CPSM Exam Spec Bridge
CPSM Exam Spec Bridge
CPSM Exam Spec Bridge
Bridge Highlighted
Page 1
2013
Page 2
2013
A) B) C) D) E) F) G) H) I) 1-A-2 Contracting and Negotiation Prepare for and develop strategies and tactics for negotiations, including definition of roles and responsibilities of team members.
Time extensions and amendments to solicitation Late bids (w/o time extensions) Offers with errors, irregularities or omissions Conflicts of interest Protests Confidentiality/Security Alternate proposals Debriefing process Procedures for cancellation of solicitations
Knowledge of: 1) Preparations for negotiations A) Negotiation objectives 1.0 Fair and reasonable price 2.0 Timely performance 3.0 Meeting the minimum essential needs of the organization 3.1 Defining must-haves and wants 4.0 Control over how the contract is performed 5.0 Maximum supplier cooperation 6.0 Sound relations with suppliers B) Negotiation site C) Team selection D) Relevant information (e.g., proposals, learning curves, backgrounds of players) E) Analysis of seller's and purchaser's positions 1.0 Seller's desire for a contract 2.0 Seller's certainty of getting a contract 3.0 Amount of time for negotiation 4.0 Adequacy of cost/price analysis 5.0 Best Alternative to a Negotiated Agreement (BATNA) 6.0 Seller's competitive position (sole source or otherwise) 7.0 Skill and authority level of the negotiator/negotiation team 8.0 Extent of planning for the negotiation 9.0 Sellers financial condition 10.0 Buyers financial condition F) Market and product conditions G) Development of strategies and tactics H) Cultural factors I) Fall-back alternatives 2) Negotiation philosophies A) Win-Win/Cooperational B) Win-Lose/Adversarial/Competitive C) Lose-Lose/Confrontational Knowledge of: 1) Negotiation tactics 2) Special considerations in conducting negotiations A) Fact-finding sessions B) Final proposal revisions C) Negotiating with sole offeror vs. entire competitive range D) Documentation of negotiation E) Negotiations as a consortium or cooperative Knowledge of: 1) Elements of a contract A) Offer and acceptance 1.0 Counter offers 2.0 Acknowledgment B) Consideration C) Competent parties
1-A-3
1-A-4
Page 3
2013
D) Legality of purpose 2) Types of obligation documents A) Written vs. oral contracts 1.0 Reasons for written contracts 2.0 Circumstances where oral contracts are acceptable 3.0 Electronic 3.1 Trading partner agreements 4.0 Statute of Frauds 3) Purchase orders 4) Letters of intent A) Purpose B) Types 1.0 Binding 2.0.Nonbinding 5) Contract/agreement types A) Fixed price 1.0 Firm fixed price 2.0 Fixed price with escalation 3.0 Fixed price with redetermination 4.0 Fixed price with incentive 5.0 Fixed price level of effort 6.0 Fixed price with downward price protection 7.0 Fixed price with remedies B) Cost reimbursable 1.0 Cost plus fixed fee 2.0 Cost plus percentage of cost 3.0 Cost plus incentive fee 4.0 Cost plus award fee 5.0 Cost without fee 6.0 Cost sharing C) Indefinite delivery contracts 1.0 Indefinite delivery/Indefinite quantity 2.0 Task order and delivery order 3.0 Time and material contracts 4.0 Blanket agreements 5.0 Requirements contracts D) Letter contracts E) Dealers agreement F) Service agreements 1.0 Master service agreements 2.0 Professional service agreements 3.0 Maintenance agreements 4.0 Performance Based Agreements G) Licensing agreements 1.0 Software 2.0 General 3.0 Technology H) Master purchase agreements ( e.g.,, IT hardware, desktop, supplies, materials) I) Construction contracts (American Institute of Architects, Americans with Disabilities requirements) 6) Purchase order confirmations and acknowledgments A) When to use B) Unilateral vs. bilateral instruments C) Exceptions to terms and conditions 1.0 Seller's exceptions to purchaser's items 2.0 Purchaser's exceptions to seller's items
Page 4
2013
