Psoc 1
Psoc 1
Psoc 1
Two important incremental inputs to the load frequency control system PC, the change in speed changer setting; and PD , the change in load demand.
Let us consider a simple situation in which the speed changer has a fixed
setting (i.e., PC =0) and the load demand changes. This is known as
free governor operation. For such an operation the steady change in system frequency for a sudden change in load demand by an amount PD (i.e., PD(s) = PD /s) is obtained as follows: