General Description
26mNKTug
Principal Specification LOA: 26.0m LBP: 23.588m Breadth Mld: 8.0m Depth Mld: 3.65m Design Draft: 3.0m Classification: NK Complement: 10 person Registration: Singapore Fuel Tank Capacity: 134.0mt Water Tank Capacity: 53.0mt
Propulsion System Main Engine: 2 Units Yanmar 6AYM-ETE Marine Diesel; Engine at 610kW (829HP) at 1900RPM
Gear box: 2 Units Yanmar Gearbox Ratio 5.91:1 with class certificates
Deck Machinery and Equipment Anchor Windlass: 1 unit 380 model Dia. 17.5mm electrical hydraulic anchor windlass c/w double gypsy (based on class requirement)
Towing Hook: 1 unit c/w pin pulling quick release 25T-h capacity 25 Tons
Electrical
Page 1 of 5
All Electrical cables and accessories (switch boxes, bulbs etc.) will be of marine type. Running of Electrical cables installed in proper marine trunking
Stern Tubes and Shafting Water Lubrication Stern Tubes with BTC Flange cutless bearing C/W 2 Length stainless steel (AISI316) Tail Shaft Dia. 6-1/2
Pumps All pumps and piped were arranged in accordance to be installed in Good Marine Practice and Classification Requirement
G.S. and Fire Pump: 1 unit KOSHIN brand with motor KOSHIN brand of capacity 450L/min at 40m total head
Bilge & Ballast Pump: 1 Unit KOSHIN brand with motor KOSHIN brand capacity 450L/min at 40m total head
Fuel Transfer Pump:1 Unit ASAHI brand with motor ASAHI brand of capacity 100L/min
EmergencyPortable:2PortableYANMARDieselWaterPump
Wheelhouse Equipment Steering and control console fitted with instrument panel, main engine control (Electronic Remote Control Type), switches for navigation lights, searchlights, flood lights, horn buttons, intercom and PA system, rudder indicator, and clear view screen wiper. Control: 1x Fwd Clear View Screen: 1 unit Clinometer: 1 unit Marine Clock: 1 unit Barometer: 1 unit Ship Set Shaft Tachometer: 1 unit Binoculars: 1 unit International code flags: 1 set Chart Table: 1 unit Marine Air Horn: 1 unit
Radio and Navigation Equipment SSB radio: 1 set FURUNO IC-M710 c/w 1 Unit AC/DC power supply for SSB SART: 1 Set ACR Pathfinder 3 Echo Sounder: 1 Set FURUNO FVC-620 GPS Navigator: 1 Set FURUNO GP-32 EPIRB: 1 Set SEP-406 MHz SAMYUNG VHF Radio: 1 Set ICOM VHF Radio IC M304 c/w 1 Unit AC/DC Power Supply for VHF Radar AC/D: 1 Set Furuno 1715 MKII (24NM) c/w 1 unit AC/DC power supply for Radar
Ship Communication Electric Engine Telegraph: 1 set PA system: 1 set with Horn Speaker on deck Intercom: 3 Units Wall mounted Type
Navigation Lights, Fire Fighting Equipment and Life Saving Appliances AllinaccordancewithClassificationSocietysSpecificationandrequirementoftheGovernmentAuthorityfortheIntendedtradeofthe subject tug
Emergency Alarm System To be fitted with means of raising alarms in emergencies. The preferred system is bells operated by means of beak glass call poits or central control
Engine Room Oily Water Separator: 1unit Dongfang brand with capacity of 0.25cu.m/hr , 15ppm (IMO comply) Fuel Filter: 1 unit TWIN Racor for Main engine and Genset Blower Fan: 2 units with 3800cfm Filter (Main engine And Generator): 1 unit Tool Bench: 1 unit
Washplace & Toilet One wc pedestal with seat One shower set One washbasin One mirror
Page 2 of 5
Pumps, Plumbing and Piping All pumps and pipes were arranged in accordance to Good Marine Practice and Classification requirements
Main piping material used shall be as follow Bilge and Ballast Piping: Galvanized Steel SCH 80 Fuel Oil Piping: Seamless Black Mild Steel SCH 40 Lub Oil Piping: Seamless Black Mild Steel SCH 40 Raw Water Cooling Piping: Galvanized Steel SCH 80 Fresh Water piping: Galvanized Steel SCH 40 Salt water piping: Galvanized Steel SCH 80 Sea Chest: Galvanized Steel SCH 80
Pipe Work Colouring All exposed piping systems can be identified with colour bands in accordance with the international colour schemes Bilge and Ballast: Black Fire Main: Red Fresh water system cold: Blue Fresh water system hot: Blue with Red Bands Fuel Oil: Brown Lube Oil: Yellow Hydraulic: Purple Sea Suction: Green Sea Water Cooling: Light Green Compress Air: Pink
Accommodation and Galley Cabins: 1x2 on main deck; 2x4 below main deck W.C.: 1 VentilationFan:(2)8exhaustfan(2)18exhaustfan Side Scuttle: 7; each with dedlight cover Cement Flooring: reinforce with wire mesh finish with glaze tiles Freezer: 1 x 1.5 cbm Refrigerator: 1 x 1.0 cbm Electrical Stove: 1
Carpentry Work Fancy Plywood and Materials to be used for panelling accessories at wheelhouse, mess room, officers and crew cabin
Painting, Hull Finish and Cathodic Protection All external surfaces of bttom and side plating of the steel hull palte were wired brushed and sand-blasted before applying three (3) coat of marine paints of good ship building practice with Hempel Brand
Painting, Engine Room Bilges Hempel brand used as suitable protection paint for the engine room bilges and areas below engine floor
Hull Coat Below the waterline Above the waterline Wheelhouse Engine Room F.O. tank engine room Water tank (engine room)
Under Coat 2 2 1 1 2
External 2 (anti-fouling) 2 2 2 -
Material and Scantling Keel Plate: 12mm Bottom Plate: 9mm Side Plate: 9mm Main Deck Plate: 9mm Bulkheads Plate: 8/90mm Bulwark Plate: 8mm Superstructure: 6mm
Air Conditioning
Page 3 of 5
Certificates Builder Certificate Certificate of Class Registration Certificate Safety Construction Certificate International Tonnage Certificate International Load Line Certificate Materials and Equipment Certificates
Drawings The relevant drawings as approved by Class are to be supplied and all installation drawings
Manuals of Machinery and equipment Manual of all machinery and equipment supplied will be provided in English version. These include all necessary drawings and schematics