7) Considerations in preparing obligation documents A) Intellectual property 1.0 Patents 2.0 Copyrights 3.0 Trademarks 4.0 Licensing 5.0 Confidentiality B) Royalties C) Consideration of domestic and international laws 1.0 Convention for the International Sale of Goods (CISG) D) Advance notification and consent to subcontract E) Notice of awards F) Payment terms G) Insurance and Indemnification H) Termination and Exit Clauses I) Customer confidentiality (GLBA) J) Force majeure K) Restraint of trade issues L) Security Issues (e.g.,, Homeland Security) M) Assignability provisions N) Source code escrow accounts O) Protests P) Claims Q) Limitation of liability R) Waiver of consequential damages S) Collusive offers T) Suspension U) Reservation of Rights V) Estoppel W) Social responsibility issues X) State of domain/Jurisdiction Y) Liquidated damages Z) Prime Contractor Flowdowns AA) Warranties BB) Remedies 8) Statements of Work A) Work breakdown structure B) Hold points/Milestones C) Performance evaluation factors 1-A-5 Contracting and Negotiation Administer contracts/purchase orders from award to completion or termination. Knowledge of: 1) Contract Administration Concepts A) Work Control B) Compliance C) Financial responsibility D) Approving systems E) Administrative responsibilities 1.0 Price adjustment clauses 2.0 Administration of change orders F) Contract terms and conditions G) Documentation requirements H) Contract close-out 2) Supplier management concepts A) Statement of Work B) Annual Work Plan C) Standards of performance D) Supplier feedback E) Supervision of supplier 1.0 On-site
Page 5
2013
F) G) H)
2.0 Remote Management by exception Progress reports Customer feedback 1.0 Internal 2.0 External
3) Conflict/dispute resolution 4) Termination options 1-B-1 Cost-Finance Prepare and/or administer a supply management department budget. Knowledge of: 1) Budgetings relationship to the strategic and operational plans 2) Steps in budgeting A) Review goal and objective alignment B) Define needed resources (e.g., personnel, equipment, furnishings, training) C) Estimate the dollar value of resources D) Present the budget/ obtain the appropriation E) Variance analysis 3) Purposes for a budget A ) Control of expenditures B) Pre-approved funding C) Monitoring of expenditures D) Development of standard costs 4) Types of budgets A) Zero-based budget B) Cash-flow budgets C) Line item D) Program/Project E) Capital F) Flexible 1-B-2 Cost-Finance Develop a cost management program strategies for purchases. Knowledge of: 1) Cost savings A) Cost avoidance/containment B) Cost reduction 2) Issues to be considered when establishing a cost management program A) Status of the standardization program B) Coordination with other departments C) Time requirements D) Effect on quality and service E) Effect on operations F) Calculating cost avoidance/reduction G) Market testing H) Top management support I) Design flexibility J) Product longevity K) Consumption management 3) Value analysis/value engineering processes A) Process B) Techniques C) Organizational requirements D) Function in relation to cost and quality 4) Cost modeling
Page 6
2013
5) Standard cost setting 6) Product cost roll up 7) Margins 8) Contribution to profit 9) Cost of quality 10) Cost of inventory 11) Intangible costs 12) TCO 13) Other forms of cost management A) Improved form, fit and function B) Easier use C) Administrative savings D) Improved quality 1-B-3 Cost-Finance Identify savings potential and opportunities and strategies for specific categories through spend analysis. Knowledge: 1) Sources of Spend data (i.e., P-card, purchasing records, business warehouse, etc.) 2) Data mining tools 3) Cost baseline A) Forecasting future utilization and spend B) Cost savings vs. cost avoidance C) Budget reduction D) Current/historical then determine future budget forecasting 4) Awareness of implementation process 5) Segmentation/categorization of spend 1-B-4 Cost-Finance Perform cost/benefit analyses on acquisitions. Knowledge of: 1) Definition of "total cost of ownership" A) Unit total cost B) Life cycle cost C) Landed cost D) Total cost of performance for services 2) Direct costs 3) Indirect costs A) Fixed B) Variable C) Semi-Variable 4) Carrying costs 5) Should Cost 6) Target Cost 7) Relevant vs. irrelevant costs 8) Overhead
Page 7
2013
A) B)
9) Opportunity costs 10) Financial analysis A) Return on Investment B) Return on Assets Employed C) Return on Total Assets D) Margin Analysis E) Profitability F) Cash Flow G) Balance Sheet H) Profit and Loss 11) Lease / Buy Analysis A) Types of Leasing Arrangements 1.0 Operating Lease 2.0 Financial Lease 2.1 Full Payout 2.2 Partial Payout 2.3 Lease/Purchase 3.0 Leveraged Lease 4.0 Master Lease 5.0 Wet Lease/Dry Lease 6.0 Sale and Leaseback B) Factors in a Lease/Buy Decision 1.0 Financial factors 1.1 Inflation 1.2 Capital Budget considerations rd 1.3 3 party reimbursement 1.4 Interest rates 1.5 Balance sheet considerations 1.6 Cash flow analysis 1.7 Depreciation 1.8 Tax considerations 1.9 Residual value 1.10 Payment schedules 2.0 Operational factors 2.1 Obsolescence 2.2 Maintenance services 2.3 Administrative overhead 2.4 Operating costs 2.5 Life of the Asset 2.6 Customization 2.7 Term of the Lease 3.0 Other factors 3.1 Ownership benefits 3.2 Limitation of sources of supply 3.3 Early termination 3.4 Insurance 3.5 Organization policy 3.6 Emergency situations C) Legal/accounting considerations 1.0 Uniform Commercial Code 2A Leasing 2.0 FASB-13 3.0 Sarbanes-Oxley (off balance sheet transactions, etc.) 1-B-5 Cost-Finance Develop financing and leveraging strategies for purchases. Knowledge of: 1) Cash Flow
