Hydraulic Calculation of Box Culvert: Wlu HC Hu C HLB Blu BLC WLC
Hydraulic Calculation of Box Culvert: Wlu HC Hu C HLB Blu BLC WLC
Hydraulic Calculation of Box Culvert: Wlu HC Hu C HLB Blu BLC WLC
WLc
WLu
Canal Name:
Structure No.
Chainage
Type
Hc
Hu
c
BLu
WLu
WLi
Hu
Hc
BLi
S
Hd
Upstream Canal
Approch Canal
4
hD 1:
Transition
La
Conduit
Lc
BLd
Stilling Basin
Lt
Downstream Canal
Ls
4.00 m
1 nos
Upstream Canal
Bottom Width
Side Slope 1:m
Water Depth
Water Surface Width
Flow Area
Velocity
Velocity Head
Energy Head
Inlet loss in the transition (hi)
dE = Eu - (Ei + hi)
Wetted Perimeter P = B + 2H(m^2+1)^0.5
Hydraulic Radius R = A/P
Roughness Coefficient
Roughness Coefficient K
Hydraulic Gradient I =[n V/R ^(2/3)]^2
Bu =
m=
Hu =
Wu =
Au =
Vu =
hvu =
Eu =
3.00
1.5
1.820
8.46
10.4286
1.030819094
0.054213674
1.874213674
9.562103321
1.090617791
0.014285714
70
0.00019317
Be =
m=
He =
We =
Ae =
Ve =
hve =
Ee=
ht =
Pe =
Re =
n=
K=
Ie =
4.2837854
Length of Transition
say Li =
note:
Design Discharge Q=
Conduit length Lc =
Drop Height Z WLo-WLd=
U/s Transition End
Conduit
Qi=Q/N =
ok
Pu =
Ru =
n=
K=
Iu =
5.00 m
4.00
1.5
1.8189
9.4567
12.23819582
0.87839745
0.039366433
1.858266433
0.015956918
-9.67696E-06
10.55813721
1.159124528
0.014285714
70
0.000129324
Bc =
m=
Hc =
Wc =
Ac =
Vc =
hvc =
Ec =
hi =
ok
Pc =
Rc =
n=
Ic =
WLb = BLb + Hn =
BLb = BLd - d =
10.75 m3/sec
16.00 m
2.08 m
Downstream Canal
10.75
4.00
0
1.7193
4.000
6.8772
1.56313616
0.124662993
1.843962993
0.030213238
3.74434E-05
7.4386
0.924528809
0.014285714
70
0.000553652
Bd =
m=
Hd=
Wd =
Ad=
Vd=
hvd=
Ed =
4.7822573
say Lo =
5.00 m
5.00 m
At E.P.of Conduit
At B.P.of Conduit Inlet
100.054 ELi = ELu - hi =
100.038 ELo = ELi - hf =
100.000 WLi = ELi - hvc =
99.914 WLo = ELo - hvc =
98.180 BLi = WLi - Hc =
98.194 BLo = WLo - Hc =
At B.P.of Down Stream Canal
ELd = WLd + hvd =
97.874
97.874 WLd = BLd+Hd=
97.820
95.500 BLd = BLd (input above)
96.000
0.001867054 m
0.014089864 m
0.2
0.561945576
0.242359316
0.030213238 m
3) Culvert conduit
Friction hf = LcIc =
0.008858433 m
4) Outlet transition
Friction hof=Lo(Ic+Id)/2 =
Divergence hod = x out(hvc-hvd) =
x out.=
sub-total
0.001867054 m
0.028179728 m
0.4
0.054862133 m
2.071445783
2.250 m
2.500 m
9.562103321
1.090617791
0.014285714
70
0.00019317
Id =
Lo = 2.14451 (Wc-Wd)/2
1) Inlet transition
Friction hif=Li(Iu+Ic)/2 =
Convergence hic =x in(hvc-hvu) =
x in.=
2) Inlet (Sudden contraction)
Ac/Ae
fsc
hi = fsc hvc
3.00
1.50
1.820
8.46
10.4286
1.030819094
0.054213674
1.874213674
ok
Pd =
dd =
n=
designed
5.00 m
Vc shall be in between "Vu" and 3.0 m/sec.
At B.P. of Culvert
ELu = WLu + hvu =
WLu = ELu - hvu =
BLu = WLu - Hu=
At Stilling Basin
Hd
x l'
BLd
Inlet Transition
Li
WLd
Hn
BLb
BLo
BLu
Upstream
Canal
BLc
WLd
WLo
H
HLb
Transition Angle
4.00
2.6875
0.903282556
2.975259493
0.451641278
1.354923834
a=
o
U/stream 27 30'
o
D/stream 25
At Drop Crest
100.029 ELc = WLc + hvc =
99.905 WLc= BLc + hc =
98.185 BLc = BLu =
Notch Elevation =
99.540
99.089
98.185
98.185
1.181452774
2.127514962 m
1.003715682
6.392246277 m
0.420431236 m
0.451641278
2.37
2.814807755
5.953792012
3.639550718 m
9.098876795 say 9.500 m
27.05707473
6.530945319
7.464238769
say 0.500 m
m
m
m
ok