Manila Standard Today - Thursday (November 22, 2012) Issue
Manila Standard Today - Thursday (November 22, 2012) Issue
Manila Standard Today - Thursday (November 22, 2012) Issue
S
I
N
S
I
D
E
Gianna Maniego, Editor
Dinna Chan Vasquez, Assistant Editor
REDEFINING STANDARDS
Robinsons Land Corp. introduces its
latest condominium development that
is as precious as a gemstone
The Iggy
TODAY Manila Standard
THURSDAY NOVEMBER 22, 2012
MAGIC MEALS
For the rst time, you can now
cook mouth-watering recipes in
a rice cooker
Lamb burger
CRAVING for burger made of lamb patty? Or just curious to
try one? Dine to your hearts delight as the fast casual gourmet
burger chain Brothers Burger introduces a different burger
experience with the new Brothers Lamb Burger, with french
fries on the side.
Brothers Lamb Burgers half pound, ame-broiled lamb
patty is smothered with a generous amount of pesto and feta
cheese that enhance the pattys already-mouthwatering avor.
Together with Brothers Burgers French Frieslong and
thickly-cut skin-on potatoes fried to golden perfection and
seasoned with salt and pepperyou get a delicious and satisfying
meal that will surely satiate your comfort food cravings.
food crawl
Holiday serendipity
IT IS indeed the season to be merry and discover something that is
irresistible and delicious. Have a delightful Christmas treat with the
all-new Srendipiut ice cream by Yellow Cab.
Serendipity ice cream is the perfect combination of two delicious
desserts: cheesecake and ice cream. Smooth, rich, and creamy
cheesecake ice cream is made more irresistible with chewy graham
cookie bits, making this delicious, new variant from Yellow Cab worth
every bite at only P140 per can.
Yellow Cabs special offering of its New York cheesecake
premium Serendipity ice cream puts a sweet ending to holiday
meals with loved ones, for a more memorable, pleasurable, and
extra-special experience.
Aranaz in 2
nd
collaboration
Sugar rush
CHRISTMAS has always
been one of the countrys
most celebrated holidays as it
combines a lot of the things that
we Filipinos love: festivities,
family, friends and a legitimate
reason to indulge in our love for
desserts. To satisfy everyones
sweet tooth, KFC introduces
dessert-inspired Krushers
avors made especially for the
holiday season.
The Christmas Krushers
line includes two so good
avors that everyone is sure to
enjoy Double Dutch and Sans
Rival. The Double Dutch Krushers is a decadent choco-vanilla drink with
chocolate and soft marshmallow bits, while the Sans Rival Krushers is a
rich buttercream drink with crunchy meringue bits.
This year, KFC is making the Christmas Krushers even more
special by offering customers the option to have their favorite
Krushers flavor topped with frothy whipped cream. The Double
Dutch and Sans Rival Krushers are now available in all KFC stores
nationwide for only P75.00.
CYAN MAGENTA YELLOW BLACK
CYAN MAGENTA YELLOW BLACK
THURSDAY C2
NOVEMBER 22, 2012
home work relationships
standardlifestyle@gmail.com
Gianna Maniego, Editor
Dinna Chan Vasquez, Assistant Editor
ManilaStandardToday
dotcom
THE rainy season brings much
hope as it provides sustenance
in terms of agriculture as well as
reinvigorates the earth. Howev-
er, excessive rainfall does have
its downside, as oods and other
calamities, and their attendant
health concerns, also become
frequent during this season.
Besides the structural damage
that extreme weather sometimes
brings there are problems that
people and families deal with
on a more personal level. Dur-
ing these times the population
experiences a signicant spike
in the incidence of various dis-
eases and illnesses related to the
rains and the damp.
One specic part of the body
that is especially prone to dis-
eases is the eye. Because they
are extremely sensitive, the
eye is very susceptible to vari-
ous issues especially since the
rainy season brings viral, bac-
terial, and fungal infections
less common during drier
times of the year.
The premium ophthalmic
care provider American Eye
Center identies these season-
al eye and offers some advice
on how to treat and prevent
specic cases.
Conjunctivitis, commonly
known as pinkeye, is an infec-
tion caused by the inammation
of the conjunctiva, which is the
thin clear tissue that lies over
the white part of the eye and
lines the inside of the eyelid.
The disease can be attributed
to many factors such as allergic
reaction to certain type of sub-
stances; irritation caused by dirt,
smoke, or chemicals; as well as
bacteria and viruses. Cases of
pinkeye should be handled with
care because the infection is
highly communicable.
Some common symptoms as-
sociated with pinkeye include
redness in the white of the eye
or inner eyelid, discharge com-
ing from the eye that crust over
the eyelids, itchy or burning
eyes, blurred vision, and in-
creased sensitivity to light.
Although conjunctivitis
might not be a serious health
risk it is highly encouraged to
have the eye diagnosed by a
specialist since treatment begins
with determining the infections
extent and its cause.
While treatment for various
types of pinkeye is available and
accessible, prevention is still the
best way to avoid catching it.
Observing simple practices like
frequent hand washing, avoid-
ing contact between the hands
and eyes, changing bed covers
often and avoiding reuse of tow-
els, washcloths, and handker-
chiefs should do the trick. Avoid
sharing, and observe regular
replacement of, eye cosmetics;
the proper use of contact lenses
will also minimize chances of
acquiring the infection.
Corneal ulcer occurs when
erosion on the surface of the
cornea develops through in-
ammation due to infection or
injury. This condition is very
serious and must be treated
promptly to avoid lasting prob-
lems like severe loss of vision or
even blindness.
Common causes of corneal
ulcer include viruses, bacteria,
injury, fungi, amoebas, severe
allergic disease, as well as in-
adequate eyelid closure. At its
onset, symptoms of the condi-
tion are very obvious. Patients
may suffer redness, tearing,
discharge, blurry vision, itch-
ing or burning sensation, light
sensitivity, and formation of a
white spot on the cornea. Be-
cause the cornea is very sen-
sitive, corneal ulcers tend to
produce severe pain.
Its best to immediately con-
sult with an eye expert as soon
as symptoms arise in order to
evaluate the situation and begin
treatment. Antibiotics, antiviral
or antifungal medications, as
well as different eye drops are
prescribed by doctors to treat the
condition. However, preventive
measures such as protecting the
eye from small particles, as well
as proper use and maintenance
of contact lenses will save you
much grief.
Protect
yourself
against eye
infections
By Ed Biado
THE average bed has a lifespan
of 10 years. During that time,
you could have gotten married,
had kids, been promoted and ex-
perienced a lot of life events
some important, others not so
muchand your nightly com-
panion has been with you every
step of the way.
A new study conducted by
UK-based bedding
company Dreamland
reveals that the bed,
as mundane and of-
ten taken for granted
as it is, actually is
witness to plenty of
everyday activities.
And if your bed could
talk, it would say
things about you that you prob-
ably dont even realize, like how
many times youve gotten laid.
The research found that a
10-year-old bed would have
hosted 720 arguments (six every
month), 3,640 cuddles, 4,160
kisses and 480 sex sessions. Half
the arguments are about hogging
the blanket.
The bed is not just used in
sleeping and under-the-covers
activities, so it seems, because
it would have been an acces-
sory to 120 breakfasts in bed
and 240 books read, according
to the survey answered by 2,000
respondents in the United King-
dom. Out of the 10 years, they
spent almost three and a half
years (eight hours and 15 min-
utes a night) lying in bed. Time
spent sleeping totals two years
and eight months (six and a half
hours a night).
Technology is getting its fair
share of our precious time in bed
as well. A little less than 39 hours
of the 10-year period is taken up
by talking on the phone, almost
48 whole days watch-
ing TV or DVDs and
over 70 days check-
ing social networking
sites while snuggling
under the covers. Of
which, 3,650 tweets
would have been
posted. We would
also have sent 4,160
emails and 14,600 text messages
before dozing off and/or right af-
ter waking up.
Because of electronic devices
and everything wireless, pro-
fessional and social activities
have invaded the space that was
once exclusively associated with
sleep and relaxation. Many peo-
ple nowadays feel the need to
be connected even in their most
intimate and personal moments
while others have no choice but
to check their work email before
switching off the bedside lamp.
And thats probably why theyre
either not sleeping well or not
getting enough sleep.
In fact, most people would not
mind using a chunk of their sav-
ings just to own even a few of
these precious gemstones such
as sapphires, which are known
for its immaculate beauty, con-
stancy, durability and hardness,
and whose values are known to
appreciate over time.
The same highly regarded
qualities are likewise mirrored
in the latest condominium de-
velopment of Robinsons Land
Corp., the Sapphire Bloc, which
promises to redene anew the
standards of a sophisticated
metro lifestyle.
Bedtime activities
in numbers
A cooking
innovation
for busy
lifestyles
Strategically located in the center of the bustling Ortigas District, The Sapphire Bloc, a four-tower residential and commercial development, will sit on a 8,421 sqm. property bound-
ed by Sapphire, Garnet and Onyx Roads.
Artists perspective of The Sapphire Blocs landscaped garden.
The Sapphire Bloc Kiddie Pool
REDEFINING
STANDARDS
INVESTMENTS
made on gemstones
are often considered
a wise and promising
venture.
Strategically located in the
center of the bustling Ortigas
District, The Sapphire Bloc, a
four-tower residential and com-
mercial development, will sit on
a 8,421 sqm. property bounded
by Sapphire, Garnet and Onyx
Roads.
It is envisioned to become
the newest stand-out leisure
destination in the area, as The
Sapphire Bloc will be offering
its future residents a comfort-
able and convenient lifestyle
through its well-designed resi-
dential towers and a unique
commercial lifestyle bloc com-
ponent on its ground oor.
Robinsons Land Corporation
aims to set the new standard in
residential developments in its
home, the Ortigas Central Busi-
ness District. With this in mind,
The Sapphire Bloc will be Or-
tigas Biggest Lifestyle Bloc,
said Mybelle Ar agon-GoBio,
vice president for Business De-
velopment and Financing.
The end goal, simply put, is to
satisfy the discerning needs and
wants of the active and career-
oriented individuals, whose life-
styles demand the satisfaction
and convenience of owning an
abode at the heart of the city. By
owning a unit at The Sapphire
Bloc, future residents are thus
guaranteed accessibility to all
things that matter to them, with
some of these choice destina-
tions now even made reachable
by foot.
Among these top-notch ame-
nities that will guarantee utmost
comfort are function rooms, pri-
vate theater, game room, tness/
gym, adult swimming pool, kid-
die pool, pool deck, massage/
sauna rooms, lawn, childrens
playground, gazebo, viewing
deck and landscaped areas.
Rising 38 stories high, The
Sapphire Bloc will have a total of
414 units with cuts ranging from
30 sqm to 37.3 sqm for a one-
bedroom unit (priced anywhere
between P3 million and P4.08
million); 45.5 sqm to 60 sqm for
a two-bedroom unit (P4.9 mil-
lion to P6.6 million); and97 sqm
for a three-bedroom unit (P10.42
million to P10.6 million).
FOR the average Filipino, a
complete meal means only one
thing: a hearty serving of viand
paired with steaming white rice.
To help the country rediscover
the magic of meals prepared
and enjoyed at home, Nestle in-
troduces one of its game-chang-
ing innovations to dateMaggi
Magic Meals.
With Maggi Magic Meals,
anyone can gain instant know-
how in cooking some of the
most complex Filipino recipes.
Pinoy favorites like Bicol Ex-
press, Afritada, Lechon Paksiw
and Chicken Pastel can now all
be prepared in a method that is
as easy and as simple as cook-
ing rice.
To prepare the dish of your
choice, just follow these ve
simple steps:
Place your chicken or pork
pieces together with thinly
sliced vegetables inside the
Maggi Magic Cooking Bag
(chicken has to be scored or
sliced lightly three times per
side to ensure thorough cook-
ing; pork pieces need to be
sliced into thin strips)
Add the Maggi Magic
Recipe Mix which contains
a complete blend of flavors
to create a delicious stew. No
need for additional ingredi-
ents, except the fresh meat
and vegetables.
Add 6 tbsps. of water into the
cooking bag.
Massage the bag gently to
dissolve the mix, then seal the
bag by tying a knot.
Place the cooking bag atly
on top of washed rice, then
start cooking the rice as you
normally would. After 45 mins,
both rice and ulam are ready
to serve!
CYAN MAGENTA YELLOW BLACK
CYAN MAGENTA YELLOW BLACK
NOVEMBER 22, 2012 THURSDAY
C3
ManilaStandardTODAY
online.editor@manilastandardtoday.com
Marlon Magtira, Editor
Tech
ManilaStandardToday
How to recognize
and dispense with
Web site malwares
THE Internet continues to be popular
among us, with many even considering it
a necessity. Recent gures reveal some 30
million Filipinos benetting from it from
doing research, reading news, shopping
and connecting with families and friends
through social networks.
However, virus authors have
been creating malicious software
specically designed to infect web-
sites. The idea is to infect a website
and let the infection spread by infect-
ing the PCs of the sites visitors. Un-
fortunately, it is highly probable that
even website administrators might
not know their sites are infected.
In a recent report, Kaspersky Lab
security researcher Marta Janus re-
vealed that website owners would
complain of false alarms whenever
a Kaspersky Lab product blocks ac-
cess to their portal, believing they do
not host any malicious content.
Unfortunately, they are wrong
in most cases and malicious scripts
are indeed found within their web-
sites, injected into their sites origi-
nal code, said Janus.
These scripts redirect visitors
to malicious websites. The execu-
tion of malware is usually com-
pletely invisible to the user, who
sees the Web site appearing to op-
erate as usual, she said.
This is a result of drive-by down-
load where the computer becomes
infected just by visiting a Web site
which contains malicious code; ex-
ploiting vulnerabilities in software
running on the users computer (e.g.
Java, Flash, PDF viewers, browser
plug-ins) to silently install itself on
an infected machine.
Cybercriminals have differ-
ent evil goals in creating malicious
codes, according to Janus. These
include widening their targets for
spamming and phishing, stealing
content and passwords, hijacking In-
ternet trafc, and promoting illegal
activities, among others.
Generally speaking, theres
nothing new here. It is indirect nan-
cial gain that drives cybercriminals
to infect websites, said Janus
Identifying the culprit
Typical signs of a malware-in-
fected website include the follow-
ing: (i) users complain that the Web
site is blocked by the browser or se-
curity software, (ii) website is black-
listed by Google or added to some
other database of malicious URLs,
(iii) signicant change in trafc and/
or drop in search engine rankings,
(iv) Web site does not work prop-
erly, displays errors and warnings;
and (v) after visiting the Web site,
computers exhibit strange behavior.
The infections usually remain
unnoticed for a long time, often be-
cause of the level of sophistication
of the malware. Some of these mal-
wares codes are usually obfuscated
or obscured, thus misleading the
administrator that their Web site is
uninfected.
Cleaning tools
If there are symptoms of possible
infection, the website has to be de-
activated until the problem has been
resolved, according to Janus. This is
essential, as every moment of delay
acts in favor of the cybercriminals,
exposing more potential victims to
the problem and spreading the infec-
tion over the Internet. The adminis-
trator also needs to check the server
logs to see if there are any suspicious
activities, like strange requests from
IP addresses located in unlikely
countries, and so on.
Next, back up the contents of
an infected site, and run a Web site
scanning tool using online or in-
stalled security applications, and
manually removing the infection.
The latter method requires utmost
care, as it means having to look at all
the codes in the infected website and
nding out codes that look obscure
and unreadable.
Code obfuscation is a com-
mon technique for malware writ-
ers and it is relatively unusual for
any other website-related software.
If you havent obfuscated the code
yourself, you have every reason to
be suspicious about it. Do be care-
ful, thoughnot all obfuscated code
will prove malicious added Janus.
Website security basics
Nothing beats having all the pre-
ventive measures than just the cure
for malware attacks. Janus empha-
sized on a number of basics that Web
site administrators must do to ensure
the safety and security of their Web
sites and their visitors:
1. Use of strong passwords
Passwords are the foundation of
server security, and they should be
changed on a regular basis.
2. Being up-to-datePerform
regular updates. Cybercriminals tend
to exploit vulnerabilities in software,
no matter whether the malware is
aimed at PC users or at websites and
web servers. All the software that
you manage from your server ac-
count should be the newest possible
versions and every single security
patch should be applied as soon as
they are released. Keeping all soft-
ware fully patched and up-to-date
will decrease the risk of an exploit-
based attack. A regularly updated
list of known vulnerabilities can be
found on http://cve.mitre.org
3. Creating frequent backups
Having a clean copy of server
content will certainly save you a
great deal of time and effort not to
mention that a fairly recent backup
may prove very useful when deal-
ing with other problems, as well as
infection.
4. Regular le scanning Even
if there are no visible infection
symptoms, its good practice to scan
all server les once in a while.
5. Taking care of PC security
As a great deal of website malware is
spread with the use of infected PCs,
the security of the desktop computer
used to manage your website is one
of the most important aspects of
website security.
6. Server hardening If you own
the server, you should pay attention
to conguring it as securely as
possible. Such activity may include,
but is not limited to: (i) removing all
unused software, (ii) disabling all
unnecessary services and modules,
(iii) setting appropriate policies for
users and groups, (iv) setting secure
permissions or restricting access
to certain les and directories,
(v) disabling directory browsing,
(vi) collecting log les, which are
checked for suspicious activity
on a regular basis, and (vii) using
encryption and secure protocols.
Christian Cardiente
CYAN MAGENTA YELLOW BLACK
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGION III
OFFICE OF THE DISTRICT ENGINEER
BULACAN 2
nd
DISTRICT ENGINEERING OFFICE
Pulong Buhangin, Sta. Maria, Bulacan
November 16, 2012
(MST-Nov. 22, 2012)
INVITATION TO BID
The Bids and Awards Committee (BAC) of the Department of Public Works and Highways
(DPWH) of Bulacan 2
nd
District Engineering Offce, through the Fund 101 GAA - DPWH
Regular Infrastructure Program CY 2013 and DPWH Flood Control Program CY 2013, invites
contractors to bid for the aforementioned projects:
1. Contract ID: 12CD0292
Contract Name: Road Upgrading (Gravel to Paved) of Eastern Bulacan Road,
K098+000 - K0100+000, Doa Remedios Trinidad, Bulacan
Contract Location: Doa Remedios Trinidad, Bulacan
Scope of Work: Concreting of road/Slope protection; L= 1,480 l.m.
Approved Budget for the Contract (ABC): Php 48,999,859.80
Contract Duration : 210 calendar days
2. Contract ID: 12CD0293
Contract Name: Repair/Rehabilitation of Damaged Existing Dike along Palasan
River, Obando, Bulacan, Phase I, Sta. 00+000 Sta. 0+238
Contract Location: Obando, Bulacan
Scope of Work: Slope Protection/Steel Sheet Pile/Concrete Sheet Pile, L= 244.00
l.m.