Page 8
2013
2) Interest Rates 3) Payment Terms 4) Depreciation 5) Market Conditions 6) Commodity Markets 7) Bond & Currency Markets 8) Regulations 9) Tax Laws 10) Import/Export Quotas 11) Supplier Financing 12) Equity Investment 13) Centralized Buying 14) Lead Division Buying 15) Cooperative Purchasing 16) Consortia 1-C-1 International Identify and assess international markets to source goods and services. Knowledge of: 1) Cultural awareness 2) Issues in global business A) Organizational global strategy B) Global macro and micro economic concepts C) Organization structure and dynamics D) Global marketing E) Country specific accounting standards and practices F) Human Resource management 1.0 Labor skills 2.0 Labor practices 3.0 Human rights 4.0 Cultural Differences G) Corporate governance issues H) Legal implications (e.g., contracting) I) Intellectual property J) Brand management 3) Infrastructure A) Technology B) Transportation C) Governmental stability 4) Risk assessment 5) Cost benefit and opportunity analysis Knowledge of: 1) Research and benchmarking of potential global suppliers 2) Interpersonal skills when working with other cultures
1-C-2
International
Page 9
2013
3) Cultural awareness 4) Financial issues A) Landed cost analysis B) Exchange rates C) Payment mechanisms D) Taxes E) Fees F) Tariffs G) Duty drawback 5) Development of a business case/plan A) Supplier relationship model B) In-country partners 6) Contingency plans and exit strategies 7) Country specific governmental regulations (e.g.,, customs, import/export) 8) Brokers/import merchants 9) Trade networks/Trading Companies 10) Logistics providers
1-C-3
International
Knowledge of: 1) Federal regulations pertaining to restricted parties and countries 2) Customs requirements 3) Broker arrangements
1-D-1
Social Responsibility
Develop and act upon a code of business conduct for the supply management function and external suppliers.
Knowledge of: 1) ISM Principles and Standards of Ethical Supply Management Conduct 2) ISM Principles of Social Responsibility A) Community B) Diversity C) Environment D) Ethics E) Financial responsibility F) Human rights G) Safety 3) Organizational policies 4) Industry codes of conduct 5) International issues A) United Nations The Nine Principles of the Global Compact 6) Communication and training to key stakeholders 7) Laws governing issues in ethics A) Libel B) Slander C) Disparagement D) Bribery
Page 10
2013
8) Customer driven requirements 1-D-2 Social Responsibility Establish and monitor environmentally responsible and compliant programs throughout the supply chain and lifecycle. Knowledge of: 1) Environmental laws/regulations A) At source B) In transit C) At destination 2) Risk transfer A) Contractual B) Insurance C) Legal 3) Ethical issues 4) Audit A) Internal B) Supply chain C) Reporting 5) Organization values and policies 6) ISM Principles of social responsibility and audit 7) Buyrecycled programs 8) Minimization of waste A) Reduce B) Reuse C) Recycle 9) End of life cycle A) Disposal Options B) Sell to another organization 1-D-3 Social Responsibility Implement, monitor and promote organizational and supply chain safety policies and procedures. Knowledge of: 1) Laws and regulations A) Applicable laws (Federal, State, Local, International) B) Personal liability C) Organizational liability D) Department of Transportation/or other countrys equivalent E) Department of Homeland Security/or other countrys equivalent 2) Policies and procedures A) Employee safety 1.0 Training requirements 2.0 Personal Protection equipment 3.0 MSDS/posting requirements B) record retention C) Industry Best Practice D) Storage Requirements 3) Supplier and subcontractor safety (e.g., safety history) A) Audit and review B) Training 4) Customer-driven requirements 1-E-1 Sourcing Analyze potential sources of goods/or Knowledge of: 1) Supply Base Analysis
Page 11
2013
services.
