3G OPTIMIZATION - v2
3G OPTIMIZATION - v2
3G OPTIMIZATION - v2
3G OPTIMIZATION OVERVIEW
Network Optimization Capacity Management
Netact OSS
Performance Monitoring
NETWORK OPTIMIZATION
OBJECTIVE
Pilot Pollution
Poor Coverage
Optimum Area
Poor Coverage
No
Best servers CPICH RSCP> 95 dBm
Yes No
B C
Dominance Dominancearea area optimization optimization
Yes
4th Best servers Ec/No < 6 dB (ref to Best server)
No
Yes
BLOCK A
Task To identify area where RSCP is less than 95 dBm and to optimize the coverage of that affected area Reason Area where RSCP is less than 95 dBm and poor Ec/No value would be consider coverage problematic area or has poor coverage This would lead to call set up failure, HO failure, drop call and degradation to the PS throughput Items required for analysis RSCP and Ec/No plots for best server on map Plot of RSCP vs Ec/No to have quick understanding of the problem Measurement log files Solution Up-tilting, panning and height of antenna changes Increase CPICH power Antenna type changing to a higher gain Check missing neighbors Use NetAct to check coverage prediction by changing the inputs of the site Use the MapInfo/UMTS tool for antenna tilting to estimate coverage improvement (optional)
BLOCK B
Tasks To identify area which RSCP > -95 dBm but Ec/No < -10 dB and to optimize the affected area Reasons In this area problems are more on the dominance and pilot pollution This would lead to call set up failure, HO failure, drop call and degradation to the PS throughput Items required for analysis Plots of Ec/No and RSCP for best server on map Plots of Ec/No of each scrambling in the affected area Plots RSCP vs Ec/No Measurement log files Solution Down-tilting, panning and antenna height changes Increase CPICH of serving cell, decrease CPICH of interfering cells Check for missing neighbors Check co-scrambling code Change antenna type to lower gain
BLOCK C
Task To identify the 4th best server is < 6dB to the reference of best server and optimize the area Reasons To meet the KPI Too many best servers would cause unnecessary HO Wasting resources (hardware channels, Iub capacity etc) Item required for analysis Measurement log file Solution Down-tilting, panning and antenna height changed Increase CPICH of serving cell, decrease CPICH of interfering cells Use MapInfo/UMTS to generate the percentage Antenna type change to lower gain
CAPACITY MANAGEMENT
k= All _ Classes
k = All _ Classes
Call Setup Failure due to Radio Interface resource shortage would be triggered in RRC and RAB call setup failure cause AC
Example baseband configuration with 2 WSPC cards Associated dedicated channels are required for HSDPA users: 16 kbps DL for uplink power control and SRB and 64384 kbps UL channel for TCP ACKs and uplink user data and SRB HSDPA and associated DCHs effectively balance the baseband UL/DL resource consumption even if the traffic is DL oriented.
DL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
8 12 16 1 1 1 1 2 2 2 2
9 10 11 8 8 13 14 15 9 9 10 10 1 1 1 11 11 1 1 1 12 12 1 1 1 16 16 1 1 1 14 14 2 2 2 15 15 2 2 2 16 16 2 2 2 1 1 2 2 2 2 2
8 9 10 11 12 16 14 15 16 1 2
8 9 10 11 12 16 14 15 16 1 2
Common channels (for 3 carriers) HSDPA 5 codes HSDPA associated DCH (16 users, 16 kbps DL, 128 kbps UL) 384 / 64 kbps DCH users (2 users)
CODE_CAPACITY DENOM_CODE_CAPACITY
100[% ]
Possible Solution: The code tree is per cell per carrier. 1) 2) If available, go for a 2nd Carrier Add more sites (Macrosite, Microcell Site or In-building Site).
IuB INTERFACE(1)
AAL2 connections are allocated and released by ATM Resource Management which will check AAL2 reservation using CAC. M550 measurement reports RNC CAC resource usage for Iub AAL2 user plane traffic downlink
In RAS06, the new ATM Interface measurement (M532) gives indication of the ATM interface traffic load by reporting the traffic volumes and the bandwidth available for a specific interface. The measurement can also be used to detect interfaces that are congested and cause traffic loss. Congestion can be detected by following the number of ATM cells going in and coming out from the interface.