Approved Budget for the Contract (ABC): Php 46,255,665.68
Contract Duration : 230 calendar days
3. Contract ID: 12CD0294
Contract Name: Repair/Rehabilitation of Damaged Existing Dike along Palasan
River, Obando, Bulacan, Phase II, Sta. 00+493 Sta. 00+743
Contract Location: Obando, Bulacan
Scope of Work: Slope Protection/Steel Sheet Pile/Concrete Sheet Pile, L= 255.80
l.m.
Approved Budget for the Contract (ABC): Php 48,509,101.23
Contract Duration : 240 calendar days
4. Contract ID: 12CD0295
Contract Name: Construction of Flood Control Wall along Palasan River, Obando,
Bulacan Phase IV, Sta. 1+364 Sta. 1+614 (Right Side)
Contract Location: Obando, Bulacan
Scope of Work: Slope Protection/Steel Sheet Pile/Concrete Sheet Pile, L= 255.80
l.m.
Approved Budget for the Contract (ABC): Php 48,509,101.23
Contract Duration : 240 calendar days
5. Contract ID: 12CD0296
Contract Name: Construction of Flood Control Wall along Palasan River, Obando,
Bulacan Phase X, Sta. 2+580 Sta. 2+818 (Right Side)
Contract Location: Obando, Bulacan
Scope of Work: Slope Protection/Steel Sheet Pile/Concrete Sheet Pile, L= 244.00
l.m.
Approved Budget for the Contract (ABC): Php 46,255,665.68
Contract Duration : 230 calendar days
The BAC will conduct the procurement process in accordance with the Revised IRR of R.A.
9184. Bids received in excess of the ABC shall be automatically rejected at the opening of bid.
To apply and to bid for this contract, a contractor must submit a Letter of Intent (LOI) signed
and submitted by the person authorized in the Contractors License issued by PCAB. Upon
submission of the LOIs, interested Contractor must also submit the photo copy and original
(for authentication purpose and issuance of Bid Documents) of the following documents: 1.
Class A Documents (contained in the Contractors Registration Certifcate) (CRC), 1.1 Legal
Documents: a) DTI Business Name Registration (DTI) or SEC Registration or CDA; b) Valid
and Current Mayors Permit/Municipal License; 1.2. Technical Documents; a) Valid Joint
Venture Agreement, in case of J.V., b) Valid PCAB License and Registration c) Certifcate of
Materials Engineer Accreditation duly certifed by the Authorized Managing Offcer (AMO), d)
Latest copy of AMO course Seminar, e) Certifcate of Safety Offcer Seminar from DOLE, f)
Document Request List (DRL) g) Latest CPES Rating; 1.3. Financial Documents; a) Prospective
bidders Audited Financial Statement for the preceding calendar which should not be earlier
than 2 years from the date of bid submission; b) Prospective bidders computation of its NFCC.
The LOI must be submitted by the Authorized Liaison Offcer as specifed in the Contractors
Information (CI). Submission of LOI by persons with Special Power of Attorney shall not be
allowed. Contractors who will purchase bid documents and must meet the following major
criteria: (a) prior registration with DPWH & PHILGEPS, (b) Filipino citizen or 75% Filipino-
owned partnership, corporation, cooperative, or joint venture with PCAB license applicable to
the type and cost of this contract, (c) completion of a similar contract costing at least 50% of
ABC within a period of 10 years, and (d) Net Financial Contracting Capacity at least equal to
ABC, or credit line commitment for at least 10% of ABC. The BAC will use non-discretionary
pass/fail criteria in the eligibility check and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for registration to the
DPWH-POCW Central Offce before the deadline for the receipt of LOI. The DPWH-POCW will
only process contractors applications for registration with complete requirements and issue
the Contractors Certifcate of Registration (CRC). Registration Forms may be downloaded at
the DPWH website www.dpwh.gov.ph.
The signifcant times and deadlines of procurement activities are shown below:
1. Receipt of LOI from Prospective Bidders Until 10:00 A.M. of December 11, 2012
2. Issuance of Bidding Documents From: November 20, 2012 up to 10:00 A.M. of December 11, 2012
3. Pre-Bid Conference 2:00 P.M. of November 27, 2012
4. Submission of Bids Deadline: 10:00 A.M. of December 11, 2012
5. Opening of Bids December 11, 2012 @ 2:00 P.M.
The BAC will issue hard copies of Bidding Documents (BDs) at DPWH-Bulacan 2
nd
District
Engineering Offce, Pulong Buhangin, Sta. Maria, Bulacan, upon payment of a non-refundable
fee for Bidding Documents Twenty Thousand Pesos (Php 20,000.00). Prospective bidders may
also download the Bidding documents (BDs), from the DPWH website, if available. Prospective
bidders that will download the BDs from DPWH website shall pay the said fees on or before the
submission of their Bids Documents. The Pre-Bid Conference shall be open only to interested
parties who have purchased the BDs. Bids must be accompanied by a bid security, in the
amount and acceptable form, as stated in Section 27.2 of the Revised IRR.
Prospective bidders shall submit their duly accomplished forms as specifed in the BDs
in two (2) separate sealed bid envelopes to the BAC Chairman. The frst envelope shall
contain the technical component of the bid, which shall include a copy of the CRC. The second
envelope shall contain the fnancial component of the bid. Contract will be awarded to the
Lowest Calculated Responsive Bid as determined in the bid evaluation and post-qualifcation.
The DPWH-Bulacan 2
nd
District Engineering Offce reserves the right to accept or reject
any bid, to annul the bidding process at anytime prior contract award, without thereby incurring
any liability to the affected bidder/s.
APPROVED:
(Sgd.) ALEJANDRO B. CENTENO
BAC Chairman
NOTED:
(Sgd.) ERELINA B. SANTOS
District Engineer
Republic of the Philippines
Department of Public Works and Highways
Region VII
OFFICE OF THE DISTRICT ENGINEER
Bohol 3
rd
District Engineering Offce
Guindulman, Bohol
(MST-Nov. 22, 2012)
INVITATION TO BID
The DPWH, Bohol 3
rd
District Engineering Offce, Brgy. Sawang, Guindulman, Bohol, through its Bids and
Awards Committee (BAC), invites contractors and suppliers to apply to bid for the following contracts:
I. Advertisement Number: A 111-12
1.) Contract Name : Const. of Water Works System
2.) Contract Location : Abaca, Mabini
3.) Brief Description : Supply and delivery of construction materials for construction of
Waterworks system, Abaca, Mabini
4.) Total Approved Budget
for the Contract : PhP 111,371.00
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 100.00
II. Advertisement Number : A 112-12
1.) Contract Name : Const. of Water Works System
2.) Contract Location : San Roque, Mabini
3.) Brief Description : Supply and delivery of construction materials for construction of
Waterworks system, San Roque, Mabini
4.) Total Approved Budget
for the Contract : PhP 111,357.25
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 100.00
III. Advertisement Number : A 113-12
1.) Contract Name : Rehab. of Water Supply System
2.) Contract Location : Bonkokan Ubos, Lila, Bohol
3.) Brief Description : Supply and delivery of construction materials for Rehabilitation of Water
Supply System, Bonkokan Ubos, Lila
4.) Total Approved Budget
for the Contract : PhP 139,717.40
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 100.00
IV. Advertisement Number : A 114-12
1.) Contract Name : Const. of Multi-purpose Building (Brgy. Health Center)
2.) Contract Location : Can-ayaon East, Garcia-Hernandez, Bohol
3.) Brief Description : Supply and delivery of construction materials for construction of Const.
of MPB, Can-ayaon East, Garcia-Hernandez, Bohol
4.) Total Approved Budget
for the Contract : PhP 211,443.40
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 200.00
V. Advertisement Number : A 115-12
1.) Contract Name : Const. of Two (2) Classroom School Building, Bangwalog H/S
2.) Contract Location : Bangwalog, Duero, Bohol
3.) Brief Description : Supply and delivery of construction materials for construction of Two
(2) CL S/B, Bangwalog H/S, Bangwalog, Duero
4.) Total Approved Budget
for the Contract : PhP 526,183.92
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 500.00
VI. Advertisement Number : A 116-12
1.) Contract Name : Const. of Two (2) Classroom School Building, Bangwalog H/S
2.) Contract Location : Bangwalog, Duero, Bohol
3.) Brief Description : Labor for the construction of Two (2) CL S/B, Bangwalog H/S,
Bangwalog, Duero
4.) Total Approved Budget
for the Contract : PhP 186,097.88
5.) Contract Duration : 45 Calendar days
VII. Advertisement Number : A 117-12
1.) Contract Name : Const. of Two (2) Classroom School Building, Bulawan E/S
2.) Contract Location : Bulawan, Mabini, Bohol
3.) Brief Description : Supply and delivery of construction materials for construction of Two
(2) CL S/B, Bulawan E/S, Bulawan, Mabini
4.) Total Approved Budget
for the Contract : PhP 526,183.92
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 500.00
VIII. Advertisement Number : A 118-12
1.) Contract Name : Const. of Two (2) Classroom School Building, Bulawan E/S
2.) Contract Location : Bulawan, Mabini, Bohol
3.) Brief Description : Labor for the construction of Two (2) CL S/B, Bulawan E/S, Bulawan,
Mabini
4.) Total Approved Budget
for the Contract : PhP 186,097.88
5.) Contract Duration : 45 Calendar days
IX. Advertisement Number : A 120-12
1.) Contract Name : Rehabilitation of Barangay Road
2.) Contract Location : El Progreso, Carmen, Bohol
3.) Brief Description : Supply and delivery of construction materials for the Rehab. Of Barangay
Road
4.) Total Approved Budget
for the Contract : PhP 103,819.12
5.) Contract Duration : 10 Calendar days
6.) Bid Documents : PhP 100.00
Bidding will be conducted through open competitive bidding procedures in accordance with R.A. 9184
and its Revised Implementing Rules and Regulations.
To bid for this contract, a supplier must submit a Letter of Intent (LOI) and must meet the following major
criteria: (a) Prior registration with the Philippine Government Electronic Procurement System (PHILGEPS)
and DPWH registry, (b) Filipino citizen or 60% Filipino-owned partnership/corporation, (c) completion
of a similar contract costing at least 50% of ABC, and (d) Net Financial Contracting Capacity at least
equal to ABC, or credit line commitment for at least 10% of ABC. The BAC will use non-discretionary
pass/fail criteria in the eligibility check, preliminary examination of bids.
Unregistered suppliers, however, shall submit their applications for registration (Suppliers Registration
Certifcate), to the DPWH Bohol 3
rd
District Engineering Offce, Brgy. Sawang, Guindulman, Bohol before
the deadline set below for the receipt of LOIs. The DPWH Bohol 3
rd
District Engineering Offce will only
process suppliers applications for registration, with complete registration requirements.
The signifcant times and deadlines of procurement activities are shown below:
1. Receipt of LOIs from Prospective Bidders Deadline: Dec. 3, 2012 - 5:00 PM
2. Issuance of Bidding Documents Nov. 20 Dec. 10, 2012 - 9:00 AM
3. Receipt of Bids Dec. 10, 2012 -10:00 AM
4. Opening of Bids Dec. 10, 2012 -10:15 AM
Prospective bidders shall submit their duly accomplished forms as specifed in the Bidding Documents
(BDs) in two (2) separate sealed bid envelopes to the BAC Chairman. The frst envelope shall contain
the technical component of the bid, including the eligibility requirements. The second envelope shall
contain the fnancial component of the bid. Contract will be awarded to the Lowest Calculated Responsive
Bid as determined in the bid evaluation and the post-qualifcation.
Prospectivebidders may downloadtheLetter of Intent (LOI) fromtheDPWHwebsitewww.dpwh.gov.ph. The
BAC will issue hard copies of LOI Forms at BAC Offce Bohol 3
rd
District Engineering Offce Brgy. Sawang,
Guindulman, Bohol, uponpayment of anon-refundablefeeof PhP100.00eachfor Advertisement Nos. A-111-
12, A-112-12. A-113-12 and A-120-12; Php200.00 for Advertisement No. A-114-12; and PhP500.00 each for
Advertisement Nos. A-115-12 and A-117-12. Prospective bidders that will download the LOI forms shall pay
the same amount upon submission of their accomplished LOIs at the same address.
Prospective bidders may also download the Bidding Documents (BDs), if available, from the DPWH
website. The BAC will also issue hard copies of the BDs at the same address to prospective bidders
upon payment of a non-refundable fee as scheduled in each contract. Prospective bidders that will
download the BDs from the DPWH website shall pay the said fees upon the submission of their bids.
Bids must accomplished by a bid security in any acceptable form in the amount stated in Section 27.2
of the Revised IRR.
The Bohol 3
rd
District Engineering Offce Brgy. Sawang, Guindulman, Bohol reserves the right to accept
or reject any bid and to annul the bidding process anytime before Contract award, without incurring any
liability to the affected bidders.
Approved by:
(Sgd.) AFIALITA M. DANIEL
Engineer III
BAC Chairman
Noted:
(Sgd.) EDILBERTO R. ATIVO
District Engineer
Republic of the Philippines
Department of Public Works and Highways
Region VII
OFFICE OF THE DISTRICT ENGINEER
Bohol 3
rd
District Engineering Offce
Guindulman, Bohol
(MST-Nov. 22, 2012)
INVITATION TO BID
The (DPWH-Bohol 3
rd
District Engineering Offce), Brgy. Sawang, Guindulman, Bohol, through
its Bids and Awards Committee (BAC), invites contractors to apply to bid for the following contract:
Contract ID: 12HB0017
a. Name of Project : Construction and Rehabilitation of Roads (Cluster I)
b. Location of Project : Candijay, Bohol
A. Location : Cogtong, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget for the Contract : PhP 300,000.00
B. Location : Lungsodaan, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
C. Location : San Isidro, Candijay
Brief Description : Portland Cement Concrete Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
D. Location : La Union, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
E. Location : Tugas, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
F. Location : Panas, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
G. Location : Boyo-an, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
H. Location : Tambongan, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 300,000.00
I. Location : Abijilan, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
J. Location : Cadapdapan, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
K. Location : Tubod, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
L. Location : Canawa, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
M. Location : Mahangin, Candijay
Brief Description : Aggregate Subbase Course, Portland Cement Concrete
Pavement, Pipe Culverts (600mmx1.00m), Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
N. Location : Anoling, Candijay
Brief Description : Portland Cement Concrete Pavement, Project Billboard
Major Item of Work : 311
Approved Budget
for the Contract : PhP 200,000.00
b. Total Approved Budget
For the Contract : PhP 3,600,000.00
c. Contract Duration : 150 Calendar Days
Bidding will be conducted through open competitive bidding procedures in accordance with R.A.
9184 and its Revised Implementing Rules and Regulations.
To bid for this contract, a contractor must submit a Letter of Intent (LOI) and must meet the
following major criteria: a.) prior registration with the DPWH, (b) Filipino citizen or 75% Filipino-owned
partnership, corporation, cooperative, or joint venture with PCAB license applicable to the type and
cost of this contract, (c) Completion of a similar contract costing at least 50% of ABC within a period of
10 years, and (d) Net Financial Contracting Capacity at least equal to ABC, or credit line commitment
for at least 10% of ABC. The BAC will use non-discretionary pass/fail criteria in the eligibility check
and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for registration to the DPWH-
POCW Central Offce before the deadline for the receipt of LOI. The DPWH-POCW-Central Offce
will only process contractors applications for registration, with complete requirements, and issue the
Contractors Certifcate of Registration (CRC).
The signifcant times and deadlines of procurement activities are shown below:
1. Receipt of LOIs from Prospective Bidders Deadline: Dec. 3, 2012 - 5:00 PM
2. Issuance of Bidding Documents Nov. 20 Dec. 10, 2012 - 9:00 AM
3. Pre-Bid Conference Nov. 28, 2012 - 10:00 AM
4. Receipt of Bids Dec. 10, 2012 -10:00 AM
5. Opening of Bids Dec. 10, 2012 -10:15 AM
Prospective bidders shall submit their duly accomplished forms as specifed in the Bidding
Documents (BDs) in two (2) separate sealed bid envelopes to the BAC Chairman. The frst envelope
shall contain the technical component of the bid, including the eligibility requirements. The second
envelope shall contain the fnancial component of the bid. Contract will be awarded to the Lowest
Calculated Responsive Bid as determined in the bid evaluation and the post-qualifcation.
Prospective bidders may also download the Letter of Intent (LOI) from the DPWH website
www.dpwh.gov.ph. The BAC will issue hard copies of Bidding Documents at BAC Offce Bohol 3rd
District Engineering Offce Brgy. Sawang, Guindulman, Bohol.
Prospective bidders may also download the Bidding Documents (BDs) from the DPWH website.
The BAC will also issue hard copies of the BDs at the same address to prospective bidders upon
payment of non-refundable fee of PhP 5,000.00. Bidders that will download the BDs from the DPWH
website shall pay the said fees on or before the submission of their bids. Bids must accomplished
by a bid security in any acceptable form in the amount stated in Section 27.2 of the Revised IRR.
The Bohol 3
rd
District Engineering Offce Brgy. Sawang, Guindulman, Bohol reserves the right to
accept or reject any or all bid and to annul the bidding process anytime before Contract award, without
incurring any liability to the affected bidders.
Approved by:
(Sgd.) AFIALITA M. DANIEL
BAC Chairman
Noted:
(Sgd.) EDILBERTO R. ATIVO
District Engineer
CYAN MAGENTA YELLOW BLACK
CYAN MAGENTA YELLOW BLACK
NOVEMBER 22, 2012 THURSDAY
C4
Isah V. Red, Editor standard.showbiz@gmail.com
showbitz
Manila Standard TODAY
ISAH V.
RED
SIMPLY RED
WE have seen the
combined forces
of Agimat and
Enteng Kabisote
in the 2010 Metro
Manila Film
Festival (MMFF)
transform box-
ofce history to
the heights of
glory.
Two years after, in MMFF
2012, prepare as the two for-
midable giants of the local
lmmaking worldVic Sotto
and Ramon Bong Revilla,
Jr.once again join their
stellar powers and listed the
services of an equally bank-
able actress in the person of
Judy Ann Santos, to come up
with the next adventure-lled
chapter of their heroic exploits
in Si Agimat, Si Enteng Ka-
bisote at Si Ako.
Produced jointly by indus-
try powerhouse outts Imus
Productions, OctoArts Films,
M-Zet TV, APT Entertainment
and GMA Films, Si Agimat, Si
Enteng Kabisote at Si Ako is
poised not just to lord it over
the tills, but to bring cheers,
goodwill and love as it once
again espouses family values,
adventure, fun and magical
fantasy when the MMFF fever
starts raging on Dec. 25.
Director Tony Y. Reyes,
who has helmed all the En-
teng Kabisote series in the re-
cent MMFF past, says that the
challenge to outdo the last one
is always the hardest one to
tackle. In 2010, Sen. Bong and
Bossing Vic already teamed up
and it broke all box-ofce re-
cords when they did. This time
around, how do we top that?