A)
Degrees of Competition 1.0 Full and open competition 2.0 Limited competition 3.0 Technical competition 4.0 Single Source 5.0 Sole Source 6.0 Multiple Source
2) Nature of Sources and Their Effects On Procurement A) Manufacturers vs. Distributors B) Large vs. Small Suppliers C) National vs. Local Suppliers D) International vs. Domestic Suppliers 1.0 Exchange Rates 2.0 Payment Processes 3.0 Duties 4.0 Transportation costs and timing 5.0 Applicable laws E) Mandatory sources of supply F) Emergency sources G) Small and historically underutilized businesses (HUB, WOB, VOB, MOB) H) Cooperative/consortium buying I) Joint ventures J) Internal vs. external sources 3) Existing vs. New Sources A) Market Conditions B) Product Complexity/Technology changes C) Urgency of Need D) Quality expectations E) Supplier processes F) Adequacy of competition G) Cost versus value of sources H) Long-term needs I) Long-term relationships J) Supply base optimization K) Change in supplier's organization L) Supply continuity M) Internet Based Searches 1.0 Meta database search (e.g., Google, Dogpile, etc.) 2.0 Online buying guides N) Trade shows/periodicals O) Peer benchmarking 1-E-2 Sourcing Evaluate competitive offerings to determine the overall best offer for a product/service. Knowledge of: 1) Decision matrix/multi-attribute evaluation tool 2) Receiving, controlling and analyzing offers 3) Offer responsiveness A) Specifications/statements of work B) Quality requirements C) Terms and conditions D) Product/service substitutions E) Use of technical proposals (unpriced) 4) Technical analysis 5) Operational analysis A) Site Audits
Page 12
2013
6) Cost and price analysis A) Price analysis methods 1.0 Market benchmarking B) Profit analysis C) Savings analysis D) Total cost vs. price 1.0 Learning curve 2.0 Life-cycle costing E) Cost analysis 7) Offeror capability/Offeror responsibility A) Past performance B) Capacity C) Skills D) Integrity E) Time in business/market F) Certification and licensing G) Financial factors H) Reference Checking 8) Transportation terms A) International transportation terms (Incoterms rules) B) Domestic transportation terms 9) Other factors A) Availability B) Lead time C) Logistical concerns D) Supplier diversity considerations E) Business continuity plans F) Information security Knowledge of: 1) Buying strategies A) Spot buying B) Buying to requirements C) Forward buying D) Speculative buying E) Volume Purchase Agreements F) Life-of-product supply G) Just-In-Time H) Consignment I) Commodities 1.0 Market dynamics 2.0 Exchanges 3.0 Terminology J) Supplier replenishment systems K) Outsourcing 2) Financial Tools A) Hedging B) Dollar averaging C) Contracting 3) Forecasts of volume A) Determining annual requirements B) Part (or Product) life cycle C) Supply markets relative to short and long-term buying needs 4) Factors in the selection of the method of procurement A) Degree of competition/Market situation B) Industry norms and standards
1-E-3
Sourcing
Plan and communicate sourcing and supply strategies based on forecasted data.