IuB INTERFACE(1)
Call Setup Failure due to Radio Interface resource shortage would be triggered in RRC and RAB call setup failure cause Transmission
WBTS
RNC
PERFORMANCE MONITORING
CELL AVAILABILITY
stop
FAILURE BREAKDOWN RAB SETUP Fail AC RAB SETUP Fail BTS RAB SETUP Fail Transport RAB SETUP Fail RNC RAB SETUP Fail Frozen BTS RAB ACC Fail UE RAB ACC Fail RNC
FAILURE BREAKDOWN RAB SETUP Fail AC RAB SETUP Fail BTS RAB SETUP Fail Transport RAB SETUP Fail RNC RAB SETUP Fail Frozen BTS RAB ACC Fail UE RAB ACC Fail RNC
ISHO NRT SR
100 * sum( SUCC_IS_HHO_UL_DCH_Q_NRT + SUCC_IS_HHO_UE_TRX_PWR_NRT + SUCC_IS_HHO_DL_DPCH_PWR_NRT + SUCC_IS_HHO_CPICH_RSCP_NRT + SUCC_IS_HHO_CPICH_ECNO_NRT + SUCC_IS_HHO_IM_IMS_NRT + SUCC_IS_HHO_EMERG_CALL + SUCC_IS_HHO_LB_PRX_TOT_NRT + SUCC_IS_HHO_LB_PTX_TOT_NRT + SUCC_IS_HHO_LB_RES_LIM_NRT + SUCC_IS_HHO_LB_RSVR_SC_NRT + SUCC_IS_HHO_SB_NRT) ---------------------------------------sum( IS_HHO_ATT_UL_DCH_Q_NRT + IS_HHO_ATT_UE_TRX_PWR_NRT + IS_HHO_ATT_DPCH_PWR_NRT + IS_HHO_ATT_CPICH_RSCP_NRT + IS_HHO_ATT_CPICH_ECNO_NRT + IS_HHO_ATT_IM_IMS_NRT + IS_HHO_ATT_EMERG_CALL + IS_HHO_ATT_LB_PRX_TOT_NRT + IS_HHO_ATT_LB_PTX_TOT_NRT + IS_HHO_ATT_LB_RES_LIM_NRT + IS_HHO_ATT_LB_RSVR_SC_NRT + IS_HHO_ATT_SB_NRT )
Use buildings and other environmental structures to isolate cell(s) coverage. Down tilt antennas to make cells dominant and limit effects of interfering cell(s). Check antenna bearing. Add a site.
Pilot Pollution
Find interfering cell from Scanner results. Adjust antenna bearing and down tilt or lower the antenna height (too much tilt will break the dominance). Add interfering cell to the neighbour of the serving cell. Check scanner data and look for missing neighbours. Check the cabling in antenna line.
Missing neighbour
The PrxTotal level is significantly higher than expected in no/low load conditions.
High Prxtotal due to Installation problems Bad RRC connection set-up success rate due to slow Ue cell reselection Long time interval for sync between RNC and BTS before connection
The PrxTotal level is significantly higher than expected in no/low load conditions. RRC connection set-up complete message not heard by BTS.
Set parameters so that reselection process will start earlier: Qqualmin, Sintrasearch and Qhyst2 as per latest recommendation
The value of Parameter N312 is too high: maximum number of in sync indications received from L1 during the establishment of a physical channel
Use smaller value N312 (2, recommendation is 4).Use call set-up time optimisation feature Dynamic setting of ActivationTimeOffset (possible in RAN1.5.2 ED2) enables 200 to 500ms reduction for set up delay.
Dropped call
Use cell individual offset (positive value) parameter to balance the DL and UL coverage.
Dropped call
Use cell individual offset (positive value) parameter to balance the DL and UL coverage.
NetAct OSS
CM OPERATIONS MANAGER
CM Operations Manager is for uploading managed objects, exporting actual configurations, import & export radio network plans, prepare & delete plans, pre-activate & activate planned configurations to network.
CM EDITOR
CM Editor is used to view actual radio network configuration, create, modify & delete plans, create templates, create managed objects, edit & mass edit parameter values of managed objects.
CM ANALYSER
CM Analyser can be used to perform checks or discrepancies on actual or planned radio network parameters to ensure parameters are defined according to consistency rules
REPORTING SUITES
Reporting Suites provide ready-made reports for analyzing the performance of the network. The reports are based on collected PM data and Nokia-defined KPIs and provide information on traffic, mobility, resources, signaling, security, subscriber, quality, charging, and Quality of Service.
REPORTING SUITES
R A N
R E P O R T S
REPORT BUILDER
Report Builder is a reporting tool for post-processing & visualization of data. It is used to for customized reporting & has been designed for creating and running a wide range of various reports on the performance data. The results are presented in graphical & excel format.