Thats when the name of Judy
Ann Santos came in. We now
have not just one, not two, but
three box-ofce giants in one
movie, he said. Can it get any
bigger than that?
Big-budgetted, locations
in the most spectacular places
in the Northern part of the
Philippines and elsewhere,
dedicated sound stages dur-
ing the entire lming, CGI ef-
fects done abroad, the movie
is grand in every aspect. With
all the ve production com-
panies backing this one proj-
ect up, everyone predicts this
early that Si Agimat, Si Enteng
Kabisote, at Si Ako will be a
runaway winner.
Direk Tony said both Boss-
ing Vic and Sen. Bong are the
same in a lot of waysfor
one, they are more concerned
about giving the best that
they can offer to the Filipino
movie-going public, more
THE Kapamilya network won eight
recognitions at the 11
th
Philippine
Quill Awards, the most number of
awards for a TV network, including
the Top Award in Communication
Skills division for DZMM.com.ph
(http://dzmm.com.ph/). The total win
of ABS-CBN made it the 2
nd
runner-
up in the race for the Philippine Quill
Awards Company of the Year.
Dzmm.com.ph, which bested all
entries in the Philippine Quills com-
munication skills division, also re-
ceived an Award of Excellence in the
electronic and digital communication
category for living up to the stations
slogan of being the rst to deliver
news and public service to Filipinos
through the world-wide web.
In celebration of its 25
th
year in the
broadcasting industry, ABS-CBNs AM
radio station re-launched its ofcial
website DZMM.com.ph to better pro-
vide news and public service to even
more Filipinos, extending its reach to
more netizens and global Pinoys. From
717,476 unique visits in the old website
from October 2010 to August 2011,
the new dzmm.com.ph hit to more than
three million unique visitors in the same
time period. Page views also jumped
more than 100 percent from 4.9 million
views to 9.9 million views.
DZMM also received an Award of
Excellence for its annual fun run for
a cause, Takbo Para sa Karunungan
Year 2012. More than 4,000 runners
turned up for the event, which was
staged by DZMM for the 13
th
year
now, that enabled the AM station to
earn about P1 million from race kit
sales and sponsorships for the benet
of 75 select scholars from areas dev-
astated by the recent typhoons.
ABS-CBN Regional Network
Group (RNG) won an Award of Ex-
cellence for its Choose Philippines
campaign that was initially intended
to showcase new tourism discoveries
in the country and to enable and em-
power the audience to share their sto-
ries and experiences of their journeys.
Choose Philippines then evolved into
an online advocacy for Filipinos to
express their love for a better country.
Since it went live last April 2011 to
Aug. 2012, the websites page views
had reached about 2.4 million total
page views with 791,272 unique visi-
tors. Visits also averaged to 57,470
a month. Its campaign Piliin Mo
Ang Pilipinas, with a popular theme
song of the same title sung by An-
geline Quinto and Vincent Bueno,
was widely recognized by Filipinos
worldwide. Even Department of Tour-
ism Secretary Mon Jimenez asked
Choose Philippines to help the DOT
in their new Its More Fun in the
Philippines tourism campaign.
ABS-CBN Corporate Communi-
cations won an Award of Excellence
for its online competition Kapamilya
Hottie 2012 among its employees
to promote healthy living and at the
same time increase awareness and
drive trafc to its employee intranet
site called e-Frequency. The compa-
ny-wide contest saw the participation
of 16 hot female and male contestants
from various ABS-CBN divisions and
subsidiaries and successfully gener-
ated heightened interest among its
internal publics. Through the contest,
the intranet site hit a record high of
17,997 hits for 2012 or a 38 percent
increase from 2011s average hits of
13,056. It also created a virtual com-
munity internally as it sparked ABS-
CBN employees to initiate their own
campaigns to support their bets.
ABS-CBN Creative Communica-
tions Management won an Award of
Excellence for the companys sum-
mer station ID Pinoy Summer Da
Best Forever, that highlighted the
networks beliefs and values and
afrmed its role as responsible and
inuential media entity. The Pinoy
Summer Da Best Forever gener-
ated positive feedback and created a
viral hype urging Filipinos to create
and upload their own versions of the
station ID.
Lastly, ABS-CBNs tribute to the
Philippine Comedy King, Sala-
mat, Tito Dolphy, won a Finalist
award. The event marked the rst
public viewing of the comedy icons
remains and a necrological service
that looked back on his legacy as
an entertainer and a Kapamilya. It
instantly harnessed the companys
people and resources in just 12 hours
and brought together Dolphys fam-
ily, friends, colleagues, and even
competing TV networks and media
organizations. The event drew over
6,000 fans and was carried out on
short notice with no glitches.
Overall, ABS-CBN is the most
awarded TV network in this years
Philippine Quill Awards with eight
awards compared to TV5 with three
and GMA7 with only one.
The annual gathering of the coun-
trys top business executives was
hosted by ANC anchors Ron Cruz
and Melissa Gecolea. Pilipinas Got
Talent 3 grand nalist El Gamma
Penumbra opened the program with
their well-applauded shadow theater
performance of Choose Philippines
theme song Piliin ang Pilipinas
while The X Factor Philippines -
nalist Daddys Home serenaded the
crowd halfway of the show with their
soulful renditions of Against All
Odds and I Believe I can Fly.
The prestigious Philippine Quill
Award is being given by the Interna-
tional Association of Business Com-
municators (IABC) Philippines and is
awarded to communications programs
and tools that exhibit clear objectives
and strategies, creative executions and
measurable benets. It is considered
to be the countrys most prestigious
and relevant award for business com-
munications programs.
IABC is a global network of more
than 14,000 business communication
professionals in over 60 countries.
The Philippines is the rst IABC
chapter outside North America.
ABS-CBN most awarded in Quill Awards
in big lmfest entry
BONG, JUDAY, VIC
than the rivalries and show biz
politics that is agrant around
us. Their utmost concern is to
make the movie into something
that will give them pride and
honor because it helps uplift the
movie industry. This Christmas
season, this movie is one such
example.
Not to be missed is the
heavyweight support cast in
the movie led by Wally Bay-
ola, Jose Manalo, Sam Pinto,
Gwen Zamora, Aiza Seguer-
ra, John Lapus, child stars
Jillian Ward and Ryzza Mae
Dizon, Yassi Pressman, Jolo
Revilla, Oyo Boy Sotto, Ruby
Rodriguez, Amy Perez, Bar-
bie Forteza, Alden Richards,
and Anton Revilla.
Screenplay by Bibeth Or-
teza and Jermyn Aven Jacob,
the story of Si Agimat, Si En-
teng Kabisote, at Si Ako begins
with the establishment of the
three different worlds, bound
to meet for an adventure like
no otherthe humble family-
oriented Enteng Kabisote (Vic
Sotto), a low-prole techni-
cian married to the beautiful
Fairy Princess of Encantasia,
Faye (Gwen Zamora); Agimat
(Ramon Bong Revilla, Jr.),
the brave village warrior hero
of Amuleto; and the high tech-
yuppie Kingdom of Diwatara
ruled by Princess Angelina Ka-
linisan Orteza (Judy Ann San-
tos) also known as AKO, where
she leads an environmental ad-
vocacy organization.
From the initial install-
ment Si Agimat at Si Enteng
Kabisote in 2010, the friend-
ship and partnership of Enteng
and Agimat continues in 2012.
From an eligible bachelor, Agi-
mat now strives to apply all
his learnings from Enteng and
Faye as he himself tries to start
his own family with wife, also
an Amuleto warrior, Samara
(Sam Pinto). The fun levels up
as Aiza Seguerra brings An-
gelina and her comic modern
Fairy sidekicks Pink Kapre Che
(John Lapus), Winged Horse
Sol (Yassi Pressman) and com-
puter-wiz dwarf Chichay (Ryz-
za Mae Dizon), into the lives of
the Kabisotes and the Amuleto
couple.
As the fun triples, so is the
adventure and thrill as the lead-
ers are confronted with high-
tech villains from out of their
worlds: Cannibal tribes of the
Tokatoks and lthy alien mon-
sters. Witness unparalleled bat-
tle stunts set in the Philippines
never-before-seen destinations
as Agimat, equipped with his
one-of-a-kind sword; Enteng
and his comic ghting style;
and Princess Angelina, in her
mystical bird alter ego; win the
battle of good against evil.
All Enteng movies as it
has always been known, val-
ues family, marriage, friend-
ship, responsibility, forgive-
ness, love and respect and the
protection of the one and only
Mother Earth. Si Agimat, Si
Enteng Kabisote at Si Ako, is
a rollercoaster ride of drama,
action, magic, visual effects,
production design, cinematog-
raphy and an unlimited fun and
laughter for everyone.
Dont miss it starting on Dec.
25 at your favorite theater.
Alfred Vargas plays
Andres Bonifacio
Quezon City Councilor and
award-winning actor Alfred
Vargas portrays one of the
most controversial and power-
ful icons in Philippine history
in his lm Supremo, an epic
drama adaptation of the life of
Andres Bonifacio.
Here, Vargas shows a dif-
ferent side of Bonifacio, who
not just led the Philippine revo-
lution in 1896, but who also
showed how unusually devoted
he was as a husband, brother,
and friend. Vargas is both the
producer and main actor of the
lm. I was compelled to make
the lm because I was really
struck by Andres Bonifacios
courage and resilience at the
time when everything seemed
hopeless for the country, says
Vargas. He is my personal
hero and I want the Filipinos
to identify with him and real-
ize his greatest contribution to
our country. His relevance to
his countrymen continues to be
unmatched today.
Vargas, who nished AB
Management Economics from
the Ateneo de Manila Univer-
sity, grew up enjoying books
on Philippine history. In fact,
he has portrayed several Fili-
pino heroes himself, assuming
the Lapu-Lapu and Diego Sil-
ang roles in stage productions,
and being tapped to play the
role of Andres Bonifacio in the
lm Ang Paglilitis ni Andres
Bonifacio, directed by highly-
acclaimed director Mario O
Hara. He claims that his pas-
sion for donning character
roles stemmed from his Tan-
ghalang Ateneo days, where
he portrayed a multitude of
roles, from Shakespearean to
Brechtian to Rolando Tinio
characters. His stint in the the-
ater group also exposed him to
stage production, lmmaking,
and events management. Even-
tually, he became a model and
an actor, appearing in several
top-rating television series and
hit lms, and later as a movie
actor, winning several presti-
gious awards like the Break-
through Performance by an
Actor for Bridal Shower from
the Golden Screen Awards,
Best Actor for Colorum from
the MTRCB Awards and earn-
ing nominations as Best Actor
for both Teoriya and Colorum
lms from Gawad Urian. With
the growth and popularity of in-
dependent lms in the country,
Vargas realized the potential of
producing lms rich in history
and signicantly appealing to
the Filipino audience, thus, the
birth of Supremo.
Renowned TV and lm di-
rector Richard Somes, who
also directed Yanggaw and
Corazon Ang Unang Aswang,
was Vargas choice director for
Supremo. The lm is produced
by Alternative Vision Cinema,
the production outt estab-
lished by Alfred Vargas and
his brother, PM Vargas. AV
Cinema co-produced Busong
(Palawan Fate), which was in-
cluded in the Cinemalaya roster
of lms last year, premiered in
Cannes last May 2011, and gar-
nered several recognition from
different lm festivals all over
the world.
Supremo is set to premiere
on Nov. 30, Friday, 7 p.m. at
SM Fairview Cinema 5 and 6.
The theatrical release will be
on Dec. 5, Wednesday, in SM
Cinemas nationwide. The lm
is open for school-viewing in
both public and private schools
and universities nationwide.
For special booking arrange-
ments and for more informa-
tion, contact Sonny Guingab
(0917) 322-5903 or email son-
nyguingab@gmail.com.
Si Agimat, Si Enteng Kabisote
at Si Akofantasy action lm
starring Bong Revilla Jr., Judy
Ann Santos and Vic Sotto
Alfred Vargas as Andres Bonifacio
CYAN MAGENTA YELLOW BLACK
MST Classifed Ads section requires a Two (2) day
CUT-OFF PERIOD on all ITBs, BID BULLETIN,
NOTICES and REOIs prior publication date(s).
Republic of the Philippines
KAGAWARAN NG PAGAWAIN AT LANSANGANG PAMBAYAN
DAVAO CITY SUB-DISTRICT ENGINEERING OFFICE
Tugbok, Lungsod ng Dabaw
INVITATION TO BID
1. The Department of Public Works and Highways (DPWH), Davao City Sub-District Engineering Offce, through
various projects intends toapply thefollowingsumtopayments under correspondingcontracts listedhereunder.
Bids received in excess of the Approved Budget for the Contract (ABC) shall be automatically rejected at bid
opening.
1. Contract ID : 12LH-0060
Contract Name/Location : Road Upgrading (gravel to paved) of Inawayan-Baracatan
Road, Toril, Davao City Km. 1539+110-Km.1539+285
Scope of Works : Pipe Culverts and Drain Excavation, Embankment from
Roadway Excavation, Surplus Common Excavation,
Subgrade Preparation, Aggregate Subbase Course, Gravel
Surface Course (Uncrushed), PCC Pavement (Plain) 230mm
thk., Grouted Riprap (Class A)
Source of funds : Regular Infra Savings CY 2012
Approved Budget for the Contract : P 3,702,125.28
Duration : 30 calendar days
2. Contract ID : 12LH-0061
Contract Name/Location : Road Upgrading (gravel to paved) of Inawayan-Baracatan
Road, Toril, Davao City Km. 1538+770-Km.1539+110
Scope of Works : Removal of Existing Driveway, Pipe Culverts and Drain
Excavation, Embankment from Roadway Excavation, Surplus
Common Excavation, Subgrade Preparation, Aggregate
Subbase Course, Gravel Surface Course (Uncrushed),
PCC Pavement (Plain) 230mm thk., Pipe Culvert, 910mm,
Removing, Clearing, Stockpiling Salvaged Culvert Pipe
(24 dia)- 610mm., Removing, Clearing, Relaying Salvaged
Culvert Pipe (36 dia)- 910mm. Grouted Riprap (Class A),
Concrete Driveway (0.10m thk)
Source of funds : Regular Infra Savings CY 2012
Approved Budget for the Contract : P 6,898,056.96
Duration : 55 calendar days
3. Contract ID : 12LH-0062
Contract Name/Location : Construction of Birthing Facility at Lower Marahan, Marilog District,
Davao City
Scope of Works : Structure Excavation, Embankment (Earthfll/Backfll), Footing, Column,
Floor Slab, Roof Beam, Tie Beam, Wall Footing, Concrete Ramps,
Concrete Stairs, Concrete Counter, Plumbing Works, Ceiling, Drywall
Partitions, Cabinets, Counter Desk, Glass Door Hardwares including
Installation, Window Hardwares including Installation, Steel Door
Hardwares including Installation, PVC Door, Prepainted Metal Sheets,
Tile Works, Cement Plaster Finish, Painting Works, Conduits, Boxes and
Fittings, Wires and Wiring Devices, Panel Board and Lighting Fixtures,
Masonry Works, Structural Metal, Septic Vault, Removal of Trees
Approved Budget for the Contract : P 2,000,000.00
Duration : 60 calendar days
4. Contract ID : 12LH-0063
Contract Name/Location : Construction of Birthing Facility at Baguio Health Center, Baguio Proper,
Baguio District, Davao City
Scope of Works : Structure Excavation, Embankment (Earthfll/Backfll), Footing, Column,
Floor Slab, Roof Beam, Tie Beam, Wall Footing, Concrete Ramps,
Concrete Stairs, Concrete Counter, Plumbing Works, Ceiling, Drywall
Partitions, Cabinets, Counter Desk, Glass Door Hardwares including
Installation, Window Hardwares including Installation, Steel Door
Hardwares including Installation, PVC Door, Prepainted Metal Sheets,
Tile Works, Cement Plaster Finish, Painting Works, Conduits, Boxes and
Fittings, Wires and Wiring Devices, Panel Board and Lighting Fixtures,
Masonry Works, Structural Metal, Septic Vault, Removal of Trees
Approved Budget for the Contract : P 2,500,000.00
Duration : 60 calendar days
5. Contract ID : 12LH-0064
Contract Name/Location : Completion of Birthing Facility at Calinan Health Center,
Calinan Poblacion, Calinan District, Davao City
Scope of Works : Concrete Counter, Plumbing Works, Ceiling, Drywall
Partitions, Cabinets, Counter Desk, Glass Door Hardwares
including Installation, Window Hardwares including
Installation, Wooden Door Hardwares including Installation,
PVC Door, Prepainted Metal Sheets, Tile Works, Painting
Works, Conduits, Boxes and Fittings, Wires and Wiring
Devices, Panel Board and Lighting Fixtures, Septic Vault,
Removal of Trees
Approved Budget for the Contract : P 2,500,000.00
Duration : 60 calendar days
6. Contract ID : 12LH-0065
Contract Name/Location : Construction of Birthing Facility at Mintal Health Center,
Tugbok District, Davao City
Scope of Works : Structure Excavation, Embankment (Earthfill/Backfill),
Footing, Column, Floor Slab, Roof Beam, Tie Beam, Wall
Footing, Concrete Ramps, Concrete Stairs, Concrete
Counter, Plumbing Works, Ceiling, Drywall Partitions,
Cabinets, Counter Desk, Glass Door Hardwares including
Installation, Window Hardwares including Installation, Steel
Door Hardwares including Installation, PVC Door, Prepainted
Metal Sheets, Tile Works, Cement Plaster Finish, Painting
Works, Conduits, Boxes and Fittings, Wires and Wiring
Devices, Panel Board and Lighting Fixtures, Masonry Works,
Structural Metal, Septic Vault, Removal of Trees
Approved Budget for the Contract : P 2,500,000.00
Duration : 60 calendar days
7. Contract ID : 12LH-0066
Contract Name/Location : Renovation of Existing TBDOTS Facility at Toril Health Center, Toril
Poblacion, Toril District, Davao City
Scope of Works : Concrete Counter, Plumbing Works, Ceiling, Drywall Partitions, Cabinets,
Counter Desk, Glass Door Hardwares including Installation, Window
Hardwares including Installation, Wooden Door Hardwares including
Installation, Prepainted Metal Sheets, Tile Works, Cement Plaster Finsih,
Painting Works, Conduits, Boxes and Fittings, Wires and Wiring Devices,
Panel Boards and Lighting Fixtures, Structural Metal, Removal of Trees
Approved Budget for the Contract : P 2,500,000.00
Duration : 60 calendar days
8. Contract ID : 12LH-0067
Contract Name/Location : Repair/Maintenance of Bureau of Plants and Industry, Bago Oshiro,
Tugbok District, Davao City
Scope of Works : Removal of Salvaged/Damaged Materials, Masonry Works, Plumbing,
Carpentry and Joinery Works, Door and Windows, Ceramic Tiles (Floor),
Ceramic Tiles (Wall), Cement Plaster Finish, Painting of Ceiling and
Walls, Painting (Corrugated Metal Roofng), Replacement of Electrical
Wire, Steel Grills and Louver
Approved Budget for the Contract : P 1,499,982.86
Source of funds : RA-Fund 101-General Fund
Duration : 60 calendar days
9. Contract ID : 12LH-0068
Contract Name/Location : Repair/Maintenance of Philippin Public Safety College, Mintal, Davao City
Scope of Works : Removal of Salvaged/Damaged Materials, Carpentry and Joinery Works
(ceiling), Carpentry and Joinery Works (wall), Door and Windows,
Prepainted Metal Sheets, Painting of Ceiling, Downspout, Replacement
of Electrical Wiring
Approved Budget for the Contract : P 999,952.69
Source of funds : RA-Fund 101-General Fund
Duration : 60 calendar days
2. TheDepartment of PublicWorksandHighways(DPWH), DavaoCitySub-District EngineeringOffce, nowinvites
bids for the above-mentioned contracts. Bidders should have completed within ten (10) years fromthe date of
submission and receipt of bids, a contract similar to the project, the description of an eligible bidder is contained
in the Bidding Documents, particularly, in section II, Instruction to Bidders.
