CHECKLIST
CHECKLIST
CHECKLIST
BSS CHECKLIST
OK N.OK
Outdoor/Indoor installation
Proper Feeder Cable Routing
COMMENT
2 4 6 7 8 9 10 11 12 13 14 15
Antennas ( support, mounts and tightening) Standard Groundings Separation of AC Main from Feeders Route Position of Indoor Cooling System Space for Inlet of Feeder Window (roxtic) Band Sector Number of Antennas Number of TRXs Antenna Orientation (deg.)
Antenna Height (m) 900 MHz 1800MHz
Other information:
OK
N.OK
BOQ verification
COMMENT
1 2 3 4 5 6 7 8 9 10 11
Equipment condition (Old/New) All Boards as per BOQ Total No. of Slots for Dual Transceiver Cards(GSM 900) No. of Dual Transceiver Cards Installed(GSM 900) No. of empty Slots for Dual Transceiver Cards(GSM 900) Total No. of Slots for Dual Transceiver Cards(DCS 1800) No. of Dual Transceiver Cards Installed(DCS 1800) No. of empty Slots for Dual Transceiver Cards(DCS 1800) E1 signal transfer cable Space in Rectifier for additional equipment Site Configuration
Capacity Calculation:
* Each TRX has 8 TDMA timeslots and each time slot support one user Hence each TRX supports 8 users.
* In every Sector there is an BCCH TRX in which one time slot is used for transmitting BCCH. Hence a BCCH TRX supports 7 Users.
S.No
Capacity Calculation
Formulae
Physical Capacity of GSM 900 (No. of installed TRXs * 8) No. of Sectors (No. of installed TRXs * 8) No. of Sectors
** This is the physical capacity, and is calculated without considering other capacity increasing RF Techniques such as Half Rate TCH, EFR, AMR or any other technique to increase capacity.
ANNEX C
TRANSMISSION CHECKLIST
OK N.OK
BOQ Verification
Equipment Status(New/Used)
COMMENT
2 3 4 6 7 8 9
Type of the Site (Simple/Hub/Sub hub) Number of MW Antennas Installed Azimuths of MW Antennas Heights of MW Antennas Standard Antenna Assembly ODU Fastening and Grounding IF Cable Layout at Structure
10 11 12 13
Standard IF Cable Grounding IDU Fixing IDU grounding PSU and Battery Connections
ANNEX D RF CHECKLIST
OK
N.OK
COMMENT
1 Antenna Azimuth
3 Swapped Feeders/cells
7 Route Area as per plan 8 During stationary test, voice calls can be initiated in each cell, if not, provide details During stationary test, GPRS/EDGE FTP download successful, if not, provide details Intra site Handover Performance Inter site Handover Performance
9 10 11
OK
N.OK
Abnormal Events
Call Drops analysis
COMMENT
2 3 4