.2 The cost of the following PPEs: helmet, eye goggles, safety shoes, working gloves, rain coats, dust mask, ear muffs, rubber boots, and other similar PPEs shall be indicated/enumerated per cost, per worker, foreman, leadman, jackhammer operator, carpenter, electrician, mason, steelman, painter, mechanic,

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 20 of 36

welder, plumber, heavy equipment operator, physician/inspector, and other such personnel. 8.3 The PPEs shall be sufficient in number for all workers particularly where simultaneous construction activities/operations in different areas are being undertaken. 8.4 The cost of the minimum required inventory of medicines, supplies and equipment as indicated in Table 47 of the OHS Standards shall be included. 8.5 The safety personnel manpower cost salaries/wages, benefits shall be included. 8.6 Cost of safety promotions/activities, training conducted and salaries of safety and health personnel, medical personnel employed or engaged by constructor. 9. Safety and Health Information. The following shall apply: 9.1 Workers shall be adequately and suitably: a. Informed of potential safety and health hazards to which they may be exposed at their workplace. b. Instructed and trained on the measures available for the prevention, control and protection against those hazards. 9.2 Every worker shall receive instruction and training regarding general safety and health common to construction sites which shall include, but not limited to the following: a. b. c. d. e. f. g. h. I. The basic rights and duties of the workers at the construction site. The means of access and egress, both during normal work and in emergency situations. The measures for good housekeeping. The location and proper use of welfare and first-aid facilities. The proper care and use of the items or personal protective equipments and protective clothing provided the workers. The general measures for personal hygiene and health protection. The fire precautions to be taken. The action to be taken in case of any emergency. The requirements of relevant health and safety rules and regulations.

9.3 The instruction, training and information materials provided shall be given in a language or dialect understood by the worker. Written, oral, visual and participative approaches shall be used to ensure that the worker has understood and assimilated the information.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 21 of 36

9.4

Each supervisor or any person e.g. foreman, lead man, gangboss, and other similar personnel shall conduct daily tool box or similar meetings prior to the start of the operations for the day to discuss with the workers and to anticipate safety and health problems related. No person shall be deployed in a construction site unless he has undergone a safety and health awareness seminar conducted by safety professionals or accredited organizations or other institutions recognized by DOLE.

9.5

9.6 Specialized instruction and training shall be provided to the following: a. Drivers and operators of lifting appliances, transport, earth-moving and materials-handling equipment and machinery; or any equipment of specialized or dangerous nature. b. Workers engaged in the erection or dismantling of scaffolds. c. Workers engaged in excavations at least one (1) meter deep or deep enough to cause danger, shafts, earthworks, underground works or tunnels. d. Workers handling explosives or engaged in blasting operations. e. Workers engaged in pile-driving. f. Workers in compressed air cofferdams and caissons. g. Workers engaged in the erection of prefabricated parts of steel structural frames and tall chimneys, and in concrete work, form work and other such type of work. h. Workers handling hazardous substances and materials. i. Workers as signalers and riggers. j. Other types of workers as may be categorized by TESDA 10. Welfare Facilities. The following shall apply: The employer shall provide the following welfare facilities in order to ensure humane working conditions: 10.1 Adequate supply of safe drinking water: a. If the water is used in common drinking areas, it shall be stored in closed containers from which the water is dispensed through taps or cocks. Such containers shall be cleaned and disinfected at regular intervals but not exceeding fifteen (15) days. b. Notices shall be posted conspicuously in locations where there is water supply that is not for drinking purposes

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 22 of 36

10.2

Adequate sanitary and washing facilities: a. Adequate facilities for changing and for the storage and drying of work clothes. b. Adequate accommodation facilities for taking meals and for shelter. c. Adequate washing facilities regardless of sex for every 25 employees up to the first 100 and an additional of one (1) facility for every 40 additional workers. d. Suitable living accommodation for workers and as may be applicable for their families, such as separate sanitary, washing and sleeping facilities for men and women workers.