3. Biddingwill beconductedthroughopencompetitivebiddingproceduresusingnon-discretionarypass/fail criterion
as specifed in the IRR of RA9184, otherwise known as The Government Procurement Act.
BiddingisrestrictedtoFilipinoCitizens/soleproprietorships, partnershipor organizationswithat least seventy-fve
(75%) interest or outstanding capital stock belonging to citizens of the Philippines.
4. Interested Bidders may obtain further information fromthe Department of Public Works and Highways, Davao
City Sub-District Engineering Offce, and inspect at the address given below from Monday to Friday between
8:00 a.m. to 5:00 p.m.
5. A complete set of Bidding Documents maybe purchased by interested bidders from the address below and
upon payments of a non-refundable fee for the bidding documents the amount of P5,000.00 for Contract IDNo.
12LH0060, 12LH0062 to 12LH0067, P10,000.00 for Contract IDNo. 12LH0061 and P1,000.00 for Contract ID
No. 12LH0068 fromNovember 20, 2012 December 11, 2012, until 10:00 a.m.
It may also be downloaded free of charge from the www.dpwh.gov.ph and Philgeps websites, provided that
bidders shall pay the fee for the bidding documents not later than the submission of bids.
6. The Department of Public Works and Highways (DPWH), Davao City Sub-District Engineering Offce, will hold
a Pre-bid conference on November 27, 2012 at the DPWHConference Room, Tirol St., Tugbok, Davao City at
10:00 a.m., which shall be open only to all interested parties who have purchased the bidding documents.
7. Bids must be delivered on or before 10:A.M. of December 11, 2012 at the DPWH Conference Room, Tirol St.,
Tugbok, Davao City. All bids must be accompanied by a bid security in any acceptable forms and in the amount
stated in ITB Clause 18.
Bids will be opened at 2:00 P.M. at the same day in the presence of the bidders representatives who choose to
attend at the address below. Late bids will not be accepted.
8. The Department of Public Works and Highways (DPWH) Davao City Sub-District Engineering Offce, reserves
the right to accept or reject any bid to annul the bidding process and to reject all bids at any time prior to contract
award without thereby incurring any liability to the affected bidders or bidders.
9. For further information, please refer to:
Reynaldo B. Labindao- Head, BAC Secretariat
Department of Public Works and Highways
Davao City Sub-District Engineering Offce
Tirol St., Tugbok, Davao City
Tel. No. : (082) 293-1232
Email : dpwh_tugbok@yahoo.com
Approved by:
(Sgd.) MONAROGONGD. AMEROL
OIC-Assistant District Engineer
BAC Chairman
Noted:
(Sgd.) GENE P. LOZANO
Offcer-In-Charge
(MST-Nov. 22, 2012)
CYAN MAGENTA YELLOW BLACK
Manila
Standard
TODAY
CYAN MAGENTA YELLOW BLACK CYAN MAGENTA YELLOW BLACK
Republic of the Philippines
ENERGY REGULATORY COMMISSION
Pacifc Center Building
San Miguel Ave., Pasig City
IN THE MATTER OF THE JOINT APPLICATION
FOR THE APPROVAL OF THE POWER PURCHASE
AND SALE AGREEMENT (PPSA) ENTERED INTO
BY AND BETWEEN (I) EACH OF DON ORESTES
ROMUALDEZ ELECTRIC COOPERATIVE, INC.
(DORELCO), LEYTEIV ELECTRIC COOPERATIVE,
INC. (LEYECO IV), AND SAMAR II ELECTRIC
COOPERATIVE, INC. (SAMELCO II),AND (II)
GNPOWER MARIVELES COAL PLANT LTD. CO.
(GMCP)
ERC Case No.________________
DON ORESTES ROMUALDEZ ELECTRIC
COOPERATIVE, INC. (DORELCO), LEYTE IV
ELECTRIC COOPERATIVE, INC. (LEYECO IV),
AND SAMAR II ELECTRIC COOPERATIVE,
INC. (SAMELCO II), AND GNPOWER MARIVELES
COAL PLANT LTD. CO. (GMCP)
Applicants.
x--------------------------------------------------------------------x
JOINT APPLICATION
ApplicantsDON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO), LEYTE IV
ELECTRIC COOPERATIVE, INC. (LEYECO IV)AND SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO
II), (collectively, Applicant DUs )and GNPOWER MARIVELES COAL PLANT LTD. CO. ( GMCP ),by their
respective counsels, respectfully state:
1. Applicant DUs are individually authorized to distribute and provide electricity services to their member-consumers in
their respective franchise areas while GMCP is a private entity engaged in the business of power generation.
a. DORELCOis an electric cooperative duly organized and existing under and by virtue of the laws of the Republic
of the Philippines with principal offce address in San Roque, Tolosa, Leyte. DORELCO is the duly authorized
operator of the electric light and power system in the municipalities of Abuyog, Burauen, Dagami, Dulag, Javier,
Julita, Lapaz, Macarthur, Mahaplag, Mayorga, Tabontabon, Tanauan, Tolosa, all in the province of Leyte
b. LEYECO IV is an electric cooperative duly organized and existing under and by virtue of the laws of the
Republic of the Philippines with principal offce address in Brgy. Lamak, Hilongos, Leyte. LEYECO IV is
the duly authorized operator of the electric light and power system in the municipalities of Baybay City,
Inopacan, Hindang, Hilongos, Bato and Malatom, all in the province of Leyte.
c. SAMELCO II is an electric cooperative duly organized and existing under and by virtue of the laws of the
Republic of the Philippines with principal offce address in Brgy. Arado, Paranas, Samar. SAMELCO II is the
duly authorized operator of the electric light and power system in the municipalities of Catbalogan City, Jiabong,
Motiong, Paranas, San Sebastian, Hinabangan, Calbiga, Pinabacdao, Villareal, Talalora, Sta Rita, Basey,
Marabut, Daram, San Jose De Buan and Zumarraga, all in the province of Samar.
2. GMCP is a duly registered limited partnership organized and existing under and by virtue of thelaws of the
Republic of the Philippines, engaged in the business of power generation, and with principal offce address
at 1905 Orient Square Building, Don Francisco Ortigas, Jr. Road, Ortigas Center, Pasig City. A copy of the
Certifcate of Registration andAmended Articles of Partnership of GMCPis attached hereto as Annex A .
3. GMCP owns and will operate a 2x300MW clean pulverized coal-fred electric power generation facility in
Mariveles, Bataan, (Facility), which is nearing completion of construction, for the purpose of supplying its
customers with environmentally clean electric power commencing in early 2013.
4. In view of the anticipated insuffcient supply of power in 2013 as projected by the Department of Energy ( DOE )
and the expiration of the power supply contracts that were entered into by the Applicant DUs,the Applicant
DUsstarted their solicitation process of acquiring a long-term power supply contracts in order to provide a
continuous and reliable source of power to their member-consumers.
5. After a careful evaluation of the proposals, the respective managements and Boards of Directors (of Applicant
DUs declared the proposal of GMCP acceptable and recommended the awarding of the Power Purchase
and Sale Agreement ( PPSA ) to GMCP. A copy of the Sworn Statements ofDORELCO, LEYECO IV and
SAMELCO IIdetailing their respective selection processesis attached hereto as Annex B , B-1 and B-2
respectively.
6. As a result, each of the Applicant DUs entered into a PPSAwith GMCP(attached as Annex C , C-1 and
C-2 ) on 5 November 2012whereinGMCP agrees to provide the power requirements of individual Applicant
DUs commencing in early 2013.
7. Applicant DUsand GMCP now jointly seek the Energy Regulatory Commissions (ERC) approval of the subject
PPSAs that they have entered into.
8. In further support of the foregoing Joint Application and in compliance with the fling requirements of this
Honorable Commission as embodied in Rule 20(B), Section 2 of the ERCs Rules of Practices and Procedures
as promulgated by Resolution No. 38, Series of 2006, Applicant DUsand GMCPhave attached hereto the
following:
Annex Document
D GMCP Environmental Compliance Certifcate
E GMCP Provisional Certifcate of Compliance
F GMCP Board of Investment (BOI) Certifcate of Registration
G Details regarding GMCPs Fuel
H Details regarding transmission projects or grid connection projects necessary to complement the proposed
generation capacity including the identifcation of the parties
I Technical Description of the Facility
J
DOE Certifcate of Accreditation for GMCP and latest Power Development Plan (2009-2030) showing GMCP
as a Committed Project for early 2013
K
Details regarding the load forecast projections in accordance with the latest Distribution Development Plan
(DDP) of
K - DORELCO
K-1 - LEYECO IV
K-2 - SAMELCO II
and the variability of those projections over the proposed contractual period.
9. The GMCP Purchased Power Rate (Contract Price) is the price in US Dollars (as adjusted in accordance
with Schedule 1 of the PPSAs) to be paid individually by theApplicant DUs to GMCP for the purchase of their
respective electric capacities specifed in the subjectPPSAs. The said Contract Price is comprised of the relevant
Capacity Fee and Energy Fee which may be paid in Philippine Pesos (PhP).
The Capacity Fee is the component of the Contract Price allocated to pay for the cost as well as the operations and
maintenance of the Facility and is designated as the Capacity Fee in Schedule 1 of the PPSAs as such may be
adjusted fromtime to time based on individualApplicant DUsCapacity Factor.
The Energy Fee, on the other hand, is the component of the Contract Price allocated to pay for the coal,
including Government Charges, designated as the Energy Fee in Schedule 1 of the PPSAs as adjusted from
time to time due to changes in the delivered price of coal.
Calculation of the Contract Price for a particular Billing Period will be:
Contract Price = Capacity Fee + Energy Fee
10. The rate determination of the subject PPSAs for Applicant DUsis provided below:
a. DORELCO Rate Analysis
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
2013
Average
Rate
(P/kWh)
Weighted
Average
Rate (kWh)
Supplier 1A 1,460,000 28.94% 4.2085
4.4694 Supplier 1B 3,585,462 71.06% 4.5756
TOTAL 5,045,462 100%
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
Resulting
Capacity
Factor (%)
2013
Average Rae
(P/kWh)
Weighted Average
Rate (kWh)
GMCP 1,460,000 28.94% 100% 3.9635
4.3985 Supplier 1B 3,585,462 71.06% 4.5756
TOTAL 5,045,462 100%
Rate
Reduction
(0.0709)
b. LEYECO IV Rate Analysis
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
2013
Average
Rate
(P/kWh)
Weighted
Average
Rate (kWh)
Supplier 1A 3,596,121 76.01% 4.2261
4.4862 Supplier 1B 1,135,184 23.99% 5.3101
TOTAL 4,731,306 100%
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
Resulting
Capacity
Factor
(%)
2013
Average Rae
(P/kWh)
Weighted Average
Rate (kWh)
GMCP 3,596,121 76.01% 98% 3.9950
4.3105 Supplier 1B 1,135,184 23.99% 5.3101
TOTAL 4,731,306 100%
Rate
Reduction
(0.1757)
c. SAMELCO II Rate Analysis
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
2013
Average
Rate
(P/kWh)
Weighted
Average
Rate (kWh)
Supplier 1A 3,638,562 70.12% 4.2124
4.4749 Supplier 1B 1,550,799 29.88% 5.0908
TOTAL 5,189,361 100%
Projected 2013 Average Monthly
Quantity (kWh)
Percent
Share
(%)
Resulting
Capacity
Factor
(%)
2013
Average Rate
(P/kWh)
Weighted Average
Rate (kWh)
GMCP 3,638,562 70.12% 99% 3.9799
4.3119 Supplier 1B 1,550,799 29.88% 5.0908
TOTAL 5,189,361 100%
Rate
Reduction
(0.1630)
Notes on the Rate Analyses:
1. Analyses and simulations are based on individual Applicant DUs projected 2013 hourly load
profle using growth from DDP.
2. Supplier 1A and 1Bs rates are based on NPCs Visayas Grid Time-Of-Use (TOU) Rate
including Deferred Accounting Adjustment (DAA) and Automatic Cost Adjustment.
3. GMCP rate is based on (i) Capacity Fee at Resulting Capacity Factor; (ii) November 14 coal
and shipping prices; (iii) November 1 - 14, 2012 FOREX; (iv) exclusive of VAT and Prompt
Payment Discount.
ALLEGATIONS IN FURTHER SUPPORT OF APPLICANTSJOINT PRAYER FOR THE IMMEDIATE ISSUANCE
OF A PROVISIONAL AUTHORITY
11. Applicant DUs and GMCP replead the above allegations in support of their prayer for the immediate issuance
of a provisional authority.
12. Under Rule 14 of the ERC Rules of Practice and Procedure, this Honorable Commission is authorized to issue
provisional authority or interimrelief prior to a fnal decision, provided that the facts warrant such remedy. The instant
application involves such facts warranting the issuance of such provisional authority.
The Applicants respectfully submit that the following facts and circumstances clearly warrant the issuance
by this Honorable Commission of a provisional authority or interim relief in the instant Joint Application. The
Applicants, therefore, are constrained to urgently request for a provisional approval pending the issuance of a
fnal order or decision in order to ensure the reliable and steady power supply in the DUsrespective franchise
areas by early 2013.
13. The operation by GMCP of the Facility is a concrete step in averting a power crisis that could hit the Luzon and
the Visayas grids by2013 onwards. In fact, as stated in a published news article, the DOE has urged distribution
utilities, large industrial and commercial users to help in facilitating investments in new capacity by frming
up and indicating their energy requirements and by signing up for bilateral contracts with power providers to
provide stable market. A copy of the said article is attached hereto as Annex L .
14. GMCP is one of the frst committed major projectssince 2001 that can support the additional capacity needed
by Luzon and Visayas regions.
15. Moreover, as shown in the Market Operations Update by the Wholesale Electricity Spot Market ( WESM ) held
on 15 February 2011 (Annex M ), numerous price spikes occurred, particularly during the frst half of the year,
due to the increased demand and tight supply condition in 2010.
16. It is worthy to note that the Commission has taken cognizant of the integration of the Luzon and Visayas Grids in
its Orders and Decisions on the applications of the Philippine Electricity Market Corporation (PEMC)(Annex
N). Moreover, the DOE has offcially declared the commercial operation of the WESM in the Visayas Grid and
its integration with the Luzon Grid in its Circular No. 2010-11-0012(Annex N-1). Further, in PEMCs letter to
GMCP dated August 6, 2012 (Annex N-2), it affrmed that:
(a) GMCP, as generator and Trading Participant from the Luzon grid, may be allowed to declare bilateral
contract quantities to a customer from the Visayas grid;and
(b) The transfer of energy via High Voltage Direct Current (HVDC) from Luzon to the Visayas grid and vice
versa shall not, in anyway, hinder the fnancial contract between Luzon suppliers and Visayas customers.
17. GMCP as it is frst in the market has achieved its fnancial closing and is now nearing the completion of the
construction of the Facility. Attached as Annex O are pictures showing the construction progress of the
Facility.
18. It is, therefore, in this context that Applicant DUs and GMCPrespectfully pray that a provisional authority be
immediately issued in order that there will be security of supply for the Applicant DUs and for GMCPto be able
to address the expected power shortfall in 2013.
19. Moreover, the early grant of a provisional authority is as important, if not more important, than the fnal approval
of the subject PPSAs, considering the timeliness involved before the start of the Facilitys commercial operations. At this
point, the immediate issuance of a provisional authority would be critical both to the project proponent and to the distribution
utilities, which have signed similar individual PPSAs considering the supply risk and resultant market price expected in the
event that GMCP fails to complete the regulatory requirements under its fnancing arrangements and the subject PPSAs.
20. It is also worth noting that the subject PPSAs are on the same terms and conditions as the PPSAs approved by the
Honorable Commission for GMCP and its fourteen (14) distribution utility customers.
21. If provisional approval is not granted, Applicant DUs will be constrained to source their power supply or additional
requirements from WESM, and said DUs and their consumers will be exposed to a bigger risk of the volatility of the rates in
the WESM, to the detriment and prejudice of the latter.
22. There is, therefore, an urgent need for the immediate issuance of a provisional authority of this Joint Application so that there
will be a continuous supply and no unnecessary disruption in the power supply of the Applicant DUs. The subject PPSAs
will enable the Applicant DUs and their end-users within theirrespective franchise areasto enjoy the competitive power rates
that GMCP has offered to the Applicant DUs and avoid being exposed to a bigger risk of the volatility of the rates in WESM.
23. Joint Applicants have agreed to execute an Interim Supply Agreement pending approval of the subject PPSAs and that the
interim supply shall commence as soon as GMCP is commercially available at the WESM and each of the Applicant DUs
existing supply agreements has expired.
24. The instant application is likewise being jointly fled byApplicant DUs and GMCP in line with the frst (1
st
) and ffth (5
th
)
WHEREAS clauses of the DOE Circular No. 2003-12-22 which state:
WHEREAS, Section 2 of the Republic Act No. 9136, also known as the Electric Power Industry
Reform Act of 2001 or EPIRA, declared as a policy of the State, among others, [t]o ensure the quality
reliability, security and affordability of the supply of electric power, (frst Whereas, Department of Energy
Circular No. 2003-12-11, Underscoring supplied.)
WHEREAS, pursuant to Section 23 of EPIRA, all distribution utilities, as designed in the law, SHALL
HAVE THE OBLIGATION TO SUPPLY ELECTRICITY IN THE LEAST COST MANNER TO ITS CAPTIVE
MARKET subject to the collection of retail rate duly approved by the Energy Regulatory Commission;
(ffth Whereas, ibid. Underscoring supplied.)
25. Moreover, Section 1 of the same Department Circular categorically mentions the avowed policy of the State that:
All distribution utilities must henceforth take cognizance and assume full responsibility to forecast, assure
and contract for the supply of electric power in their respective franchise areas to meet their obligations as a
distribution utility.(Underscoring supplied.)