APPLICATION LAUNCHER
CALL FLOW
AMR MOC
MS RRC:RRC CONNECTION REQUEST NBAP:RADIO LINK SETUP REQUEST NBAP:RADIO LINK SETUP RESPONSE AAL2SIG: ERQ AAL2SIG: ECF RRC:RRC CONNECTION SETUP L1 synchronisation NBAP:SYNCHRONIZATION INDICATION RRC:CONNECTION SETUP COMPLETE RRC:INITIAL DIRECT TRANSFER (CM Service Request) RANAP:INITIAL UE MESSAGE (CM Service Request) RANAP: DIRECT TRANSFER (CM Service Accept) BTS RNC CS_CN
RRC: DOWNLINK DIRECT TRANSFER (CM Service Accept) RRC: UPLINK DIRECT TRANSFER (Setup)
RANAP:RAB ASSIGNMENT REQUEST NBAP:RADIO LINK RECONFIGURATION PREPARE NBAP:RADIO LINK RECONFIGURATION READY AAL2SIG: ERQ AAL2SIG: ECF AAL2SIG: ERQ AAL2SIG: ECF NBAP:RADIO LINK RECONFIGURATION COMMIT RRC: RADIO BEARER SETUP RRC: RADIO BEARER SETUP COMPLETE RANAP:RAB ASSIGNMENT RESPONSE
RRC: DOWNLINK DIRECT TRANSFER (Alerting) RRC: UPLINK DIRECT TRANSFER (Connect)
RANAP: DIRECT TRANSFER (Alerting) RANAP: DIRECT TRANSFER (Connect) RANAP: DIRECT TRANSFER (Connect Acknowledge) Call established
AMR MTC
MS RRC:PAGING TYPE 1 RRC:RRC CONNECTION REQUEST NBAP:RADIO LINK SETUP REQUEST NBAP:RADIO LINK SETUP RESPONSE AAL2SIG: ERQ AAL2SIG: ECF RRC:RRC CONNECTION SETUP L1 synchronisation NBAP:SYNCHRONIZATION INDICATION RRC:CONNECTION SETUP COMPLETE RRC:INITIAL DIRECT TRANSFER (Paging response) RANAP:INITIAL UE MESSAGE (Paging response) RANAP: DIRECT TRANSFER (Setup) BTS RNC RANAP:PAGING CS_CN
RRC: DOWNLINK DIRECT TRANSFER (Setup) RRC: UPLINK DIRECT TRANSFER (Call confirmed)
RANAP: DIRECT TRANSFER (Call confirmed) RANAP:RAB ASSIGNMENT REQUEST NBAP:RADIO LINK RECONFIGURATION PREPARE NBAP:RADIO LINK RECONFIGURATION READY AAL2SIG: ERQ AAL2SIG: ECF AAL2SIG: ERQ AAL2SIG: ECF NBAP:RADIO LINK RECONFIGURATION COMMIT RRC: RADIO BEARER SETUP RRC: RADIO BEARER SETUP COMPLETE RANAP:RAB ASSIGNMENT RESPONSE RRC: UPLINK DIRECT TRANSFER (Alerting) RANAP: DIRECT TRANSFER (Alerting) RANAP: DIRECT TRANSFER (Connect)
RRC: DOWNLINK DIRECT TRANSFER (Connect) RRC: UPLINK DIRECT TRANSFER (Connect Acknowledge)
PS DATA
MS RRC:RRC CONNECTION REQUEST NBAP:RADIO LINK SETUP REQUEST NBAP:RADIO LINK SETUP RESPONSE AAL2SIG: ERQ AAL2SIG: ECF RRC:RRC CONNECTION SETUP L1 synchronisation NBAP:SYNCHRONIZATION INDICATION RRC:CONNECTION SETUP COMPLETE RRC:INITIAL DIRECT TRANSFER (Attach Request) RANAP:INITIAL UE MESSAGE (Attach Request) RANAP: DIRECT TRANSFER RRC: DOWNLINK DIRECT TRANSFER (Attach Accept) RRC: DOWNLINK DIRECT TRANSFER (Attach Complete) RRC: UPLINK DIRECT TRANSFER (SM:Activate PDP Context request) RANAP: DIRECT TRANSFER (Attach Complete) RANAP: DIRECT TRANSFER (SM: Activate PDP Context request) RANAP:RAB ASSIGNMENT REQUEST RRC: RADIO BEARER SETUP RRC: RADIO BEARER SETUP COMPLETE RANAP:RAB ASSIGNMENT RESPONSE RANAP: DIRECT TRANSFER (SM: Activate PDP Context accept) (Attach Accept) BTS RNC PS_CN
RRC: DOWNLINK DIRECT TRANSFER (SM: Activate PDP Context Accept) RRC: MEASUREMENT REPORT NBAP:RADIO LINK RECONFIGURATION PREPARE NBAP:RADIO LINK RECONFIGURATION READY AAL2SIG: ERQ AAL2SIG: ECF NBAP:RADIO LINK RECONFIGURATION COMMIT RRC: TRANSPORT CHANNEL RECONFIGURATION RRC: TRANSPORT CHANNEL RECONFIGURATION COMPLETE Uplink and downlink data transfer
SHO
EVENT 1a
UE BTS RNC
UE
EVENT 1b
BTS RNC
SHO
EVENT 1c
UE BTS RNC
THANK YOU