10.3 Adequate and suitable toilet and bath facilities for both male and female workers at the following ratio: a. b. c. d. e. f. g. Where the number of female workers exceeds 100, one (1) and bath facilities for every 20 female workers up to the first 100 and one (1) toilet and bath facilities for every 30 additional female workers. Where the number of male workers exceeds 100 and sufficient urinals have been provided, one (1) toilet and bath facilities for every 25 sales up to the first 100 and one (1) more for every 40 additional male workers. Every toilet shall be provided with enclosure, partitioned off so as to provide/ensure privacy. If feasible, shall have a proper door and fastenings, so doors shall be tight fitting and self-closing. Urinals shall be placed or screened so as not to be visible from other parts of the site, or other workers. Rest rooms shall be so arranged so as to be conveniently accessible to the workers and shall be kept clean and orderly at all times. Adequate hand-washing facilities shall be so provided within or adjacent to the toilet facilities In cases where persons of both sexes are employed, toilet and bath facilities for each sex shall be situated or partitioned so that the interior will not be visible even when the door of any facility is opened from any place where persons of the other sex have to work or pass. If toilet and bath facilities for one sex adjoin those for the other sex, the approaches shall be separate, and toilet and bath facilities for each sex shall be properly indicated.

h.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 23 of 36

G. PROCEDURES IN THE FILING AND PROCESSING/EVALUATION CONSTRUCTION SAFETY AND HEALTH PROGRAM (CSHP).

OF

1. Where to file application for processing/evaluation of CSHP shall be filed with the Bureau or through the DOLE Regional Office. A. Application received by the Region the Regional Office shall officially endorse the CSHP to the Bureau within 7 working days from receipt thereof. B. Application received by the Bureau - application received by the Bureau shall be reviewed and evaluated by its appropriate technical staff 2. Evaluation of Construction Safety and Health Programs A. General Requirements. The following shall apply: 1. Requirements for submission: a. The contractor-applicant shall submit at least two (2) copies of the Construction Health and Safety Program is being submitted for evaluation and approval of DOLE. The letter of intent shall be in the official company letterhead, signed by an authorized company official/employee. It shall also contain the complete company address, telephone number/s and name/s of persons authorized to transact business with the DOLE on matters pertaining to the application. The Program must contain provisions that comply with the minimum requirements of DOLE D.O. 13, s. 1998, and applicable requirements as indicated in Section F of this procedural guidelines. b. The required supporting documents as determined by DOLE such as, but not limited to the following: certificates of trainings or the required accreditation for safety and health personnel; Skills Certificates for heavy equipment operators and workers performing critical occupations; certificates of inspection and testing of construction heavy equipment; permits for electrical and/or mechanical installations; DOLE Registration; Constructors Accreditation. 2. Project Description-The following shall be indicated: a. Specific name of project as it may/will appear on project bid documents or as advertised by the project tender or as specified by the project owner.
--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 24 of 36

b. Specific location of the project, preferably the exact address of the project. c. Project classification as classified by the project tender d. Photocopy of the following: 1. Where applicable, Invitation to Apply For Eligibility and to Bid from DPWH, NHA and/or other government/nongovernment bid tendering agencies and/or from a newspaper of general circulation (name of newspaper and page number where such advertisement/s appeared) stating project name and location, contract duration, expected start/execution, date of bidding and/or Project Proposal submitted to the tender bidding agency stating the project name and location, duration of project/s expected start/execution. The Project Proposal, if prepared by the constructor-applicant, must be stamped received by the bid tendering agency or entity. This may also apply to private bid tenders if they so require. 2. Any other document/s issued by the project owner or project tender where the details as enumerated in no. 1 of this section may be identified in the absence any of the documents as mentioned therein. e. Project owner f. Name of main contractor if contractor is applying for approval of Safety and Health Program as a sub-contractor. g. Estimated start of execution of project and the estimated project duration h. Estimated number of workers to be deployed, consisting of the total number of workers to be directly employed by the contractorapplicant and the estimated number of workers who may not be under the direct supervision of the contractor applicant (ex. workers from subcontractors and other contractors who may simultaneously undertake the project) B. Procedures in Processing and Evaluation. The following shall apply: 1. Evaluation - The authorized evaluator shall within five (5) working days upon receipt of the program evaluate the documents for completeness, veracity and sufficiency. The evaluator shall prepare a summary of evaluation indicating findings and recommendations for review/ by the immediate supervisors/Division Chief. A final summary of the findings and recommendation shall be submitted to the BWC Director for approval or disapproval of the program.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 25 of 36

2.
a. b.

Results of evaluation
The results of the written evaluation shall be shall be submitted by the evaluator to the Director for final review and appropriate action. Based on the decision of the Director, the evaluator shall prepare the appropriate communication to inform the applicant of the results of the evaluation. In case of deficiencies, the communication shall contain all the noted deficiencies and the period to correct the same. If the applicant does not correct the deficiencies within the fifteen-day (15) prescriptive period or the applicant does not have any valid reason as determined by the Director, the Director may resolve to disapprove or discontinue processing the application. All documents pertaining to applications with a resolution to discontinue the processing of the application shall be placed in an inactive file. Should the applicant desire to revive the application for approval, the same shall satisfy the General Requirements for submission and evaluation of applications for approval of construction safety and health programs, as required in this guidelines. If the applicant has complied with the prescribed minimum requirements, the Director shall issue a Certificate of Approval for the CSHP covered by the specific project/s applied for. If the applicant does not comply with the requirements as determined by the Director, the Director shall issue a resolution for the disapproval of the construction safety and health program for the particular project/s named in the application, stating the reason for the disapproval. The Director may furnish/forward a copy of the resolution to any agency for their appropriate action as the Director may deem necessary for the coordinated enforcement of national laws and standards and to the CIAP as the case maybe.

c. d.

e.

f.

3. Inspection and Monitoring - The following shall apply: A. No construction project shall be undertaken without a DOLE Approved Construction Safety and Health Program and the required minimum personnel complement to implement the same. The DOLE Regional Office concerned through the labor inspectors shall inspect and monitor the implementation of Department Order No. 13, s 1998, Department Order No. 57-04 and their corresponding implementing procedures, guidelines and manuals for all construction sites within their respective jurisdiction. In case of an approved CSHP by the Bureau, in all cases shall provide a copy of the same for inspection and monitoring of the Regional Office. The Bureau shall refer to the concerned Regional Director for investigation, non-compliance applicant with respect to pending CSHP coming from applicant constructors/contractors within their jurisdiction.

B.

C. D.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 26 of 36

E.

The Regional Director shall submit to the Bureau his/her findings and/or recommendations within five (5) working days from the termination of his/her investigation.

H.

Violations and Penalties. The following shall apply: a. Pursuant to the provisions of D.O. 13 and as circumstances may warrant, the DOLE shall refer to the Philippine Contractors Accreditation Board (PCAB) its findings, after due process, on any act or omission committed by construction contractors in violation of this rule, labor standards, safety rules and regulations and other pertinent policies. Any such violation committed by construction contractors, whether general constructors or sub-contractors, shall constitute as prima facie case of a construction malperformance of grave consequence due to negligence, incompetence or malpractice contemplated under RA 4566 (Constructors Licensing Law), as amended, and its Implementing Rules and Regulations b. In cases of imminent danger situations, the DOLE Regional Director shall issue a stoppage order pursuant to the provisions of Rule 1012.02 of the OSHS and other pertinent issuances for stoppage of operation or for other appropriate action to abate danger. c. Pending the issuance of the order, the employer shall take appropriate measures to protect his workers. d. The stoppage order shall remain in effect until the danger is removed or corrected permanently. e. Non-compliance with the order shall be penalized under existing provisions of labor laws. f. All processes and/or procedures in the conduct of General Labor Standards inspection including General Occupational Safety and Health/Technical Safety Inspection shall be governed by the provisions of Department Order No. 57-04 and its corresponding Manuals of Instructions.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 27 of 36

PPE-I BUREAU OF WORKING CONDITIONS Department of Labor and Employment Classification of construction works/activities for purposes of determination of mandatory minimum Personal Protective Equipment(PPE) requirements: General Construction Work Basic PPE for all construction workers 1. Safety Helmet 2. Safety Gloves 3. Safety Shoes Specialty PPE shall be provided to workers in addition to or lieu of the corresponding basic PPE as the work or activity requires as follows: Construction Work/Activity 1. Work near unprotected areas such as but not limited to the following a. Working on scaffolds b. Working on roofs 2. Work involving pouring of concrete Such as but not limited to the following a. Laying concrete slab b. pouring of concrete for beams and/or columns 3. Work involving laying of asphalt 4. Working with derricks and cranes Specialized PPE 1. Safety belt Remarks Where there is a possibility of fall that will normally cause disabling injury If workers feet may have contact with fresh concrete If workers hands may have contact with fresh concrete

1. Safety chemical resistant boots 2. Chemical resistant gloves

1. Heat resistant gloves 2. Heat resistant safety footwear 1. Color-coded vest with reflectorized markings 2. Heavy leather gloves 3. high visibility gloves 1. Heavy duty safety footwear 2. Ear muff or ear plugs

If worker needs to work on or near hot asphalt Proper visibility and identification of critical persons such as operators, riggers, signal men For riggers For signal men Safety shoes for relatively dry or sheltered work Water and mud resistant boots for wet outdoor works When working near or on noisy equipment

5.

Working with earth moving equipment

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 28 of 36

6. 7. 8.

Manual excavation or digging Work on top of or near bodies of water Work where hot cutting and welding of metals are involved

3. high visibility gloves 4. High visibility vest 1. padded vest

For spotters For all workers within immediate vicinity of equipment When work may involve being hit by falling materials When there is danger of fall into deep water For welders and gas cutters

1. Life vest 2. Safety belt 1. heat resistant light filtering face shield 2. heat resistant and heat insulating gloves 3. metal fume filtering respirators 4. heat resistant protective clothing 5. light filtering and For gas cutting in lieu of face heat resistant face shield goggles 1. heat resistant and heat insulating gloves 2. heat insulating protective clothing 3. heat resistant face shield 1. electrically insulated gloves 2. Electrically insulated safety shoes 3. Electrically insulated gloves 1. Vibration insulating gloves

9.

Work involving exposure to or handling of hot materials or work near open flame

For handling of hot substances and materials For working in hot working environment For working near open flame Electrical resistance must be suitable for the maximum electrical voltage of energized parts that may be handled by worker

10. When working with live electricity above 50 volts AC or DC

11. Work involving handling of noisy and/or vibrating power tools/equipment

2. Ear protection

Recommended total cumulative actual usage of tool shall be a maximum of 2 hours per day( for 8-hour work, duty cycle should be 1:4) When power tool generates noise of more than 85 dB.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 29 of 36

13. Work involving exposure to harmful dust 14. Work that may involve shortage of oxygen 15. Working with organic solvent or toxic and/or corrosive chemicals

1. dust filtering respirators 1. 1. 2. 3. 4. 5.

16

Working with atmospheres containing contaminants above recommended threshold limit values for airborne contaminants

1. 2. 3. 4.

If dust concentration is above recommended Threshold Limit Value(TLV) for the contaminant Self contained or Work in confined spaces or supplied air work involving depletion of respirator oxygen supply Chemical resistant If work involves handling of gloves chemicals Chemical filtering If chemical emits vapors above respirator recommended TLV for the contaminant chemical/s Chemical resistant If work may involve chemical face shield splashes to the face Chemical goggles If chemical vapors may irritate eyes Chemical resistant If work will involve chemical protective clothing splashes to the body of worker Appropriate For atmospheres containing not contaminant more than ten times the filtering respirator recommended TLV Contaminant If contaminant may irritate eyes protection for eyes Self-contained or For environment containing supplied air more than ten time the respirator recommended TLV Chemical suits If contaminant may enter through skin

17. Working under high pressure 18. Working near vehicular traffic

Work involves working underwater

Working at night under low lighting conditions

1. PPEs with Reflectorized or luminous markings for high visibility 2. Heavy duty safety shoes 1. Self-contained or supplied air underwater breathing apparatus 2. Thermal insulating wet suit and accessories 1. High visibility vest