26. By way of emphasis, Resolution No. 21, Series of 2005 of this Honorable Commission dated 19 October 2005 directs all
distribution utilities to enter into future bilateral power supply contract with power producers to be subjected to a review by
the Commission. (Underscoring supplied.)
27. Public welfare, the Luzon and Visayas-wide consumers in particular, necessity and interest demand the immediate approval
of the instant Joint Applicationas this will help meet the forecasted capacity shortage in the Luzon andVisayas Grids by
early 2013.
28. Applicant DUs and GMCP likewise manifest herein that they have complied with the pre-fling requirements mandated
under Rule 3, Section 4(e) of the Implementing Rules and Regulations of Republic Act No. 9013 as evidenced by the
certifcations issued by the various local government units legislative bodies within their respective franchise areas as well
as the affdavit of publication and the newspaper issue on which the instant Joint Application was published (Annex P ).
29. Finally, Applicant DUs and GMCP herein submit their respective Board Resolutions(Annexes Q , Q-1 , Q-2 and
R , R-1 , R-2 ) authorizing their respective signatories to execute their respective PPSAs and to fle the instant Joint
Application.
PRAYER
WHEREFORE, in view of all the foregoing, it is respectfully prayed of this Honorable Commission that pending hearing,
the POWER PURCHASE AND SALE AGREEMENTSdated 5 November 2012 entered into by and between (i) each of DON
ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC. (DORELCO),LEYTE IV ELECTRIC COOPERATIVE, INC.
(LEYECO IV),AND SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II) and (ii) GNPOWER MARIVELES COAL PLANT
LTD. CO. (GMCP) be PROVISIONALLY APPROVED and authorize the parties to implement said PPSAs upon the frst Billing
Period ending on February 25, 2013, and that after due notice and hearing, the same be made permanent, including the rates set
forth in paragraph 10 of this instant Joint Application.
Applicants likewise jointly pray for such other reliefs that may be just and equitable under the premises.
RESPECTFULLY SUBMITTED.
Pasig City.________________ 2012
THE LAWFIRM
OF
MANJARES & MANJARES
Counsel for the Applicant DUs
Suite 211 Jiao Building
No. 2 Timog Avenue, Quezon City
LOURDY D. TORRES AND MANUEL A. TORRES /
FRANCHESCA T. OVALLES
Counsel for the Applicant, GMCP
1905 The Orient Square Building
Don Francisco Ortigas, Jr. Road,
Ortigas Center, Pasig City
By:
NORBERTO F. MANJARES, JR
IBP OR No. 80032
15 February 2012 - Quezon City
PTR OR No. 4061703
15 February 2012 - Marikina City
ROLL NO. 14937
MCLE Compliance No. III-001340;
24 August 2010
By:
LOURDY D. TORRES
IBP OR NO. 826852
19 January 2012 - Quezon City
PTR OR NO. 6159440
19 January 2012 - Quezon City
ROLL NO. 13525
MCLE Compliance No. III-# 0013831
22 April 2010
By:
NORBERTO F. MANJARES, III
IBP OR No. 80033
15 February 2012 - Quezon City
PTR OR No. 4061704
15 February 2012 - Marikina City
ROLL NO. 41579
MCLE Compliance No. III-0019586;
10 December 2010
jcmanjaresiii@gmail.com
By:
MANUEL A. TORRES
IBP OR NO. 826852
19 January 2012 - Quezon City
PTR OR NO. 6159439
19 January 2012 - Quezon City
ROLL NO. 36340
MCLE Compliance No. III-# 0011324
07 April 2010
By:
FRANCHESCA T. OVALLES
IBP OR NO. 888758
08 February 2012 - Pasig City
PTR No. 2644294
05 January 2011 - Makati City
ROLL NO. 57346
MCLE Compliance No. III-0009225
08 March 2010
REPUBLIC OF THE PHILIPPINES )
) SS
VERIFICATION AND CERTIFICATION
I, EMMANUEL P. SAO,after having been duly sworn to in accordance with law, depose and say:
1. That I am the GENERAL MANAGER of DON ORESTES ROMUALDEZ ELECTRIC COOPERATIVE, INC.
(DORELCO) the applicant-electric cooperative in the above-entitled case;
2. That I have caused the preparation and fling of the foregoing JOINT APPLICATION;
3. That I have read the same and that all the allegations contained therein are true and correct of my own
personal knowledge and on the basis of authentic documents in my possession;
4. That I hereby certify that DORELCO has not commenced any other action or proceeding involving the same
issue/s with the Supreme Court, the Court of Appeals or any other tribunal or agency;
5. That to the best of my knowledge no such action or proceeding involving the same issue/s is pending with the
Supreme Court, the Court of Appeals or any other tribunal or agency;
6. That should I thereafter learn that an action or proceeding is pending with the Supreme Court, the Court of
Appeals or any other tribunal or agency, I hereby undertake to report such fact within fve (5) days with this
Honorable Commission.
FURTHER AFFIANT SAYETH NONE.
--------------------------------------------------------
EMMANUEL P. SAO
Affant
SUBSCRIBED AND SWORN to before me this __________ day of _______________________, affant exhibited to me
his __________________________ issued on ____________________ at __________________.
NOTARY PUBLIC
Doc. No. __________;
Page No. __________;
Book No. __________;
Series of 2012.
REPUBLIC OF THE PHILIPPINES )
) SS
VERIFICATION AND CERTIFICATION
I, HELEN B. YBAEZ, after having been duly sworn to in accordance with law, depose and say:
1. That I am the GENERAL MANAGER of LEYTE IV ELECTRIC COOPERATIVE, INC. (LEYECO IV) the
applicant-electric cooperative in the above-entitled case;
2. That I have caused the preparation and fling of the foregoing JOINT APPLICATION;
3. That I have read the same and that all the allegations contained therein are true and correct of my own
personal knowledge and on the basis of authentic documents in my possession;
4. That I hereby certify that LEYECO IV has not commenced any other action or proceeding involving the same
issue/s with the Supreme Court, the Court of Appeals or any other tribunal or agency;
5. That to the best of my knowledge no such action or proceeding involving the same issue/s is pending with the
Supreme Court, the Court of Appeals or any other tribunal or agency;
6. That should I thereafter learn that an action or proceeding is pending with the Supreme Court, the Court of
Appeals or any other tribunal or agency, I hereby undertake to report such fact within fve (5) days with this
Honorable Commission.
FURTHER AFFIANT SAYETH NONE.
--------------------------------------------------------
HELEN B. YBAEZ
Affant
SUBSCRIBED AND SWORN to before me this __________ day of _______________________, affant exhibited to me his
__________________________ issued on ____________________ at __________________.
NOTARY PUBLIC
Doc. No. __________;
Page No. __________;
Book No. __________;
Series of 2012.
REPUBLIC OF THE PHILIPPINES )
) SS
VERIFICATION AND CERTIFICATION
I, GERVACIO C. CHAVEZ, JR., after having been duly sworn to in accordance with law, depose and say:
1. That I am the OFFICER-IN-CHARGE of SAMAR II ELECTRIC COOPERATIVE, INC. (SAMELCO II) the applicant-
electric cooperative in the above-entitled case;
2. That I have caused the preparation and fling of the foregoing JOINT APPLICATION;
3. That I have read the same and that all the allegations contained therein are true and correct of my own personal
knowledge and on the basis of authentic documents in my possession;
4. That I hereby certify that SAMELCOII has not commenced any other action or proceeding involving the same issue/s with
the Supreme Court, the Court of Appeals or any other tribunal or agency;
5. That to the best of my knowledge no such action or proceeding involving the same issue/s is pending with the
Supreme Court, the Court of Appeals or any other tribunal or agency;
6. That should I thereafter learn that an action or proceeding is pending with the Supreme Court, the Court of Appeals or
any other tribunal or agency, I hereby undertake to report such fact within fve (5) days with this Honorable Commission.
FURTHER AFFIANT SAYETH NONE.
------------------------------------------------------------
GERVACIO C. CHAVEZ, JR.
Affant
SUBSCRIBED AND SWORN to before me this __________ day of _______________________, affant exhibited to me his
__________________________ issued on ____________________ at __________________.
NOTARY PUBLIC
Doc. No. __________;
Page No. __________;
Book No. __________;
Series of 2012.
REPUBLIC OF THE PHILIPPINES)
) SS
VERIFICATION AND CERTIFICATION
I, JOHN A. BECKERafter having been duly sworn in accordance with law, depose and say:
1. That I am the President and COO of GNPOWER MARIVELES COAL PLANT LTD. CO. (GMCP) the
applicant-company in the above-entitled case;
2. That I have caused the preparation and fling of the foregoing JOINT APPLICATION;
3. That I have read the same and that all the allegations contained therein are true and correct of my own personal
knowledge and on the basis of authentic documents in my possession;
4. That I hereby certify that GMCPhas not commenced any other action or proceeding involving the same issue/s with
the Supreme Court, the Court of Appeals or any other tribunal or agency;
5. That to the best of my knowledge no such action or proceeding involving the same issue/s is pending with the
Supreme Court, the Court of Appeals or any other tribunal or agency;
6. That should I thereafter learn that an action or proceeding is pending with the Supreme Court, the Court of Appeals or
any other tribunal or agency, I hereby undertake to report such fact within fve (5) days with this Honorable Commission.
FURTHER AFFIANT SAYETH NONE.
-----------------------------------------------------------
JOHN A. BECKER
Affant
SUBSCRIBEDAND SWORN to before me this ______ day of ____________________, affant exhibited to me his Passport No.
_________________________issued on ____________________ at _________________________________.
NOTARY PUBLIC
Doc. No. __________;
Page No. __________;
Book No. __________;
Series of 2012.
(MST-NOV. 22, 2012)
NOTI CE OF LOSS
Notice is hereby given
of the loss of TIMES
TRADING CO., INC.
Offcial Receipts No.
64636 and 77024.
Any transaction
entered thereof will
not be honored and is
considered void and
cancelled effective
January 03, 2012
and July 24, 2012
respectively.
(MST- NOV. 8,15 & 22, 2012)
NOTICE OF DISSOLUTION
The public is hereby notifed that TOPIA
Education Philippines, Inc., a corporation
organized and existing under Philippine laws
with address at the 16
th
foor of Robinsons
Summit Building 6783 Ayala Avenue, Makati
City, Philippines will be DISSOLVED through the
shortening of its corporate term in accordance
with Section 120 of the Corporation Code. The
dissolution will take effect upon approval by the
Securities and Exchange Commission of the
amendment made on the corporations Articles
of Incorporation.
(MST-Nov. 8,15 & 22, 2012)
NOTICE OF LOSS
of First Metro Investment
Corp. (FMIC) stock
certifcates of Romanita
G Arao:
Cert No. No of Shares
100008721 470
100014438 940
300004169 20
300004602 10
300007213 10
300008997 20
300010781 10
300012591 20
300014548 10
300016960 50
300018090 60
300021592 90
300023092 70
300028487 100
(MST-Nov. 8,15 & 22, 2012
NOTICE TO THE PUBLIC
This is to inform the public that:
Atty. Joshua L. Castro, CEO of Cirrus Global, Inc.
is the Authorized Representative of the Corporation in
POEA to do for and in behalf of the Corporation, and:
The following employee/s below is no longer
connected with Cirrus Global, Inc.
1. Beltran, Anna Katrina M. 10/17/12
2. Orbe, Richie Guil Caliao 11/15/12
All transactions entered by Ms. Beltran and Ms. Orbe
for and on behalf of the Company after the said date
shall no longer be honored by the Company.
(MST-Nov. 22, 2012)
Page Compositor: Diana Keyser Punzalan
NOVEMBER 22, 2012 THURSDAY
D1
Classifeds
ManilaStandardToday
adv.mst@gmail.com
R E M I N D E R
CYAN MAGENTA YELLOW BLACK
Classifeds
ManilaStandardToday adv.mst@gmail.com NOVEMBER 22, 2012 THURSDAY
D2
Page Compositor: Diana Keyser Punzalan
(MST-Nov. 22, 2012)
INVITATION TO BID FOR Improvement of Major Intersections along
MNR, Binalonan-Asingan-Sta Maria Road, KO 190+ (-247) KO 190+003,
Binalonan Section, Binalonan, Pangasinan
1. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan, through the
CY 2013 Regular Infra intends to apply the sum of P7,075,920.00 being
the Approved Budget for the Contract (ABC) to cover payments under the
contract for Improvement of Major Intersections along MNR, Binalonan-
Asingan-Sta Maria Road, KO 190+ (-247) - KO 190+003. Binalonan
Section, Binalonan, Pangasinan Contract ID No. 12A10194. Bids received
in excess of the ABC shall be automatically rejected at bid opening.
2. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan now invites
bids for Earthworks, Concreting. 328.00m x 3.65 m (Both sides) t=0.28
m,. Construction of Manhole and installation of 0.76 m diameter RCP,
Pavement Markings. Completion of the Works is required 80 c.d. The
prospective bidder must have an experience of having completed at least
One (1) contract that is similar to the contract to be bid, and whose value,
adjusted to current prices using the NSO consumer price indices, must
be at least ffty percent (50%) of the ABC to be bid.
3. Bidding will be conducted through open competitive bidding procedures
using non-discretionary pass/fail criterion as specifed in the Implementing
Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise
known as the Government Procurement Reform Act.
Bidding is restricted to Filipino citizen/sole proprietorships, partnerships,
or organizations with at least seventy fve (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
4. Interested bidders may obtain further information from Department of Public
Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce,
Tumana, Rosales, Pangasinan and inspect the Bidding Documents at the
address given below from 8:00 A.M. to 5:00 P.M.
5. A complete set of Bidding Documents may be purchased by interested
Bidders from the address below and upon payment of a non-refundable
fee for the Bidding Documents in the amount of P10,000.00.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website
of the Procuring Entity. Provided that bidders shall pay the fee for the
Bidding Documents not later than the submission of their bids.
6. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan wilI hold a Pre-
Bid Conference on November 26, 2012 at 10:00 A.M. at the Department of
Public Works and Highways (DPWH), Pangasinan 3rd District Engineering
Offce, Tumana, Rosales, Pangasinan which shall be open to all interested
parties
7. Bids must be delivered to the address below on or before December 7,
2012 at 10:00 A.M.. All bids must be accompanied a bid security in any
of the acceptable forms and in the amount stated in ITB Clause 18.
Bids will be opened in the presence of the bidders representatives who
choose to attend at the address below. Late bids shall not be accepted.
8. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan reserves the
right to accept or reject any bid, to annul the bidding process, and to reject
all bids at any time prior to contract award, without thereby incurring any
liability to the affected bidder or bidders:
9. For further Information, please refer to:
Head, BAC-Secretariat
DPWH, Pang. 3
rd
DEO, Tumana, Rosales, Pang.
Telephone No. (075) 541-5469
Fax No. (075) 582-3993
(Sgd.) EMMANUEL P. RIBOROSO
BAC-Chairman
Republic of the Philippines
Department of Public Works and Highways
Region I
Pangasinan 3
rd
District Engineering Offce
OFFICE OFTHE DISTRICT ENGINEER
Tumana, Rosales, Pangasinan
(MST-Nov. 22, 2012)
Republic of the Philippines
Department of Public Works and Highways
Region I
Pangasinan 3
rd
District Engineering Offce
OFFICE OFTHE DISTRICT ENGINEER
Tumana, Rosales, Pangasinan
INVITATlON TO BID FOR Widening of Villasis-Malasigui Road Km
175+506-Km 175+746, Villasis, Pangasinan
1. The Department of Public Works and Highways (DPWH), Pangasinan
3rd District Engineering Offce, Tumana, Rosales, Pangasinan, through
the FY 2013 Regular Infra intends to apply the sum of P 8,891,990.00
being the Approved Budget for the Contract (ABC) to cover payments
under the contract for Widening of Villasis-Malasigui Road, Km
175+506-Km175+746 Contract ID No. 12AI0195. Bids received in
excess of the ABC shall be automatically rejected at bid opening.
2. The Department of Public Works and Highways (DPWH), Pangasinan
3rd District Engineering Offce, Tumana, Rosales, Pangasinan now
invites bids for Widening of road, Additional one lane both sides
(PCCP,w=3.65m). Completion of the Works is required 60 c.d. The
prospective bidder must have an experience of having completed
at least One (I) contract that is similar to the contract to be bid, and
whose value, adjusted to current prices using the NSO consumer price
indices, must be at least ffty percent (50%) of the ABC to be bid.
3. Bidding will be conducted through open competitive bidding
procedures using non-discretionary pass/fail criterion as specifed in
the Implementing Rules and Regulations (lRR) of Republic Act 9184
(RA 9184), otherwise known as the Government Procurement Reform
Act.
Bidding is restricted to Filipino citizen/sole proprietorships, partnerships,
or organizations with at least seventy fve (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
4. Interested bidders may obtain further information from Department
of Public Works and Highways (DPWH), Pangasinan 3
rd
District
Engineering Offce, Tumana, Rosales, Pangasinan and inspect the
Bidding Documents at the address given below from 8:00 A.M. to 5:00
P.M.
5. A complete set of Bidding Documents may be purchased by interested
Bidders from the address below and upon payment of a non-refundable
fee for the Bidding Documents in the amount of P10,000.00.
It may also be downloaded free of charge from the website of the
Philippine Government Electronic Procurement System (PhilGEPS)
and the website of the Procuring Entity. Provided that bidders shall
pay the fee for the Bidding Documents not later than the submission
of their bids.
6. The Department of Public Works and Highways (DPWH), Pangasinan
3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan will hold
a Pre-Bid Conference on November 26, 2012 at 10:00 A.M. at the
Department of Public Works and Highways (DPWH), Pangasinan 3rd
District Engineering Offce, Tumana, Rosales, Pangasinan which shall
be open to all interested parties
7. Bids must be delivered to the address below on or before December 7,
2012 at 10:00 A.M.. All bids must be accompanied a bid security in any of
the acceptable forms and in the amount stated in ITB Clause 18.
Bids will be opened in the presence of the bidders representatives
who choose to attend at the address below. Late bids shall not be
accepted.
8. The Department of Public Works and Highways (DPWH), Pangasinan
3
rd
District Engineering Offce, Tumana, Rosales, Pangasinan reserves
the right to accept or reject any bid, to annul the bidding process, and
to reject all bids at any time prior to contract award, without thereby
incurring any liability to the affected bidder or bidders.
9. For further Information, please refer to:
Head, BAC-Secretariat
DPWH, Pang. 3rd DEO, Tumana, Rosales, Pang.
