23 August 2008 Renewable Energy India 2008 Expo New Delhi
23 August 2008 Renewable Energy India 2008 Expo New Delhi
23 August 2008 Renewable Energy India 2008 Expo New Delhi
BOVING FOURESS
BOVING FOURESS
BOVING FOURESS
BOVING FOURESS
resources
BOVING FOURESS
capacity of 1423 MW Small hydro plants under construction 187 schemes with installation capacity of 521 MW
BOVING FOURESS
40
32
21 17
0
2000 2001 2002 2003 2004 2005 2006 2007 2008
BOVING FOURESS
32%
68%
CORPORATE
23rd August 2008
ENTREPRENUERS
Source: BFL
BOVING FOURESS
BOVING FOURESS
BOVING FOURESS
BOVING FOURESS
Industry Challenges
Hydrology Data Accuracy
Input Cost increase
Project Delays
BOVING FOURESS
Input Costs
Increase in Civil Cost
Increase in Cement and Steel Cost Increase in Fuel Costs Increase in E&M equipment cost
BOVING FOURESS
Dramatic increase in Steel cost in 2008 Increase in Copper prices since 2005 Significant increase in interest rates and hence cost of capital
BOVING FOURESS
Steel Prices
Steel Price in December 2007 Steel Price in April 2008 Increase in Steel Price
Rs 32/Kg - RS 52/Kg
- 62.5%
BOVING FOURESS
BOVING FOURESS
3.9 Cr / MW
4.2 Cr / MW 5 Cr / MW 6.0 Cr /MW 8% 26 % 52%
BOVING FOURESS
BOVING FOURESS
Indonesia
Srilanka
23rd August 2008
BOVING FOURESS
A Power Plant in karnataka, Slated for commissioning Sept 1st Week Photo Taken on 7th August 2008
BOVING FOURESS
A Power Plant in karnataka, Slated for commissioning Oct 1st Week Photo Taken on 28th July 2008
18TH April 2007 CHENNAI
BOVING FOURESS
Policy framework
- Approvals
- Cost mitigation avenues - Duty Exemptions - PPA responsive to input costs
BOVING FOURESS
Authorization
for
imported
BOVING FOURESS
UMPP Situation
New Mega Power Policy (awaiting cabinet approval)
Exemption of customs and excise duty for equipments
BOVING FOURESS
BOVING FOURESS
PPA
PPA Needs to be responsive to the market conditions (Andhra has increased PPA for wind power from 3.10 to 3.50 on account of steel price increase*) Allow for changes in a signed PPA, if ground conditions change No cap on total units generated
* Ref: Economic Time Bangalore edition 14th august 2008
CHENNAI
BOVING FOURESS
Conclusion
Small Hydro is a viable business proposition
Challenges and risks are high The growth can be stimulated by -Responsive PPA (will attract investments)
BOVING FOURESS
BOVING FOURESS