If work involves long exposure to cold water

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 30 of 36

ANNEX CHE-I
Bureau of Working Condition Department of Labor and Employment

Crane Inspection Checklist


Table A Inspection Items and Description Check applicable column ITEM (1) Manufacturer's operating and Maintenance Manuals Y e s No Deficient N/A DESCRIPTION / PURPOSE Manufacturer's operating and maintenance manuals shall accompany all mobile hoisting equipment. These manuals stet forth specific inspection, operation and maintenance criteria for each mobile crane and lifting capacity.

(2 ) Equipment Logbook 2.1 Has an updated equipment logbook 2.2 All repairs/ modifications are properly recorded 2.3 Logbook inspected and reviewed regularly by a competent person (3) Guarding 3.1 Exposed moving parts guarded 3.2 Guards of adequate strength 3.3 Guards are of proper construction and installation (4) Swing Clearance Protection (5) High-Voltage Warning Sign (6) Boom Stops (7) Jib Boom Stops (8) Boom Angle Indicator (9) Boom Hoist Disconnect, Automatic Boom Hoist Shutoff (10) Two-Blocking Device

Equipment logbook should reflect daily activities which may affect its safe operation, such as inspections, repairs, maintenance, tests, among others

All exposed moving parts such as gears, chains, reciprocating or rotating parts are guarded or isolated.

Materials for guarding rear swing area. High-voltage warning signs displaying restrictions and requirements should be installed at the operator's station and at strategic locations on the crane. Shock absorbing or hydraulic type boom stops are installed in a manner to resist boom overturning. Jib stops are restraints to resist overturning. A boom angle indicator readable for the operator station is installed accurately to indicate boom angle. A boom hoist disconnect safety shutoff or hydraulic relief to automatically stops the boom hoist when the boom reaches a predetermined high angle. Cranes with telescoping booms should be equipped with a two-blocking damage prevention feature that has been tested on-site in accordance with manufacturers requirements. All cranes hydraulic and fixed boom used to hoist personnel must be equipped with two-blocking devices on all hoistlines intended to be used in the operation. The anti-two blocking device has automatic capabilities for controlling functions that may cause a two-blocking condition. Cranes for use to hoist personnel must be equipped for power controlled lowering operation on all hoistlines. Check clutch, chains, and sprockets for wear.

(11) Power Controlled Lowering

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 1 of 36

(12) Lattice Boom 12.1 Based section properly attached 12.2 Proper pin clearance 12.3 No boom lacing/ cord damage 12.4 Proper boom stops 12.5 12.6 12.7 12.8 Proper gantry system A-frame Proper boom section connection pins/ keys Proper boom gantry support Proper jib attachment/ backstops/ belly slings

All structural joints and connections, structural members should be inspected visually and if damage or unsafe condition is suspected, additional non-destructive testing as appropriate should be performed by an authorized person

(13) Leveling Indicating Device (14) Sheaves 14.1 Hoist line and sheave size match 14.2 Sheaves are not worn 14.3 Adequate lubrication and moves freely

A device or procedure for leveling the crane must be provided. Sheave grooves shall be smooth and free from surface defects, cracks, or worn places that could cause rope damage. Flanges must not be broken, cracked, or chipped. The bottom of the sheave groove must form a close fitting saddle for the rope being used. Lower load blocks must be equipped with close fitting guards. Almost every wire rope installation has one or more sheaves ranging from traveling blocks with complicated reeving patterns to equalizing sheaves where only minimum rope movement is noticed. Drum crushing is a rope condition sometimes observed which indicates deterioration of the rope. Spooling is that characteristic of a rope which affects how it wraps onto and off a drum. Spoiling is affected by the care and skill with which the first larger of wraps is applied on the drum. Manufacturer's criteria during inspection usually specify:

(15) Main Hoist and Auxiliary Drums System 15.1 Proper size and spooling of hoistlines 15.2 Drum side/ shields for cracks 15.3 Dogs/ pawls/ locking devices 15.4 Drum rotation vs. control motion

Minimum number of wraps to remain on the drum. Condition of drum grooves Condition of flanges at the end of drum. Rope end attachment. Spooling characteristics of rope. Rope condition.

(16) Main Boom, Jib Boom, Boom Extension

Boom jibs, or extensions, must not be cracked or corroded. Bolts and rivets must be tight. Certification that repaired boom members meet manufacturers original design standard shall be documented. Non-certified repaired members shall not be used until recertified. Hooks and blocks must be permanently labeled with rated capacity. Hooks and blocks are counterweighted to the weight of the overhaul line from highest hook position. Hooks must not have cracks or throat openings more than 15% of normal or twisted off center more than 10o from the longitudinal axis. All hooks used to hoist personnel must be equipped with effective positive safety catches especially on hydraulic cranes.

(17) Load Hooks and Hook Blocks 17.1 Sheaves function smoothly 17.2 Hook rotates freely/ lubricated 17.3 Proper Becket 17.4 Properly reeved

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 2 of 36

(18) Hydraulic Hoses Fittings and Tubing 18.1 No signs of leak 18.2 No blistering or abnormal deformation 18.3 No evidence of excessive abrasion or scrubbing

Flexible hoses must be sound and show no signs of leaking at the surface or its junction with the metal and couplings. Hoses must not show blistering or abnormal deformation to the outer covering and no leaks at threaded or clamped joints that cannot be eliminated by normal tightening or recommended procedures. There should be no evidence of excessive abrasion or scrubbing on the outer surfaces of hoses, rigid tubing, or hydraulic fittings.

(19) Outriggers 19.1 Lubrication 19.2 Structural condition 19.3 Pressure hoses/ connections

Outrigger number, locations, types and type of control are in accordance with manufacturer's specifications. Outriggers are designed and operated to relieve all weight from wheels or tracks within the boundaries of the outriggers. If not, the manufacturer's specifications and operating procedures must be clearly defined. Outriggers must be visible to the operator or a signal person during extension or setting.

(20) Load Rating Chart 20.1 Load radius 20.2 20.3 20.4 20.5 20.6 20.7 Boom length Parts of line Quadrant of operation Boom angle Weight of attachments Weight of handling devices

A durable rating chart(s) with legible letters and figures must be attached to the crane in a location accessible to the operator while at the controls. The rating charts shall contain the following:

A full and complete range of manufacturer's crane loading ratings at all stated operating radii. Optional equipment on the crane such as outriggers and extra counterweight which effect ratings. A work area chart for which capacities are listed in the load rating chart, i.e. over side, over rear, over front. Weights of auxiliary equipment, i.e. load block, jibs, boom extensions. A clearly distinguishable list of ratings based on structural, hydraulic or other factors rather than stability. A list of no-load work areas. A description of hoistline reeving requirements on the chart or in operator's manual.

(21) Wire Rope 21.1 Good overall condition 21.2 Proper end connections 21.3 Proper lubrication 21.4 Proper clips

Main hoist and auxiliary wire rope inspection should include examining for

Broken wires. Excess wear. External damage from crushing, kinking, cutting or corrosion.

(22) Drum 22.1 Proper size and spooling of hoistlines 22.2 Drum side/ shields for cracks 22.3 Dogs/ pawls/ locking devices 22.4 Drum rotation vs. control motion

Drum diameter should be suitable for the size and length of cable used.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 3 of 36

(23) Cab 23.1 Good glass and visibility 23.2 Functioning Instruments and controls 23.3 Fire extinguisher available 23.4 Appropriate load charts and warning signs 23.5 Proper and adequate access

Contains all crane function controls in additional to mechanical boom angle indicators, electric wipers, dash lights, warning lights and buzzers, fire extinguishers, seat belts, horn, and clear unbroken glass.