Telephone No. (075) 541-5469
Fax No. (075) 582-3993
(Sgd.) EMMANUEL P. RIBOROSO
BAC-Chairman
Republic of the Philippines
Department of Public Works and Highways
Region I
Pangasinan 3
rd
District Engineering Offce
OFFICE OFTHE DISTRICT ENGINEER
Tumana, Rosales, Pangasinan
(MST-Nov. 22, 2012)
INVITATION TO BID FOR Improvement of Maj or Intersecti ons al ong MNR,
Mangaldan-Manaoag-Binalonan Road, KO 190+(-486) - KO 190+004, Binalonan
Section, Binalonan, Pangasinan
1. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District
Engineering Offce. Tumana, Rosales, Pangasinan, through the CY 2013 Regular
Infra intends to apply the sum of P13,725,100.00 being the Approved Budget
for the Contract (ABC) to cover payments under the contract for Improvement
of Major Intersections along MNR, Mangaldan-Manaoag-Binalonan Road, KO
190+(-486) - KO 190+004. Hinalonan Section, Binalonan, Pangasinan Contract
ID No. 12A10193. Bids received in excess of the ARC shall be automatically
rejected at bid opening.
2. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana. Rosales, Pangasinan now invites bids for
Earthworks, Concreting, 585.00m x 3.65 m(Both sides) t-0.28 m, , Construction
of Manhole and installation of 0.91 m diameter RCP, Construction of Slope
Protection (Stone Masonry), Pavement Markings. Completion of the Works
is required 95 c.d. The prospective bidder must have an experience of having
completed at least One (1) contract that is similar to the contract to be bid, and
whose value, adjusted to current prices using the NSO consumer price indices,
must be at least ffty percent (50%) of the ABC to be bid.
3. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules and
Regulations (lRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizen/sole proprietorships, partnerships, or
organizations with at least seventy fve (75%) interest or outstanding capital
stock belonging to citizens of the Philippines.
4. Interested bidders may obtain further information from Department of Public
Works and Highways (DPWH), Pangasinan 3rd District Engineering Offce,
Tumana, Rosales, Pangasinan and inspect the Bidding Documents at the address
given below from 8:00 A.M. to 5:00 P.M.
5. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the Bidding
Documents in the amount of P25,000.00.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of
the Procuring Entity. Provided that bidders shall pay the fee for the Bidding
Documents not later than the submission of their bids.
6. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District
Engineering Offce, Tumana, Rosales, Pangasinan will hold a Pre-Bid Conference
on November 26, 2012 at 10:00 A.M. at the Department of Public Works and
Highways (DPWH), Pangasinan 3
rd
District Engineering Offce, Tumana, Rosales,
Pangasinan which shall be open to all interested parties
7. Bids must be delivered to the address below on or before December 7, 2012 at
10:00 A.M .. All bids must be accompanied a bid security in any of the acceptable
forms and in the amount stated in ITS Clause 18.
Bids will be opened in the presence of the bidders representatives who choose
to attend at the address below. Late bids shall not be accepted.
8. The Department of Public Works and Highways (DPWH), Pangasinan 3
rd
District
Engineering Offce, Tumana. Rosales, Pangasinan reserves the right to accept
or reject any bid, to annul the bidding process, and to reject all bids at any time
prior to contract award, without thereby incurring any liability to the affected
bidder or bidders.
9. For further Information, please refer to:
Head, BAC-Secretariat
DPWH, Pang. 3rd DEO, Tumana, Rosales, Pang.
Telephone No. (02) 541-5469
Fax No. (075) 582-3993
(Sgd.) EMMANUEL P. RIBOROSO
BAC-Chairman
Republic of the Philippines
Department of Public Works and Highways
Caraga Region
OFFICE OF THE DISTRICT ENGINEER
Dinagat Islands District Engineering Offce
San Jose, Dinagat Islands
(MST-Nov. 22, 2012)
The Bids and Award Committee (BAC) of the Department of Public Works and
Highways (DPWH), Dinagat Islands District Engineering Offce, San Jose, Dinagat
Islands through the Regular Infra FY 2013, invites contractors to bid for the following
project(s):
1. a. Contract ID : 12NE0035
b. Contract Name : Concreting of Jct.Magsaysay - CagdianaoRoad
c. Contract Location : K0007+655 - K0008+653.60 with exception Dinagat,
Province of Dinagat Islands
d. Scope of Works : Concreting of 877.70 l.m. road
e. Approved Budget
for the Contract (ABC) : PhP 18,551,553.50
f. Contract Duration : 98 calendar days
g. Bid Document Fee : PhP 25,000.00
2. a. Contract ID : 12NE0036
b. Contract Name : Replacement of Gadong Bridge along Jct. Bolod-
bolod - Albor Road
c. Contract Location : Libjo, Dinagat Islands
d. Scope of Works : Construction of 12.80 m. Flatslab
e. Approved Budget
for the Contract (ABC) : PhP 7,401,930.42
f. Contract Duration : 274 calendar days
g. Bid Document Fee : PhP 10,000.00
3. a. Contract ID : 12NE0037
b. Contract Name : Replacement of Sergio Bridge along Dinagat - Loreto
Road
c. Contract Location : Libjo, Dinagat Islands
d. Scope of Works : Construction of 12.80 m. Flatslab
e. Approved Budget
for the Contract (ABC) : PhP 6,239,854.88
f. Contract Duration : 235 calendar days
g. Bid Document Fee : PhP 10,000.00
The BAC will conduct the procurement process in accordance with the Revised
IRR of R.A. 9184. Bids received in excess of the ABC shall be automatically rejected
at the opening of bids.
To bid for this contract, a contractor must submit a Letter of Intent (LOI), purchase
bid documents and must meet the following major criteria: (a) prior registration with
DPWH, (b) Filipino citizen or 75% Filipino-owned partnership, corporation, cooperative,
or joint venture, (c) with PCAB license applicable to the type and cost of this contract,
(d) completion of a similar contract costing at least 50% of ABC within a period of 10
years, and (e) Net Financial Contracting Capacity at least equal to ABC, or credit line
commitment for at least equal to 10% of ABC. The BAC will use nondiscretionary pass/
fail criteria in the eligibility check and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for registration to
the DPWH-POCW Central Offce before the deadline for the receipt of LOI. The DPWH
POCW-Central Offce will only process contractors applications for registration, with
complete requirements and issue the Contractors Certifcate of Registration (CRC).
Registration Forms may be downloaded at the DPWH website www.dpwh.gov.ph.
The signifcant times and deadlines of procurement activities are shown below:
1. Issuance of Bidding Documents November 21, 2012December 12, 2012 until
11:00 A.M.
2.Pre-bidConference November 28, 2012 @1:30 P.M.
3.Receipt of Bids December 12, 2012 @ 8:00a.m. - 11:00 A.M.
4.OpeningofBids December 12, 2012 at 2:00 P.M.
The BAC will issue hard copies of Bidding Documents (BDs) at DPWH - Dinagat
Islands District Engineering Offce, San Jose, Dinagat Islands, upon payment of
a non-refundable fee as stated above. Prospective bidders may also download the
BDs from the DPWH website, if available. Prospective bidders that will download the
BDs from the DPWH website shall pay the said fees on or before the submission of
their Bids Documents. Bids must accompanied by a Bid Security, in the amount and
acceptable form, as stated in Section 27.2 of the Revised IRR.
Prospective bidders shall submit their duly accomplished forms as specifed in
the BDs in two (2) separate sealed bid envelopes to the BAC Chairman. The frst
envelope shall contain the technical component of the bid, which shall include a copy
of the CRC. The second envelope shall contain the fnancial component of the bid.
Contract will be awarded to the Lowest Calculated Responsive Bid as determined in
the bid evaluation and post-qualifcation.
The DPWH - Dinagat Islands District Engineering Offce, San Jose, Dinagat
Islands reserves the right to accept or reject any bid, to annul the bidding process at any
time prior contract award, without thereby incurring any liability to the affected bidder/s.
Approved by:
(Sgd.) GASPAR A. TAGADAN
Chief, Construction Section
BAC Chairman
I NVI TATI ON TO BI D
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Region III
OFFICE OF THE REGIONAL DIRECTOR
Sindalan, City of San Fernando, Pampanga
(MST-Nov. 22, 2012)
1. CONTRACT ID: 12C00071 Preventive Maintenance of Tarlac-Zambales Road
Location : Tarlac Province
Approved Budget for the Contract: P 64,975,181.03
Scope of Work : Asphalting
Duration : 190 cal. days
2. CONTRACT ID: - 12C00072 - Construction of Sapang Burgos Bridge and
Approaches
Location : Paniqui, Tarlac
Approved Budget for the Contract: P 198,701,306.16
Scope of Work : Bored Pile and Flood Control
Duration : 390 cal. days
3. CONTRACT ID: - 12C00073 - Improvement of Ninoy Aquino By-way (Magalang-
Mabalacat Section)
Location : Mabalacat, Pampanga
Approved Budget for the Contract: P 92,000,379.07
Scope of Work : PCCP and Drainage
Duration : 289 cal. days
x-x-x-x-x-x-x-x-x-x-x
1. The Department of Public Works and Highways (DPWH), through the FY 2012, R.A.
10147 Continuing Regular 2011 Continuing intends to apply the sum of (Please see
above projects) being the Approved Budget for the Contract (ABC) to payments under
the contract for above-mentioned projects. Bids received in excess of the ABC shall
be automatically rejected at bid opening.
2. The Department of Public Works and Highways now invites bids for projects mentioned
above. Works includes Asphalting; Bored Pile and Flood Control; PCCP and
Drainage. Completion of the Works is 190 cal. days for Tarlac-Zambales Road;
390 cal. Days for Sapang Burgos and 289 cal. Days for Ninoy Aquino By-way.
Bidders should have completed, within ten (10) years from the date of submission and
receipt of bids, a single contract similar to the Project, equivalent to at least ffty percent
(50%) of the ABC.
Bidders will bid for the entire contract or per lot, and not per item.
3. Bidding will be conducted through open competitive bidding procedures using non-
discretionary pass/fail criterion as specifed in the Implementing Rules and Regulations
(IRR) of Republic Act 9184 (RA 9184), otherwise known as the Government
Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding stock
belonging to citizens of the Philippines.
4. Contractors/applicants who are interested in the DPWH civil works are required to
register prior to the set schedule of submission of bid while those already registered
shall keep their records current and updated. Contractor Profle Eligibility Process
(CPEP) are subject to further post-qualifcation. Information on registration can be
obtained at DPWH website www.dpwh.gov.ph or Central Procurement Offce (CPO),
5
th
Floor, DPWH Bldg., Bonifacio Drive, Port Area, Manila from 8:00 A.M. to 5:00 P.M.
5. Interested bidders may obtain further information from DPWH-Reg. III and inspect the
Bidding Documents at the address given below from 8:00 A.M. 5:00 P.M.. Monday
to Friday.
6. A complete set of Bidding Documents may be purchased by interested Bidders upon
submission of Letter of Intent (LOI) from the address below and upon payment of
non-refundable fee for the Bidding Documents in the amount of P50,000.00/project.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the DPWH Website
www.dpwh.gov.ph, provided that bidders shall pay the fee for the Bidding Documents
not later than the submission of their bids.
Payments can be made at any DPWH feld offce. The submission of the Original Receipt
(OR) for payments of bidding documents issued by any DPWH feld offce is suffcient
for the BAC of this Regional Offce to process the electronic eligibility evaluation of
contractors.
7. The Department of Public Works and Highways (DPWH) will hold a Pre-Bid Conference
on November 29, 2012, 10:00 A.M. at the Training Room, 2
nd
Floor, DPWH-Region
III, Sindalan, City of San Fernando (P), which shall be opened only to all interested
parties who have purchased the Bidding Documents.
8. Bids must be delivered to the address below on or before December 13, 2012, 10:00
A.M. at the Training Room, 2
nd
Floor, this Offce. All bids must be accompanied by a
bid security in any of the acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose to
attend at the address below. Late bids shall not be accepted.
9. The Department of Public Works and Highways (DPWH) Region III reserves the
right to accept or reject any bid, to annul the bidding process, and to reject all bids at
any time prior to contract award, without thereby incurring any liability to the affected
bidder or bidders.
10. For further information, please refer to:
(Sgd.) LORETA M. MALALUAN
OIC-Asst. Regional Director
BAC-Chairman, DPWH-Reg. III
Sindalan, San Fernando, Pampanga
(045) 455-0647; (045) 455-0649
INVITATION TO BID
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE REGIONAL DIRECTOR
Region XI, Davao City
Tel. No. (082) 226-9302 Fax. No. (082) 226-9372
(MST-Nov. 22, 2012)
1. The Department of Public Works and Highways Regional Offce XI, Davao City through
the CY 2013 Regular Infra Program intends to apply the following sum to payments of
the corresponding contracts listed hereunder. Bids received in excess of the Approved
Budget for the Contracts (ABC) shall be automatically rejected at bid opening.
1. Contract ID : 12L0-0055
Contract
Name/Location
: Rehabilitation/Road Upgrading (Gravel to
Concrete) of Cogon-Kapatagan-Mainit Road
(Brgy. Cogon to Brgy. Binaton Section) , Digos
City, Davao Del Sur
Scope of Work : Reconstruction of Existing dilapidated PCCP
Intermittent sections; Concreting of road;
widening/ Improvement of shoulder along Existing
PCCP; Construction of Drainage Structures (CHB
lined Canal, RCCP); provision of thermoplastic
Pavement Markings
Source of funds : CY 2013 (GAA) DPWH Regular Infra
Estimated Contract Cost : P 96,500,000.00
2. Contract ID : 12L0-0056
Contract
Name/Location
: Rehabilitation/Widening/Road Upgrading (Gravel
to Concrete) of Cogon-Kapatagan-Mainit Road
(Brgy. Binaton to Brgy. Kapatagan Section), Digos
City, Davao del Sur
Scope of Work : Reconstruction of Existing dilapidated PCCP
Intermittent sections; ; widening of existing 4.0
m. concrete pavement; widening/ Improvement
of shoulder along Existing PCCP: Construction of
Drainage Structures (CHB lined Canal, RCCP);
provision of thermoplastic Pavement Markings
Source of funds : CY 2013 (GAA) DPWH Regular Infra
Estimated Contract Cost : P 72,375,000.00
2. The Department of Public Works and Highways Regional Offce XI, Davao City, now
invites bids for the above-mentioned contracts. Bidders should have completed at least
a single project from the date of submission and receipt of bids, a similar contract of
the project to be bid. The description of an eligible bidder is contained in the Bidding
Documents, particularly, in section II, Instructions to Bidders.
3. Bidding will be conducted through open competitive bidding procedures using non-
discretionary pass/fail criterion as specifed in the IRR of RA 9184, otherwise known
as The Government Procurement Act.
Bidding is restricted to Filipino Citizens/sole proprietorships, partnership or organizations
with at least seventy-fve (75%) interest or outstanding capital stock belonging to citizens
of the Philippines.
4. Interested Bidders may obtain further information from the Department of Public Works
and Highways, Regional Offce XI, Davao City, and inspect at the address given below
from Monday to Friday between 8:00 a.m. to 5:00 pm.
5. A complete set of Bidding documents maybe purchased by interested bidders from the
address below and upon payment of a non-refundable fee for the bidding documents
the amount of P 50,000.00/project from November 22, 2012 to December 14, 2012,
until 10:00 a.m.
It may also be downloaded free of charge from the www.dpwh.gov.ph and Philgeps
websites, provided that bidders shall pay the fee for the bidding documents not later
than the submission of bids.
6. The Department of Public Works and Highways Regional Offce XI, Davao City, thru the
Bids and Awards Committee will hold a Pre-bid conference on November 29, 2012 at
the DPWH Conference Room, DPWH XI Compound, R. Magsaysay Street, Davao City
at 10:00 a.m., which shall be open only to all interested Parties who have purchased
the bidding documents.
7. Bids must be delivered on or before 10:00 A.M. of December 14, 2012 at the Offce
of the BAC Chairman, DPWH XI, R. Magsaysay Street, Davao City. All bids must be
accompanied by a bid security in any acceptable forms and in the amount stated in
ITB Clause 18.
Bids will be opened at 2:00 P.M. of the same day in the presence of the bidders
representatives who choose to attend at the address below. Late bids will not be
accepted.
8. The Department of Public Works and Highways Regional Offce XI, Davao City, reserves
the right to accept or reject any bid to annul the bidding process and to reject all bids
at any time prior to contract award without thereby incurring any liability to the affected
bidders or bidders.
9. For further information, please refer to:
Charito Tinio-Mertens
Engineer III- Head, BAC Secretariat
Department of Public Works and Highways Regional Offce XI
R. Magsaysay Street, Davao City
Telefax : (082) 226-9310
Email : mertens.charito@dpwh.gov.ph
bacsecretariatdpwhxi@yahoo.com
(Sgd.) TOMAS M. RODRIGUEZ
Assistant Regional Director
BAC Chairman
I NVI TATI ON TO BI D
CYAN MAGENTA YELLOW BLACK
NOVEMBER 22, 2012
THURSDAY
D3
Classifeds
ManilaStandardToday
Page Compositor: Diana Keyser Punzalan
adv.mst@gmail.com
Republic of the Philippines
Kagawaran ng Pagawain at Lansangang Pambayan
Tanggapan ng Distrito Inhenyero
Telepono: 0917-7079668
Negros Oriental 1
st
District Engineering District Offce
Bindoy, Negros Oriental, Rehiyon VII
(MST-Nov. 22 & 28, 2012)
I NVI TATI ON TO BI D
The DPWH, Negros Oriental 1
st
District Engineering Offce, through the Bids
and Awards Committee (BAC), invites contractors to apply to bid for the contract(s);
1.) Contract ID 012HJ00025
Contract Name Reconstruction of Martilo Bridge
Contract Location La Libertad, Negros Oriental
Scope of Works A.1 Construction of Detour
102(4) Surplus unclassified Excavation, 103(3)
Foundation Fill, 104(1) Embankment, 201 Aggregate
Base Course, 505(a) Grouted Riprap, Class A , 500(1)
c 910mm f RCPC
A.2 Construction of Bridge Structure
101(2) Removal of Damage Existing Bridge, 103(2)
Bridge Excavation, 400(22a) Reinforced Concrete Test
Pile (F & D), 400(22b), Reinforced Concrete Pile (F &
D), 401 Bridge Railings, 404(1) Reinforcing Steel Grade
40 (FCHB & P), 405(1) Structural Concrete Class A,
405(1a) Structural Concrete Class A (fc=28 mpcs),
406 Pre-stressed Structural Concrete Girder, SPL-1
Mobilization and Demobilization and SPL-3 Provide
Project Sign Board
Approved Budget for the Contract P 10,290,000.00
Duration 162 Calendar Days
Procurement will be conducted through open competitive bidding procedures
in accordance with R.A. 9184 and its Revised Implementing Rules and Regulations.
