Item 204
Item 204
Item 204
204.1 Description
This Item shall consist of a foundation for surface source composed of soilaggregate,
Portland Cement and water in proper proportions, road-mixed and constructed on a prepared
subgrade/subbase in accordance with this 52 Specification and the lines, grades and typical cross-
sections shown on the Plans or as established by the Engineer
204.2.3 Water
The amount of cement to be added to the soil-aggregate shall be from 6 to 10 mass percent
of the dry soil. The exact percentage to be added shall be fixed by the Engineer on the basis of
preliminary laboratory tests and trial mixes of the materials furnished by the Contractor.
Strength requirements shall conform in all respects to those specified in Subsection 203.2.5.
Portland Cement Stabilized Road Mix Base Course will be measured by the cubic meter
(m3 ). The quantity to be paid for shall be the design volume compacted in-place as shown on the
Plans, and accepted in the completed course. No allowance shall be given for materials placed
outside the design limits shown on the cross-sections. Trial sections shall not be measured
separately but shall be included in the quantity of Portland Cement Stabilized Road Mix Base Course.
The accepted quantities, measured as prescribed, in Section 204.4, shall be paid for at the
contract unit price for Portland Cement stabilized Road Mix Base Course which price and payment
shall be full compensation for furnishing and placing all materials, including all labor, equipment,
tools and incidentals necessary to complete the work prescribed in this Item.
Payment will be made under: