This document is a method statement log/status sheet for the Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works project. It lists 36 submittals with their reference numbers, description of work, submittal dates, review dates, and status. The status can be approved, approved with notes, disapproved pending corrections, or rejected. It also lists the project name, contract number, client, consultant, and contractor for the project.

Uploaded by

Dia Ajjouri
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
360 views

Method Statement Log-Civil

This document is a method statement log/status sheet for the Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works project. It lists 36 submittals with their reference numbers, description of work, submittal dates, review dates, and status. The status can be approved, approved with notes, disapproved pending corrections, or rejected. It also lists the project name, contract number, client, consultant, and contractor for the project.

Uploaded by

Dia Ajjouri
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

METHOD STATEMENT LOG/STATUS SHEET

PROJECT NAME:

Design and Construction of Sila Wastewater Treatment Plant Expansion and External Sewer Works for Sila Emirati Housing

Total Required Approved With Purewater With Parsons With ADSSC To be Submitted

DATE

28-Jun-12

CONTRACT

O-11014

LEGEND:
STATUS A: For Approved ,Subject to contract requirements For Approved as noted, Re-submission not required.(As noted Observation has to be STATUS B: closed out) STATUS C: For Dis Approved pending corrections, Resubmission required. STATUS D: For Rejected not to specifications. STATUS E: For Returned as in Incomplete Rev. 0 Rev. 1 Rev. 2 STATUS Reference No. Submittal Date 12-Jun-12 12-Jun-12 12-Jun-12 12-Jun-12 12-Jun-12 11-Jun-12 12-Jun-12 Reference No. Comment Date Reference No. Submittal Date Reference No. Comment Date Reference No. Submittal Date Reference No. Comment Date Remarks

CLIENT: CONSULTANT: CONTRACTOR:

AbuDhabi Sewerage Services Company (ADSSC) Parsons Purewater Technology

Item

MS No.

Submittal No.

Description

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

MS-01 MS-02 MS-03 MS-04 MS-05 MS-06 MS-07 MS-08 MS-09 MS-10 MS-11 MS-12 MS-13 MS-14 MS-15 MS-16 MS-17 MS-18 MS-19 MS-20 MS-21 MS-22 MS-23 MS-24 MS-25 MS-26 MS-27 MS-28 MS-29 MS-30 MS-31 MS-32 MS-33 MS-34 MS-35 MS-36

PO-11014-MS-01 PO-11014-MS-02 PO-11014-MS-03 PO-11014-MS-04 PO-11014-MS-05 PO-11014-MS-06 PO-11014-MS-07 PO-11014-MS-08 PO-11014-MS-09 PO-11014-MS-10 PO-11014-MS-11 PO-11014-MS-12 PO-11014-MS-13 PO-11014-MS-14 PO-11014-MS-15 PO-11014-MS-16 PO-11014-MS-17 PO-11014-MS-18 PO-11014-MS-19 PO-11014-MS-20 PO-11014-MS-21 PO-11014-MS-22 PO-11014-MS-23 PO-11014-MS-24 PO-11014-MS-25 PO-11014-MS-26 PO-11014-MS-27 PO-11014-MS-28 PO-11014-MS-29 PO-11014-MS-30 PO-11014-MS-31 PO-11014-MS-32 PO-11014-MS-33 PO-11014-MS-34 PO-11014-MS-35 PO-11014-MS-36

Manual Excavation (Trial Holes) Mechanical Excavation Storage & Handling Pipes Dewatering Pipe Laying Testing of uPVC and GRP Pipes Trench Backfilling Macerator Installation Overpumping Connection to Existing manhole / benching Sewer Pipe Rehabilitation NDM Works Leak Sealing Local Repair Flow Control Sewer Cleaning Penstock Installation Utility Structures Dewatering M&E Facilities Testing of Water Retaining Structures Painting of M&E Structures GRP Insitu Lamination Excavation & Backfilling STPI Dewatering Fixing of Steel Reinforcement PVC Water Tops Installation Masonry Construction (Block Work) Testing of Water Retaining Concrete Structures Bitumen Based Emulsion Paint Application Epoxy Resin Coating Application Crack Injection Repairing Diesel Resistant Lining to Fuel Tank Concrete Enclosure Walls Installation for PVC Conduits Excavation of Cable Laying & Termination STPI Internal Painting System Masonry Construction (Plaster Work) Asphalt Cutting and Reinstatement

FI-O11014/0100/1106/12 FI-O11014/0101/1106/12 FI-O11014/0102/1106/12 FI-O11014/0106/1106/12 FI-O11014/0103/1106/12 FI-O11014/0104/1106/12 FI-O11014/0105/1106/12

O-11014-OL -0042 O-11014-OL -0052 O-11014-OL-0059 O-11014-OL-0043 O-11014-OL-0061 O-11014-OL-0053

18-Jun-12 FI/O11014/0118/2106/12 20-Jun-12 FI/O11014/0133/2606/12

24-Jun-12 26-Jun-12

18-Jun-12 18-Jun-12
21-Jun-12 20-Jun-12 FI/O11014/0132/2606/12

26-Jun-12