(24) Braking Systems 24.1 Parking brake or locking devices while stationary 24.2 Brake capable of stopping crane at maximum grade recommended for travel 24.3 Brakes remain engaged during loss of pressure or power

Truck cranes and self-propelled cranes mounted on rubbertired chassis or frames must be equipped with a service brake system, secondary stopping emergency brake system and a parking brake system. Unless the owner/operator can show written evidence that such systems were not required by the standards or regulations in force at the date of manufacture and are not available from the manufacturer. The braking systems must have been inspected and tested and found to be in conformance with applicable requirements. Crawler cranes are provided with brakes or other locking devices that effectively hold the machine stationary on level grade during the working cycle. The braking system must be capable of stopping and holding the machine on the maximum grade recommended for travel. The brakes or locks are arranged to engage or remain engaged in the event of loss of operating pressure or power.

(25) Turntable/ Crane Body 25.1 Level/ stable 25.2 25.3 25.4 Normal wear of gears, teeth, rollers No cracks Bolts secure

Make sure that the rotation point of a crane gears and rollers are free of damage, wear and properly adjusted and the components are securely locked and free of cracks or damage. The swing locking mechanism must be functional (pawl, pin) and operated in the cab.

(26) Counterweight 26.1 Proper size 26.2 Proper attachment

The counterweight must be approved and installed according to manufacturer's specifications with attachment points secured.

(27) Engine Housing 27.1 Clean housing 27.2 27.3 27.4 27.5 27.6 Machinery guards provided Clear access Good brake/ clutch adjustment Hand signal Illustration provided Swing break provided No unusual signs of oil of fuel leaks within the vicinity of the engine housing

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 4 of 36

(28) Track Crawler System 28.1 Adequate Lubrication 28.2 Complete and secure connection bolts 28.3 Normal slack and wear of drive chain

No missing track pads, locks, pins, bolts

APPENDIX - GENERAL LOAD CHARTS AND OPERATIONAL CONSIDERATIONS General Load Chart and Operational Consideration General Load Chart: Manufacturer's operating notes supplied with the machine contain important information concerning proper setup, operation and additional points that need to be considered when calculating load handling capacities of cranes. Mistakes in calculating capacity can cause accidents. Several factors to be considered when calculating a cranes load capacity, including the following: A. B. C. D. E. F. G. Load Radius: the horizontal distance between the center of the crane rotation to center of the load. Boom length: including the jib, swing away extension or any other attachments that may increase length of the boom. Parts of line: Quadrant of operation: the area of operation that the lift is being made in; note different quadrants usually have lower lifting capacities. Boom angle: the angle formed between the horizontal plane of rotation and center line of the boom. Weight of any attachments: jib, lattice extension or auxiliary boom point. Weight of handling devices: ball, block, and/or any necessary rigging.

Operational Considerations: A. B. C. D. E. F. G. H. I. J. K. When working at boom lengths or radii between the figures shown on the load capacity chart, the next lower capacity rating should be used. It is dangerous to guess the capacity for boom lengths or radii between those listed on the rating plate. It is very dangerous to lift a load without knowing whether it is within the rated capacity while expecting the crane to start to tip to warn of an overload. Cranes may suddenly tip over or the boom may collapse if the load is too heavy. Always stay within the rated capacity. Operators must reduce the load capacity under adverse field conditions until, it is determined, the machine can safely handle the lift. Loads shall not be allowed to exceed rated load capacity and working radius. Do not use counterweights heavier than the manufacturer's recommended weight. Even a light wind can blow the load out of control, collapse booms, or tip machines. Winds aloft can be much stronger than at ground level. Proper precautions shall be taken when the velocity of wind exceeds 20-mph. Crane capacity can be adversely effected when the machine set is not level. Do not lift loads when winds create an unsafe or hazardous condition. Booms should be lowered, if possible, under high wind conditions. Foot pedal brake locks are furnished on some cranes to allow the operator to rest his legs when suspending the load for short periods of time. Operators should keep their feet on the pedals while foot pedal brake locks are in use. Brakes may cool allowing the load to fall. No one, except the oiler, instructor or designated person should be allowed on a crane with the operator when the crane is in operation.

--------------------------------------------------------------Procedural Guidelines D.O. No. 13 series 1998 Page 5 of 36

You might also like