To bid for the contract, a contractor must submit a Letter of Intent (LOI), purchased
bid documents and must meet the following major criteria; (a) prior registration with
DPWH, (b) Filipino Citizen owned partnership, corporation, cooperative, or venture (c)
with PCAB License applicable to the type and the cost of this contract, (d) completion of
a similar contract costing at least 50% of ABC, or credit line commitment at least equal
to 10% of ABC. The BAC will use non-discretionary pass/fll criteria in the eligibility
check and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for registration
to the DPWH-POCW Central Offce will only process contractors applications for
the registration with complete requirements and issue the Contractors Certifcate of
Registration (CCR). Registration forms may be downloaded at the DPWH website.
www.dpwh.gov.ph
The signifcant time and deadlines of procurement activities are shown below:
1. Receipt of LOI from Prospective Bidders Deadline: November 29, 2012
2. Issuance of Bidding Documents November 29, 2012 to December 17, 2012
3. Pre-Bid Conference December 4, 2012 @ 10:00 A.M.
4. Receipt of Bids December 17, 2012 (12:00 Noon)
5. Opening of Bids December 17, 2012 @ 1:30 P.M.
The BAC will issue hard copies of Bidding Documents (BDs) upon payment of
a non-refundable fee of P 10,000.00.
Prospective bidders may also download the BDs from the DPWH website, if
available. Prospective bidders that will download form the DPWH website shall pay the
said fees on or before the submission of their documents. Bids must be accomplished
by a bid security, in the amount and acceptable form, as started in Section 27.2 of
the Revised IRR.
Prospective bidders shall submit their duly accomplished forms as specifed in
the BDs in two (2) separate sealed bid envelopes to the BAC Chairman. The frst
envelope shall contain the technical component of the bid, which shall include a copy
of the CRC. The second envelope shall contain the fnancial component of the bid.
Contract will be awarded to the lowest calculated responsive bid as determined in the
bid evaluation and post-qualifcation.
The DPWH, Negros Oriental 1
st
District Engineering District Offce reserves
the right to accept or reject any or all bid and annul the bidding process anytime before
contract award, without incurring any liability to the affected bidders.
Approved:
For and In-the-Absence of the
BAC Chairman
(Sgd.) SALOME C. GRAVADOR
(BAC Vice Chairman)
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Nueva Vizcaya1
st
District Engineering Offce
Bayombong, Nueva Vizcaya
(MST-Nov. 22, 2012)
The Bids and Awards Committee BAC of the DPWH, Nueva Vizcaya1
st
District Engineering Offce, invites contractors tobid for the following
projects:
Contract ID : 12BI0099
Name of Contract : Repair/Maintenance of Flood Control
Structures along Magat River, Batu Section
Contract Location : Bambang, Nueva Vizcaya
Description: : Construction of reinforced revetment w/
2 layered top gabion. Construction of 4
units spurdikes w/ aggregate . Riverbed
excavation w/ disposal.
Approved Budget
For the Contract (ABC) : Php. 19,600,000.00
Contract Duration : 227 calendar days
The BAC will conduct this procurement process in accordance with the
Revised IRR of R.A. 9184.Bids received in excess of the ABC shall be
automatically rejected at the opening of the bid, To bid for this contract, a
contractor must submit a Letter of Intent (LOI) and purchased bid documents
and must meet the following major criteria: (a) prior registration with the
DPWH, (b) Filipino Citizen or 75% Filipino-owned partnership, corporation,
cooperative, or joint venture (c) with PCAB License applicable to the type
and cost of this contract, (d) completion of a similar contract costing at least
50% of ABC within a period of 10 years, and (e) Net Financial Contracting
Capacity at least equal to ABC, or credit line commitment/cash deposit
certifcate for at least 10% of ABC, or credit line commitment at least equal
to 10% of the ABC.. The BAC will use non-discretionary pass/fail criteria
in the eligibility check, preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for
registration, to the DPWH-POCWCentral Offce before the deadline for
the receipt of LOIs. The DPWH POCW-Central Offce will only process
the contractors application for registration with complete requirement and
issue the Contractors Certifcate of Registration (CRC). Registration forms
may be downloaded at the DPWH Website :www.dpwh.gov.ph.
The signifcant times and deadlines of procurement activities are shown
below:
1. Issuance of Bidding Documents November 20-December 11, 2012
2. Pre-Bid Conference November 28, 2012
3. Receipt/Opening of Bids December 11, 2012 @ 2:00PM
The BAC will issue hard copies of Bidding Documents (BDs) at the
DPWH-Nueva Vizcaya 1
st
District Engineering Offce upon payment of a
non-refundable fee of Php.10,000.00 for Bid Document, .Prospective may
also download the BDs from DPWH Website, if available, Prospective
Bidders that will download the BDs from the DPWH website shall pay the
said fees on or before submission of their bids.the Pre-Bid Conference shall
be open only to interested parties who have purchased the BDs.Bids must
be accompanied by a Bid Security in the amount and acceptable form, as
stated in 27.2 of the Revised IRR.
Prospective bidders shall submit their duly accomplish forms as specifed in
the BDs in two (2) separate sealed bid envelop to the BAC Chairman, the
frst envelop shall contain the Technical component of the Bid,which shall
include a copy of the CRC. The second envelop shall contain the Financial
component of the Bid. Contract will be awarded to the lowest calculated
Responsive Bid as determined in the evaluation and post qualifcation.
The DPWH reserves the right to accept or reject any Bid, and to annul the
bidding process if the funds/allotments for the projects have been withheld
or reduced through no fault of the procuring entity without thereby incurring
any liability to the affected Bidder or Bidders
(Sgd.) MARIFEL T. ANDES
Asst. District Engineer
BAC-Chairman
Noted:
(Sgd.) RONALD P. REYES
District Engineer
INVITATION TO BID
BIDS AND AWARDS COMMITTEE
INVITATION TO BID
(MST-Nov. 22, 2012)
The Bangko Sentral ng Pilipinas (BSP), through its Bids and Awards
Committee (BAC), invites bidders to apply for eligibility and to bid
for the hereunder project:
Name of Project One (1) lot Supply of materials, labor,
tools, equipment, technical supervision
and commissioning for the replacement
of Air Handling Units (AHU) serving 3
rd
,
4
th
and 5
th
foors of Building A, Security
Plant Complex, Bangko Sentral ng
Pilipinas per BSP Terms of Reference.
Approved Budget for
the Contract(ABC)
P9,628,000.00
Completion period One hundred eighty (180) calendar
days reckoned from the date stipulated
in the Notice to Proceed to be issued
by the Department of General Services
Bidders should have undertaken a similar requirement awarded
and completed from Y2007 to present amounting to at least 50% of
the ABC. The Eligibility Check/ Screening as well as the Preliminary
Examination of Bids shall use non-discretionary pass/fail criteria.
Post-qualifcation of the lowest calculated bid shall be conducted.
All particulars relative to Eligibility Statement and Screening,
Bid Security, Performance Security, Pre-bidding Conference(s),
Evaluation of Bids, Post-qualifcation and Award of Contract shall
be governed by the pertinent provisions of Republic Act No. 9184
and its Revised Implementing Rules and Regulations (IRR).
The complete schedule of activities is listed, as follows:
Activities Schedule
1. Issuance of Bid Documents Starting 22 November 2012
(from 9:00 A.M. to 12:00 NN and
1:00 P.M. to 2:00 P.M. only)
Procurement Offce
Room 212, 2
nd
Floor,
Five-Storey Building
A. Mabini corner P. Ocampo Sr.
Streets, Malate, Manila
Tel. No. 306-3123/Fax No. 708-7130
2. Joint Site Inspection 03 December 2012, 9:00 AM;
Building A, Security Plant Complex,
Bangko Sentral ng Pilipinas, East
Ave., Quezon City
3. Pre-bid Conference 7 December 2012, 10:30 AM;
MR2A Conference Room, 2
nd
Floor, Five Storey Bldg., BSP Main
Complex, Malate Manila
4. Submission and Opening of
Bids
19 December 2012, 2:00 PM;
MR2A Conference Room, 2
nd
Floor, Five Storey Bldg., BSP Main
Complex, Malate Manila
5. Bid Evaluation These shall be in accordance with
the prescribed periods allowed in
the revised IRR of R.A. No. 9184.
6. Post-qualifcation
7. Notice of Award
The ITB and Checklist of Requirements for Bidders may be
downloaded from the website of the Philippine Government
Electronic Procurement System (PhilGEPS) and the BSP Website
(www.bsp.gov.ph). The complete set of the Bidding Documents may
be purchased by interested bidders from the address stated above
upon presentation of the PhilGEPS Suppliers Order Form and
payment of a non-refundable fee in the amount of P10,000.00.
Only bidders who have purchased the bidding documents shall be
allowed to raise or submit written queries or clarifcation.
The BSP assumes no responsibility whatsoever to compensate or
indemnify bidders for any expenses incurred in the preparation of
the bid.
The BSP reserves the right to accept or reject any bid, to declare
the bidding a failure, not to award the contract, to annul the bidding
process and to reject all bids at any time prior to contract award,
without thereby incurring any liability to the affected bidders.
Furthermore, the BSP reserves the right to waive any minor defects
or formality and to accept the proposal most advantageous to the
agency.
(SGD) ENRIQUE C. DOMINGO
Chairman
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Offce of the Regional Director
Region II- Cagayan Valley Region
Tuguegarao City
(MST-Nov. 22, 2012)
The DPWH Regional Offce No. 2 through Bids and Awards Committee
(BAC), invites contractors to apply to bid for the following contracts.
1. Contract ID: 12B00027
Contract Name: Construction of BLGF Building
Contract Location: Regional Government Site, Carig,
Tuguegarao City
Brief Description: Construction of 10m x 20m two storey building
Approved Budget for the Contract (ABC): 9,708,737.86
Contract Duration: 150 CD
Procurement will be conducted through open competitive bidding
procedures in accordance with RA 9184 and its Revised Implementing
Rules and Regulations.
The bid for this contract, a contractor must submit a Letter of Intent
(LOI), purchased bid documents and must meet the following major criteria:
(a) prior registration with DPWH, (b) Filipino citizen or 75% Filipino-owned
partnership, corporation, cooperative, or joint venture, (c) wit PCAB license
applicable to the type and cost of this contract, (d) completion of a similar
contract costing at least 50% of ABC, or credit line commitment at least
equal to 10% of ABC. The BAC will use non-discretionary pass/fail criteria
in the eligibility check and preliminary examination of bids.
Unregistered contractors, however, shall submit their applications for
registration to the DPWH-POCW central Offce before the deadline for
the receipt of LOI. The DPWH POCW-Central Offce will only process
contractors application for registration with complete requirements and issue
the Contractors certifcate of Registration (CRC). Registration Forms may
be downloaded at the DPWH website www.dpwh.gov.ph .
The signifcant time and deadlines of procurement activities are shown
below:
1. Issuance of Bidding Documents November 22-December 12, 2012
2. Pre-Bid Conference November 29, 2012
3. Receipt of Bids December 12, 2012, 10:00 A.M.
4. Opening of Bids December 12, 2012 10:30 A.M.
Letter of Intents (LOIs) and/or applications for eligibility and latest Class
A documents are to be accepted by the BAC together with the Bids and
other relevant documents on or before the deadline for submission of bids.
The BAC will issue hard copies of Bidding Documents (BDs) at the
DPWH Regional Offce No. 2, upon payment of a non refundable fee of
P10,000.00. Prospective bidders may also download the BDs from the
DPWH website, if available prospective bidders that will download the BDs
from the DPWH website shall pay the said fees on or before the submission
of their bids documents. Bids must be accompanied by a bid security, in the
amount and acceptable form, as stated in section 27.2 of the Revised IRR.
Prospective bidders shall submit their duly accomplished forms as
specifed in the BDs in two (2) separate sealed bid envelopes to the BAC
Chairman. The frst envelope shall contain the technical component of bid,
which shall include a copy of the CRC. The second envelope shall contain
the fnancial component of the bid. Contract will be awarded to the Lowest
Calculated Responsive Bid as determined in the bid evaluation and post-
qualifcation.
The DPWH Regional Offce No. 2 reserves the right to accept or reject
any or all bid and to annul the bidding process anytime before Contract
award, without incurring any liability.
Approved by:
(Sgd.) MELANIO C. BRIOSOS, CESO IV
Assistant Regional Director
(BAC Chairman)
I NVI TATI ON TO BI D
Republic of the Philippines
Department of Public Works and Highways
Negros Occidental 4th District Engineering Offce
Bago City, Negros Occidental
Tel Nos. (034)4610-599; (034)4611-250 & 732-4632
Email Add: dpwhnegocc4thdeo@yahoo.com.ph
INVITATION TO BID for the
Assets Preservation of National Roads Generated from Pavement
Management System/Highway Development and Management-4
(HDM-4) Preventive Maintenance (Intermittent Sections) Jct.
Bagonawa La Carlota Isabela Road, Haguimit La Granja
Section, K0051+713 K0054+204 with exception, La Carlota City,
Negros Occidental
The DPWH Neg. Occ. 4
th
District Engineering Offce, Bago City, Neg. Occ., through
the FY 2013 DPWH Infra Program intends to apply the sum of Php 18,318,013.38
being the Approved Budget for the Contract (ABC) to payments under the contract
no. 013GN002. Bids received in excess of the ABC shall be automatically rejected at
bid opening.
The DPWH Neg. Occ. 4
th
District Engineering Offce, Bago City, Neg. Occ. now
invites bids for the Asphalt- 2,260.000 lm. width = 6.1m: 13,497.780 sq.m. with
50.00 mm thickness; 288.220 sq.m. with 100.00 mm thickness and the total area
is 13,786.000 sq.m. Completion of the Works required is 50 Calendar Days. Bidders
should have completed, within ten (10) years from the date of submission and receipt of
bids, a contract similar to the project. The description of an eligible bidder is contained
in the Bidding Documents, particularly, in Section II, Instruction to Bidders.
Bidding will be conducted through open competitive bidding procedures using non-
discretionary pass/fail criterion as specifed in the Implementing Rules and Regulations
(IRR) of Republic Act 9184 (RA 9184), otherwise known as the Government
Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding capital
stock belonging to citizens of the Philippines.
Interested bidders may obtain further information from DPWH Neg. Occ. 4
th
District
Engineering Offce, Bago City, Negros Occidental and inspect the Bidding Documents
at the address given below from 8:00 A.M. 5:00 P.M.
A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the Bidding
Documents in the amount of Twenty-Five Thousand Pesos (Php 25,000.00).
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
Procuring Entity, provided that bidder shall pay the fee for the Bidding Documents not
later that the submission of their bids.
To bid for this contract, a contractor must present their Contractors
Registration Certifcate (CRC) in person or thru their authorized representative
as refected in their CRC with their valid IDs upon buying and submission of bids.
The DPWH Neg. Occ. 4
th
District Engineering Offce, Bago City, Neg. Occ.
will hold a Pre-Bid Conference on November 29, 2012, 10:00 A.M. at BAC Offce,
DPWH Neg. Occ. 4
th
DEO, Bago City, Neg. Occ., which shall be open to all interested
parties.
Bids must be delivered to the address below on or before December 12, 2012
until 9:00 A.M. and to be opened at 2:00 P.M. of the same day at BAC Offce,
DPWH Neg. Occ. 4
th
DEO, Bago City, Neg. Occ. All bids must be accompanied by a
bid security in any of the acceptable forms and in the amount stated in ITB Clause 18.
Bids will be opened in the presence of the bidders representatives who choose to
attend at the address below. Late bids shall not be accepted.
The DPWH Neg. Occ. 4
th
District Engineering Offce, Bago City, Neg. Occ. reserves
the right to accept or reject any bid, to annul the bidding process, and to reject all bids
at any time prior to contract award, without thereby incurring any liability to the affected
bidder or bidders.
For further information, please refer to:
MARIO T. MULETA MAGDALENO C. RUIZ
Head, BAC TWG Head, BAC Secretariat
Mobile No. 09298633408 Mobile No. 09173098007
DPWH Neg. Occ. 4
th
DEO DPWH Neg. Occ. 4
th
DEO
Bago City, Neg. Occ. Bago City, Neg. Occ.
Tel. Nos. (034) 4610-599, (034)4611-250 & Tel. Nos. (034) 4610-599, (034)4611-250 &
(034)7324632 (034)7324632
Email Add: dpwhnegocc4thdeo@yahoo.com.ph. Email Add: dpwhnegocc4thdeo@yahoo.com.ph.
(Sgd.) RICARDO C. GARAYGAY
Acting Assistant District Engineer
BAC Chairman
Noted:
(Sgd.) EMMANUEL C. MENDIGUARIN
OIC-District Engineer
(MST-Nov. 22, 2012)
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL JUDICIAL REGION
REGIONAL TRIAL COURT
BRANCH CXXXIX (139)
MAKATI CITY
PHILIPPINE AIRLINES, INC.
Plaintiff,
-versus- CIVIL CASE NO. 08-690
For Damages
ROD HENRICH A. DE LARA,
Defendant.
x---------------------------------------x
ORDER
For resolution by this Court is the Motion for
Leave of Court for Publication of Summons fled by
plaintiff through counsel on 20 April 2012.
In the said motion, plaintiff prays for leave of court
to effect service of summons upon the defendant by
publication in a newspaper of general circulation.
It alleged that it had exerted further investigatioin
through its paralegal, Mr. Claro Rapatalo to ascertain
the whereabouts of the defendant bu to no avail.
Finding the grounds relied upon in the said
motion to be impressed with merit and in accordance
with Section 14, Rule 14 of the 1997 Rules of Civil
Procedure, the said motion is hereby GRANTED.
Accordingly, let the service of summons upon
the defendant Rod Henrich A. De Lara be effected
through publication in a newspaper of general
circulation to be determined by raffe, three (3) times
in three (3) consecutive weeks at plaintiffs expense.
Defendant is given a period of sixty (60) days
from the last publication within which to fle answer
or responsive pleading. Likewise, let copy of the
summons and this Order be sent by registered mail
to the last known address of the defendant.
Furnish copies of this Order to the plaintiff and
its counsel.
SO ORDERED.
Given to Chambers this 4
th
day of September
2012 at Makati City.
(Sgd.) BENJAMIN T. POZON
Presiding Judge
REPUBLIC OF THE PHILIPPINES
NATIONAL CAPITAL JUDICIAL REGION
REGIONAL TRIAL COURT
BRANCH CXXXIX (139)
MAKATI CITY
PHILIPPINE AIRLINES, INC.,
Plaintiff,
-versus - CIVIL CASE NO. 08-690
FOR: Damages
ROD HENRICH A. DE LARA,
Defendant.
x------------------------------------x
TO: ROD HENRICH A. DE LARA -No. 313 Abbey
Street, Goodwill 3 Subdivision, Paranaque City
You are hereby required, within sixty (60) days
after service of this Summons upon you, to fle with
this Court and serve on the plaintiff your Answer to
the complaint, copy of which is attached, together with
annexes. If you fail to answer within the time fxed,
the plaintiff will take judgment by default and may
be be granted the relief applied for in the Complaint.
