765kV Training
765kV Training
765kV Training
Index
Development of HVAC in world and Areva T&D Experience of 765kV System. Design Aspects and Major Challenges of 765kV System.
Basic Design parameters . B i D i t State-of-the-art technologies. Future Major Challenges. Return of Experiences Case Studies.
Lanco Infratech Ltd. (LITL) Ongoing PGCIL PGCIL PGCIL PGCIL UPPTCL PGCIL Ongoing Ongoing Ongoing Ongoing Ongoing To Start
System Operating Voltage System Highest Voltage Lightning Impulse withstand Voltage (kV) Switching Surge withstand Voltage (kV) q y g Power Frequency Withstand Voltage r.m.s. (kV) Max. Fault Level for 1 sec. (kA) Minimum Creepage Distance (mm) Minimum Corona extinction voltage (kV) Clerances (mm) Phase to Phase Phase to Earth Sectional Clearances
765 kV 800 kV 2100 1500 830 40 20000 508 7600 4900 10300
400 kV 420 kV 1500 1050 630 40/50/63 10500 320 4200 3500 6500
State-of-the-art technologies
The
detail study was done to find an acceptable balance between parameters impacting in the bundle design in EHV like corona, short circuit pinch effect and electrical field in a 765 kV NTPC India substation substation.
Short circuit mechanical criteria
Corona RIV criteria
Electrical field
& health criteria
SELECTED
WORKING AREA
10
State-of-the-art technologies
11
State-of-the-art technologies
The
International Commission on Non-Ionizing Radiation Protection (ICNIRP) has p blished g idelines on e pos re limits for all EMF published guidelines exposure EMF. The guidelines provide adequate protection against known health effects and those that can occur when touching charged objects in an external electric field.
12
State-of-the-art technologies
The
electric field and magnetic fields were calculated for the following geometry based on the layout :
S.No. Variable 1 2 3 4 5 6 7 8 Umax Height above ground for field calculation Conductor bundle Conductor Diameter Sub-Conductor Spacing Phase conductor separation Phase conductor height above ground Busbar Current
Qualifier 800 kV 1.8 18m 4 X Bull 38.25 mm 450/300mm 14 m 14,26 & 38 m 600 A
13
State-of-the-art technologies
The mean value of the electrical field along the switchyard in the switchyard, most exposed area (lower connection level) is 7.20 kV/m < 10 kV/mtaken into account all future extension with 300mm quad bull bundle for equipment at 14m level.
14
State-of-the-art technologies
15
State-of-the-art technologies
Equipotential lines
16
State-of-the-art technologies
Ball
In any cases the magnetic fields in this the working area is 67 T < 500 T.
17
State-of-the-art technologies
The
critical surface gradient of a cylindrical cable has been evaluated using Peek's formula (inception of Corona effect).
18
State-of-the-art technologies
Following observation was made during corona study. The ratio of operating conductor surface gradient to
inception gradient should Eops/Ec < 0.90
corona
The
optimum conductor spacing for the minimum conductor surface gradient (adjacent conductor spacing , not diagonal distance ) is seen from the range of 300 to 400 mm .
19
State-of-the-art technologies
Following
connectors
Limitations
of RIV / corona performance are mainly link to connectors and equipment limitations / design.
20
State-of-the-art technologies
The spacer design is the most critical material in this case, a redesign
of spacer had carried and tested again to meet requirement.
21
State-of-the-art technologies
Some The
Important design issue in terms of Corona for Non Ceramic Insulators (NCI).
presence of corona activity is a good indication of trouble with nonceramic insulators and other transmission line equipment equipment. Corona in such situations is common and not only results in customer complaints about audible noise and radio interference but also degrades the polymeric rubber material of the NCI, which in turn can cause premature f il t failure of th i f the insulation. l ti Hence proper corona shielding shall be provided for NCI in 765 kV Substations.
22
State-of-the-art technologies
Corona Issue with NCI
23
State-of-the-art technologies
Short Circuit force for Towers and Equipment terminals.
At first simplified methods for calculation by hand had been developed for typical cases based upon International standard IEC 60865. In the past only the static behavior of the support has been taken into account. Design loads suggested in IEC 60865 1 take the maximum 60865-1 instantaneous values of short-circuit tensile force Ft, drop force Ff, pinch force Fpi as static load for design purposes. This methodology is not feasible as well as economical for higher system voltages.
24
State-of-the-art technologies
We find to alternate advance methods as International standard IEC 60865 is applicable for voltage class up to 420kV. Now days analytical and numerical methods or a combination of both on computers developed based on Advanced methods use finite element or finite difference modeling. These software further based upon combination of International standard IEC 60865 and CIGRE 214 : The Mechanical effects of short-circuit currents in open air Substation Part-II working group Substation 23.03. Recent development concerns a more on true impact of dynamic loading .
25
State-of-the-art technologies
Some SCF videos which exactly can simulate in todays software's.
26
State-of-the-art technologies
Taken a 450mm bundle as reference 100% for traction load at apparatus terminals, a 300mm arrangement reduce the short circuit stress of 20%
Stress on equipment terminal
120% 100% 80% 60% 40% 20% 0% 200 mm Main BF
250 mm
300 mm
350 mm
400 mm
450 mm
Bundle spacing
27
State-of-the-art technologies
28
The
study shall be carried out in accordance with IEC71-1 and IEC71-2. IEC71 2
Various
configurations (open close status of breakers) of the switchyard shall be considered to arrive at the maximum overvoltage levels at different points in the switchyard. overvoltage study shall be carried out due to switching of incoming line breakers at remote end.
Switching
29
The
study shall be carried out in accordance with IEC71-1 and IEC71-2. IEC71 2
Various
configurations (open close status of breakers) of the switchyard shall be considered to arrive at the maximum overvoltage levels at different points in the switchyard. overvoltage study shall be carried out due to switching of incoming line breakers at remote end.
Switching
30
31
32
33
34
Investigation
carried out and final conclusion was to separate Input /output signal in separate cable.
35
Conclusion According to our experience, EHV Projects require a minutious consideration of key-factors which may not be as important as for lower voltage Projects.
36