I.P.R / EQUIPMENT (PIEU Methodology) : P (1 To 5) I (1 To 5) E (1 To 5) U (1 To 5)
I.P.R / EQUIPMENT (PIEU Methodology) : P (1 To 5) I (1 To 5) E (1 To 5) U (1 To 5)
I.P.R / EQUIPMENT (PIEU Methodology) : P (1 To 5) I (1 To 5) E (1 To 5) U (1 To 5)
UNIT : nb
COMMENTS backup equipmenet 650-2 but carefful with robot backup equipment 650-1 but carefful with robot backup equipment 1002 backup equipment 1001 backup solution with manual clipping backup equipmenent 1600 & 1300 KM backup equipment 1600 & 1300 Batt backup equipment 650-1 but carefful with robot backup for precision mix, robot, BUT NOT FOR OVEN, Make Up & conveyor Flaming backup in validation process backup equipment with gluing cabine W91 + pressure pot on P.L + pistols in stock backup solution with drying tunel W91 + ambiant air drying backup equipment with W91 covering backup equipment with W91 IR owen backup equipment with W91 IR owen backup solution with 100% manual edge folding backup solution with 100% manual edge folding Backup solution with REAR 5T press C394 => change tool is necessary & low capacity Backup solution with FRONT 5T press C394 => change tool is necessary & low capacity Backup solution with REAR Weld machine C394 => change tool is necessary & low capacity Backup solution with FRONT Weld machine C394 => change tool is necessary & low capacity backup solution with 100% manual edge folding backup solution with 100% manual edge folding backup solution with drying tunel C214 + ambiant air drying backup equipment with gluing cabine C214 + pressure pot on P.L + pistols in stock backup equipment with gluing cabine C214 + pressure pot on P.L + pistols in stock backup solution with drying tunel C214 + ambiant air drying backup equipment with C214 covering backup equipment with C214 IR owen backup equipment with C214 IR owen backup solution with 100% manual edge folding backup solution with 100% manual edge folding backup solution with 1 of the other welding machine W91 => Change tool is necessary & low capacity backup solution with 1 of the other welding machine W91 => Change tool is necessary & low capacity backup solution with 1 of the other welding machine W91 => Change tool is necessary & low capacity backup solution with 1 of the other welding machine W91 => Change tool is necessary & low capacity backup solution with 1 of the other 5T press W91 => Change tool is necessary & low capacity backup solution with 1 of the other 5T press W91 => Change tool is necessary & low capacity backup solution with 1 of the other 5T press W91 => Change tool is necessary & low capacity backup solution with 1 of the other 5T press W91 => Change tool is necessary & low capacity backup solution with 1 of the other press T7 => Change tool is necessary & low capacity backup solution with 1 of the other press T7 => Change tool is necessary & low capacity backup solution with 1 of the other press T7 => Change tool is necessary & low capacity backup solution with 1 of the other press T7 => Change tool is necessary & low capacity 5/19/2013 \\vboxsrv\conversion_tmp\scratch_3\146354441.xls.ms_office
UAP1
Painting line
11 gluing cabine C214 12 13 14 15 16 17 Drying Tunnel C214 Covering C214 I.R owen Front C214 I.R owen Rear C214 Front Umbuck C214 Rear Umbuck C214
18 FRONT 5T press C394 19 REAR 5T press C394 20 FRONT Weld C394 21 REAR Weld C394 22 23 24 25 FRONT Umbuck C394 REAR Umbuck C394 DRYING Tunel C394 OWEN C394
26 GLUE C394 27 gluing cabine W91 28 29 30 31 32 33 34 Drying Tunnel W91 Covering W91 I.R owen Front W91 I.R owen Rear W91 Front Umbuck W91 Rear Umbuck W91 Stamp machine W91
35 Welding n1 W91 36 Welding n2 W91 37 Welding n3 W91 38 Welding n4 W91 39 5T press n1 W91 40 5T press n2 W91 41 5T press n3 W91 42 5T press n4 W91 43 50T press n1 44 50T press n2
UNIT : /
E : Status of Equipment
0.01 1 2 3 Equipement to be renovated or reform Need to revise equipment Need to supervise equipment Status equipment ok
5/19/2013 \\vboxsrv\conversion_tmp\scratch_3\146354441.xls.ms_office
30
20 18 16 15 12 10 8 6 5 8 8 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 16 18 18 18 18
0.06 0
0.18
PROBLEM
CAUSE (S)
ACTION (S)
"Act" Deadlin Reali Valida Resp. (=effic es sed ted iency XC/JK L.S XC/OV XC/JK W747 W74 W747
Define spare parts & buy them Apply 1st level maintenance Apply preventive maintenance Define spare parts & buy them
1.2
Apply 1st level maintenance Apply preventive maintenance Preventive contract with HILL & IPROS Plan predictive maintenance (vibratory analysis & infrared thermography) Define spare parts & buy them
L.S XC/OV always ok ok XC W46 W46 W46 T1-2008 XC XC/JK L.S XC/OV W747 W74 W747 7 ok
2. W91 : STAMP machine (cutting sunblind) 2-Jan No backup solution in case of breakdown during 4 days => risk to stop final customer too expensive to have 1 in backup
always ok
X.C