Moreover, pursuant to the IBP-OCA Memorandum
on Policy Guidelines, dated March 12, 2002, you are
expected not to fle a Motion to Dismiss but instead,
you are requested to allege the grounds of such
Motion as defenses in your answer. Likewise, you
are expected to utilize the deposition discovery
measures under Rules 23, 25, 26, 27 & 28 of the
1997 Rules of Civil Procedure.Failure to resort to
deposition by written interrogatories under Rule 25
and the request for admission of facts under Rule 27
may be prejudicial to your interest
WITNESS my hand under the seal of the Court,
this 4
th
day of September 2012 at-Makati City.
(Sgd.) ATTY. ROWENA M. SIMBAHAN
Branch Clerk of Court
(MST-Nov. 8, 15 & 22, 2012)
For
f as t
ad
r es ul t s ,
pl eas e
c al l
659-48-30
l oc al
303
or
659-48-03
ERRORS
&
OMI SSI ONS
I n Cl a s s i f i e d
A d s s e c t i o n
must be brought
to our attention
the very day the
advertisement is
published. We will
not be responsible
for any incorrect
ads not reported
to us immediately.
ERRATUM
P H I L I P P I N E P O R T S
AUTHORITY PORT DISTRICT
OFFI CE NORTHERN
MINDANAO INVITATION TO
BID FOR THE PROVISION
OF TEMPORARY SUPPORT
PERSONNEL FOR THE PDO-
NORTHERN MI NDANAO,
PMO- I LI GAN AND PMO-
OZAMI Z p u b l i s h e d o n
November 21, 2012, Bids must
be submitted at 8:30 AM, Bid
opening shall be at 9:00 AM,
paragraph "Bidding is open to
all interested bidders, whether
local or foreign, subject to
the conditions for eligibility
provi ded i n the IRR of RA
9184" should be ommitted and
the committee name should be
Bids and Awards Committee-
Procurement of Goods and not
as published.
ALIAS -
S U M M O N S
CYAN MAGENTA YELLOW BLACK
Manila
Standard
TODAY
CYAN MAGENTA YELLOW BLACK CYAN MAGENTA YELLOW BLACK
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY
2013. Intends to apply the sum of Php45,499,616.34 Php 82,000,000.00 and Php
150,000,000.00 being the Approved Budget for the Contract (ABC) for each project
to payments under the contract ID NOS. 13H00016, 13H00017 and 13H00018
respectively for the projects stated below. Bids received in excess of the ABC shall be
automatically rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following
to wit;
13H00016-Php 45,499,616.34
Widening /Concreting along gov./Cuenco Avenue, Cebu City
It involves concreting of 300mm thick.
Completion of Work is 270 C.D.
13H00017-Php 82,000,000.00
Improvement of Concepcion, Danao-buenavista, Carmen Road, including
Bridge, Bohol
1. K0071+820-K0073+806.89
Completion of Work is 190 C.D.
13H00018-Php 150,000,000.00
Flyover at U.N. Avenue, Plaridel, Mandaue City
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least
ffty percent (50%) of the ABC.
2. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules and
Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
3. Interested bidders may obtain further information from DPWH-Region VII and
inspect the Bidding Documents at the address given below from 8:00 A.M. to
5:00 P.M.
4. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the Bidding
Documents in the amount of Php25,000.00 for ID 13H00016, Php 50,000.00 for
ID 13H00017 & 13H00018
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
DPWH, provided that bidders shall pay the fee for the Bidding Documents until
10:00 A.M. on the day of submission of their bids-December 13, 2012.
5. The Department of Public Works and Highways will hold a Pre-Bid Conference
on November 29, 2012, 10:00 A.M. at DPWH Conference Room, DPWH
Regional Offce VII, South RoadProperties, Cebu City which shall be open
only to all interested parties who have purchased the Bidding Documents.
6. Bids must be delivered on or before December 13, 2012, 1:00-1:30 P.M. at
DPWH Conference Room, DPWH Regional Offce No. VII, South Road
Properties, Cebu City. All bids must be accompanied by a bid security in any of
the acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose to
attend at the aforesaid address. Late bids shall not be accepted.
7. The DPWH reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without
thereby incurring any liability to the affected bidder or bidders.
For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
(Sgd.) ATTY.AYAON S. MANGGIS
Caretaker, Administrative Division
BAC Chairman
(MST-NOV. 22, 2012)
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY 2013.
Intends to apply the sum of Php 75,307,687.90, Php 27,742,080.83 and Php
42,397,724.13 being the Approved Budget for the Contract (ABC) for each project to
payments under the contract ID NOS. 13H00013, 13H00014 and 13H00015 respectively
for the projects stated below. Bids received in excess of the ABC shall be automatically
rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following
to wit;
13H00013-Php 75,307,687.90
Replacement of La Libertad bridge along dumaguete North Road (Jct. Bais-
Kabankalan-Negros Occidental Boundary), Negros Oriental
1. Km. 104+748.50
Completion of Work is 270 C.D.
13H00014-Php 27,742,080.83
Widening of F. Sotto Drive (from Gorordo Avenue to Gen. Maxilom Avenue, Cebu
City
Sta. 0+000-Sta. 0+460
Asphalting of 460m
Completion of Work is 150 C.D.
13H00015-Php 42,397,724.13
Rehabilitation of Gov. Cuenco Ave., Cebu City
1. K0007+999-K0007+1579
2. K0009+187-K0009+1117
It involves Asphalting of 1.510km
Completion of Work is 210 calendar days
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least ffty
percent (50%) of the ABC.
1. Bidding will be conducted through open competitive bidding procedures
using non-discretionary pass/fail criterion as specifed in the Implementing
Rules and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise
known as the Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
2. Interested bidders may obtain further information from DPWH-Region VII
and inspect the Bidding Documents at the address given below from 8:00
A.M. to 5:00 P.M.
3. A complete set of Bidding Documents may be purchased by interested
Bidders from the address below and upon payment of a non-refundable
fee for the Bidding Documents in the amount of Php50,000.00 for ID
13H00013, Php 25,000.00 for ID 13H00014 & ID 13H00015
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of
the DPWH, provided that bidders shall pay the fee for the Bidding Documents
until10:00 A.M. on the day of submission of their bids-December 12, 2012.
4. The Department of Public Works and Highways will hold a Pre-Bid
Conference on November 29, 2012, 10:00 A.M. at DPWH Conference
Room, DPWH Regional Offce VII, South Road Properties, Cebu City
which shall be open only to all interested parties who have purchased the
Bidding Documents.
5. Bids must be delivered on or before December 12, 2012, 1:00-1:30 P.M. at
DPWH Conference Room, DPWH Regional Offce No. VII, South Road
Properties, Cebu City. All bids must be accompanied by a bid security in
any of the acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose to
attend at the aforesaid address. Late bids shall not be accepted.
6. The DPWH reserves the right to accept or reject any bid, to annul the
bidding process, and to reject all bids at any time prior to contract award,
without thereby incurring any liability to the affected bidder or bidders.
7. For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
(Sgd.) ATTY.AYAON S. MANGGIS
Caretaker, Administrative Division
BAC Chairman
(MST-NOV. 22, 2012)
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY 2013.
Intends to apply the sum of Php 63,423,523.76, Php 82,949,923.95 and Php
99,946,337.06 being the Approved Budget for the Contract (ABC) for each project to
payments under the contract ID NOS. 13H00010, 13H00011 and 13H00012 respectively
for the projects stated below. Bids received in excess of the ABC shall be automatically
rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following
to wit;
13H00010-Php 63,423,523.76
Rehabilitation of Panglao Island Circumferential road, Bohol Province
1. K0013+555-K0018+555
It involves asphalting of 5.00kms
Completion of Work is 180 C.D.
13H00011-Php 82,949,923.95
Rehabilitatation of Panglao Island Circumferential road, Bohol Province
1. K0016+020-K0019+496
2. K0020+039-K0023+001
It involves asphalting of 6.438 km.
Completion of Work is 240 C.D.
13H00012-Php 99,946,337.06
Rehabilitatation of Panglao Island Circumferential road, Bohol Province
1. K0003+343.50-K0003+577
2. K0005+000-K0012+010
It involves asphalting for 7,243.50 km.
Completion of Work is 270 calendar days
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least
ffty percent (50%) of the ABC.
2. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules and
Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
3. Interested bidders may obtain further information from DPWH-Region VII and
inspect the Bidding Documents at the address given below from 8:00 A.M. to
5:00 P.M.
4. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the
Bidding Documents in the amount of Php50,000.00 for each project.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
DPWH, provided that bidders shall pay the fee for the Bidding Documents until
10:00 A.M. on the day of submission of their bids-December 14, 2012.
5. The Department of Public Works and Highways will hold a Pre-Bid Conference
on December 3, 2012, 10:00 A.M. at DPWH Conference Room, DPWH
Regional Offce VII, South Road Properties, Cebu City which shall be open
only to all interested parties who have purchased the Bidding Documents.
6. Bids must be delivered on or before December 14, 2012, 1:00-1:30 P.M. at
DPWH Conference Room, DPWH Regional Offce No. VII, South Road
Properties, Cebu City. All bids must be accompanied by a bid security in any
of the acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose
to attend at the aforesaid address. Late bids shall not be accepted.
7. The DPWH reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without
thereby incurring any liability to the affected bidder or bidders.
For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
(Sgd.) ATTY.AYAON S. MANGGIS
Caretaker, Administrative Division
BAC Chairman
(MST-NOV. 22, 2012)
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY 2013. Intends
to apply the sum of Php 68,547,876.21,Php 58,212,693.18 and Php 88,368,119.21.00 being
the Approved Budget for the Contract (ABC) for each project to payments under the contract
ID NOS. 13H00007, 13H00008 and 13H00009 respectively for the stated projects below.
Bids received in excess of the ABC shall be automatically rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following to wit;
13H00007-Php 68,547,876.21
Rehabilitation of Bais-Kabankalan Road, Negros Oriental
1. K0055+355-K0056+123
2. K0060+300-K0061+711
3. K0063+000-K0063+138
4. K0063+200-K0064+209
5. K0073+049-K0074+073
It involves Concreting of 230mm thick for 4.35 km.
Completion of Work is 300 C.D.
13H00008-Php 58,212,693.18
Upgrading of Bayawan-Mabinay road, Negros Oriental
1. K0121+(-570)-K0124+(080)
2. K0124+(351)-K0125+000
It involves concreting 0f 280mm thick for 3.159 km.
Completion of Work is 270 C.D.
13H00009-Php 88,368,119.21
Upgrading of Sta. Catalina-Pamploma-tanjay City Road, Negros Oriental
1. K0049+778-K0051+500
2. K0051+602-K0051+898
3. K0052+066-K0052+122
4. K0052+585-K0054+485
It involves concreting of 280mm thick for 3.974 km.
Completion of Work is 270 calendar days
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least ffty
percent (50%) of the ABC.
2. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules
and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding capital
stock belonging to citizens of the Philippines.
3. Interested bidders may obtain further information from DPWH-Region VII and inspect
the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M.
4. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the Bidding
Documents in the amount of Php50,000.00 for each project.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
DPWH, provided that bidders shall pay the fee for the Bidding Documents until
10:00 A.M. on the day of submission of their bids-December 11, 2012.
5. The Department of Public Works and Highways will hold a Pre-Bid Conference on
November 28, 2012, 10:00 A.M. at DPWH Conference Room, DPWH Regional
Offce VII, South Road Properties, Cebu City which shall be open only to all
interested parties who have purchased the Bidding Documents.
6. Bids must be delivered on or before December 11, 2012, 1:00-1:30 P.M. at DPWH
Conference Room, DPWH Regional Offce No. VII, South Road Properties,
Cebu City. All bids must be accompanied by a bid security in any of the acceptable
forms and in the amount stated in ITB Clause 18.1.
7. Bids will be opened in the presence of the bidders representatives who choose to
attend at the aforesaid address. Late bids shall not be accepted.
8. The DPWH reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without thereby
incurring any liability to the affected bidder or bidders.
For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
(Sgd.) ATTY.AYAON S. MANGGIS
Caretaker, Administrative Division
BAC Chairman
(MST-NOV. 22, 2012)
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY 2013. Intends
to apply the sum of Php 75,392,000.00,Php 56,748,000.00 and Php73,500,000.00 being the
Approved Budget for the Contract (ABC) for each project to payments under the contract ID
NOS. 13H00004, 13H00005 and 13H00006 respectively for the stated projects below. Bids
received in excess of the ABC shall be automatically rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following to wit;
13H00004-Php 75,392,000.00
Upgrading of Antequerra-San Isidro-Libertad (Tubigon) Road, Bohol Province
1. K0034+(-330)-K0034+(-256)
2. K0034+(-256)-K0034+486.34
3. K0035+(-007)-K0037+740
It involves asphalt overlay of 100mm for a total net length of 3.57 km.
Completion of Work is 190 C.D.
13H00005-Php 56,748,000.00
Upgrading of Antequerra-San Isidro-Libertad (Tubigon) Road,Bohol Province
1. K0020+911-K0023+100
It involves concreting of 2.27 km.
Completion of Work is 180 C.D.
13H00006-Php 73,500,000.00
Upgrading of Balilihan-Hanopol-Batuan road, Balilihan Section, Bohol Province
1. K0028+756.89-k0030+040
2. K0033+682.40-k0035+982
It involves concreting of 3.68 km.
Completion of Work is 190 calendar days
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least ffty
percent (50%) of the ABC.
2. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules
and Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding capital
stock belonging to citizens of the Philippines
3. Interested bidders may obtain further information from DPWH-Region VII and
inspect the Bidding Documents at the address given below from 8:00 A.M. to 5:00
P.M.
4. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the Bidding
Documents in the amount of Php50,000.00 for each project.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
DPWH, provided that bidders shall pay the fee for the Bidding Documents until
10:00 A.M. on the day of submission of their bids-December 10, 2012.
5. The Department of Public Works and Highways will hold a Pre-Bid Conference on
November 27, 2012, 10:00 A.M. at DPWH Conference Room, DPWH Regional
Offce VII, South Road Properties, Cebu City which shall be open only to all
interested parties who have purchased the Bidding Documents.
6. Bids must be delivered on or before December 10, 2012, 1:00-1:30 P.M. at DPWH
Conference Room, DPWH Regional Offce No. VII, South Road Properties,
Cebu City. All bids must be accompanied by a bid security in any of the acceptable
forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose to
attend at the aforesaid address. Late bids shall not be accepted.
7. The DPWH reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without thereby
incurring any liability to the affected bidder or bidders.
8. For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
(Sgd.) ATTY.AYAON S. MANGGIS
Caretaker, Administrative Division
BAC Chairman
(MST-NOV. 22, 2012)
Republic of t he Philippines
DEPARTMENT OF PUBLI C WORKS AND HI GHWAYS
OFFI CE OF THE REGI ONAL DI RECTOR
Regi on VI I
Sout h Road Propert ies (SRP), Cebu Cit y
Invitation to Bid
November 19,2012
The Department of Public Works and Highways through the Regular Infra CY 2013. Intends
to apply the sum of Php 68,757,000.00,Php 66,029,702.49 and Php 58,250,000.00 being
the Approved Budget for the Contract (ABC) for each project to payments under the contract
ID NOS. 13H00001, 13H00002 and 13H00003 respectively for the above stated projects.
Bids received in excess of the ABC shall be automatically rejected at bid opening.
1. The Department of Public Works and Highways now invites bids for the following
to wit;
13H00001-Php 68,757,000.00
Asphalting of Naga-Uling Road, Cebu Province
1. K0027+000-K0027+468
2. K0027+542-K0027+796
3. K0028+000-K0030+000
4. K0033+000-K0034+000
It involves asphalt overlay of 100mm for a total net length of 4.03 km.
Completion of Work is 100 C.D.
13H00002 -Php 66,029,702.49
Asphalting of Cebu North Hagnaya wharf Road, Cebu
1. K0031+400-K0032+000
2. K0032+427-K0032+538
3. K0033+(-469)-K0033+001
4. K0034+(-551)-K0035+854.33
It involves asphalt overlay of 100mm with correction for a total length of 3.97 km.
Completion of Work is 150 C.D.
13H00003-Php 58,250,000.00
Upgrading of Antequerra-San Isidro-Libertad (Tubigon) Road, Bohol
1. K0038+(-260)-k0040+206.07
Completion of Work is 180 calendar days
Bidders should have completed, within ten (10) years from the date of submission
and receipt of bids, a single contract similar to the Project, equivalent to at least
ffty percent (50%) of the ABC.
2. Bidding will be conducted through open competitive bidding procedures using
non-discretionary pass/fail criterion as specifed in the Implementing Rules and
Regulations (IRR) of Republic Act 9184 (RA 9184), otherwise known as the
Government Procurement Reform Act.
Bidding is restricted to Filipino citizens/sole proprietorships, partnerships, or
organizations with at least seventy fve percent (75%) interest or outstanding
capital stock belonging to citizens of the Philippines.
3. Interested bidders may obtain further information from DPWH-Region VII and inspect
the Bidding Documents at the address given below from 8:00 A.M. to 5:00 P.M.
4. A complete set of Bidding Documents may be purchased by interested Bidders
from the address below and upon payment of a non-refundable fee for the
Bidding Documents in the amount of Php50,000.00 for each project.
It may also be downloaded free of charge from the website of the Philippine
Government Electronic Procurement System (PhilGEPS) and the website of the
DPWH, provided that bidders shall pay the fee for the Bidding Documents until
10:00 A.M. on the day of submission of their bids-December 7, 2012.
5. The Department of Public Works and Highways will hold a Pre-Bid Conference
on November 26, 2012, 10:00 A.M. at DPWH Conference Room, DPWH
Regional Offce VII, South Road Properties, Cebu City which shall be open
only to all interested parties who have purchased the Bidding Documents.
6. Bids must be delivered on or before December 7, 2012, 1:00-1:30 P.M. at
DPWH Conference Room, DPWH Regional Offce No. VII, South Road
Properties, Cebu City. All bids must be accompanied by a bid security in any
of the acceptable forms and in the amount stated in ITB Clause 18.1.
Bids will be opened in the presence of the bidders representatives who choose
to attend at the aforesaid address. Late bids shall not be accepted.
7. The DPWH reserves the right to accept or reject any bid, to annul the bidding
process, and to reject all bids at any time prior to contract award, without
thereby incurring any liability to the affected bidder or bidders.
For further information, please refer to:
ENGR. ROSEMARY T. GEPTE
Head, BAC Secretariat
Department of Public Works and Highways Regional Offce VII
South Road Properties, Cebu City
(032) 411-6752
( Sgd.) ATTY.AYAON S. MANGGI S
Caret aker, Administ rat ive Division
BAC Chairman
(MST-NOV. 22, 2012)
CYAN MAGENTA YELLOW BLACK
Classifeds
ManilaStandardToday adv.mst@gmail.com NOVEMBER 22, 2012 THURSDAY
D4
Page Compositor: Diana Keyser Punzalan