Page 13
2013
1-F-1
C) Urgency D) Dollar value E) Nature of product/service specifications F) Type of contract desired G) Frequency of purchases H) Risk I) Customer requirements J) Lead time K) Level of flexibility desired L) Buyer/seller uncertainty Knowledge of: 1) SWOT analysis 2) Data mining tools 3) Supply base rationalization 4) Supplier categories A) Approved suppliers B) Preferred suppliers C) Partnered suppliers D) Certified suppliers E) Pre-qualified suppliers F) Certifiable suppliers G) Disqualified suppliers H) De-barred suppliers I) Diverse suppliers 5) Knowledge of supplier segmentation
1-F-2
Knowledge of: 1) Benefits of good supplier relations 2) Confidentiality Policies A) Typical Policies regarding the possession use and return/disposition of suppliers property (intellectual and physical) B) Organizational Policies for suppliers regarding your IP 3) Ways of promoting good relations and trust A) Top management meetings B) Relations between suppliers and customer functions C) Timely payment of invoices D) Equitable treatment of suppliers E) Periodic supplier surveys F) Enhanced two-way communication G) Supplier training H) Team building I) Supplier development J) Periodic business reviews 4) Issues in supplier product education and involvement A) Advantages B) Possible problems C) Site visits D) Supplier Days/ Forums 5) Issues in reciprocity A) Legality B) Impact on suppliers and buyers C) Domestic vs. international
Page 14
2013
6) Concepts of continuous improvement A) Quality B) Cost C) Design D) Service E) Cycle time reduction 7) Supplier partnerships/Strategic alliances A) Rationale B) Methods for identifying potential alliances C) Forms of alliances D) Developing alliances E) Maintaining/sustaining alliances F) Concluding alliances G) Supplier certification issues 8) Reverse marketing/supplier development 9) Supplier mentorship 10) Early supplier involvement A) New product development B) Development cycle reduction time C) Co-located engineering 11) Supply chain management A) Definition B) Potential benefits C) Risk management D) Role of supply management E) Multi-Tier Purchasing Agreements F) Value Chain Analysis and Process Improvement 12) Supply base innovation A) Managing differences B) Managing breakthroughs C) Managing decision making D) Managing transformation 1-F-3 Supplier Relationship Management Develop/implement a supplier diversity program. Knowledge of: 1) Rationale in developing programs A) Organizational policies B) Impediments C) Benefits D) Assessing program goals E) Disparity studies F) Customer-driven requirements G) Subcontracting plans 2) Sources of information on socially or economically disadvantaged suppliers/ Historically Underutilized Businesses/or other countrys equivalent A) Small Business Administration B) Minority/Women Business Development Agency C) Business directories D) Minority/Women Business Development Councils E) Local minority/women chambers of commerce F) Business fairs 3) Small Business/Small Disadvantaged Business (SB/SDB) Requirements A) Certification
Page 15
2013
B) Registration C) Applicable Classifications 4) Program Elements A) Top management support B) Company policy C) Program coordinator D) Buyer diversity goals 1-F-4 Supplier Relationship Management Develop new supplier qualification plans and reports to assure components, materials and suppliers meet specified requirements (regulatory, safety, reliability, quality). Knowledge of: 1) Customer communication/CRM 2) Supply chain mapping 3) Quality systems 4) Logistic systems 5) Financial analysis 6) Methods of requirements gathering 7) Supplier evaluation measures 1-F-5 Supplier Relationship Management Conduct supplier performance evaluations. Knowledge of: 1) Factors used to analyze a supplier's ability to perform A) Capacity and utilization B) Delivery C) Quality history D) Contractor's "make or buy" program E) Cycle/lead time F) Productivity G) Flexibility H) References I) Electronic capabilities J) Breadth of product line K) Customer/prime requirements 2) Issues in conducting site visits A) Reasons for conducting visits B) Costs vs. benefits of visits C) Site inspection team D) Factors appraised at site visits 1.0 Housekeeping 2.0 Process/material flow 3.0 Employee morale 4.0 Measurement of KPIs E) Timing of visits F) Performance audits, documentation and metrics 3) Evaluate changes within supplier organization 1-F-6 Supplier Relationship Management Develop and execute supplier exit strategies. Knowledge of: 1) Internal considerations A) Stakeholders B) Timing C) Assets (e.g., inventory, tooling, capital equipment, IP) D) Documentation 2) External considerations A) Contractual B) Customer requirements
Page 16
2013
C) D)
Supplier certification status Assets (e.g., inventory, tooling, capital equipment, IP)
Page 17
2013
Page 18
2013
J)
Exchange rates
3) Sources of data used in forecasting A) ISM Report On Business Manufacturing and Nonmanufacturing B) Government publications (International and U.S. Domestic) 1.0 Survey of Current Business 2.0 Federal Reserve Bulletin C) Private Publications D) Commercial Forecasts E) Regional Surveys F) Internal historical data G) Industry sources H) Online indices and search engines 4) Forecasting methodologies/techniques A) Short term vs. long term forecasting B) Macro vs. micro forecasting C) Delphi Method D) Correlation/regression analysis E) Time series F) Central tendency G) Variability H) Analysis of Cyclical Data I) Trend Analysis J) Decision tree analysis 5) Factors that can affect forecasts A) Fluctuating lead times B) Changing labor conditions C) Changes in money markets D) Political factors E) Technological shifts F) Climatic conditions G) Changes in global trade 2-A-3 Forecast Manage forecasted data with suppliers. Knowledge of: 1) Elements of Early Supplier Involvement (ESI) A) Manufacturing process B) Capital acquisitions budget C) Product or service development/implementation D) Cost E) Quality F) Availability G) Technology H) Design I) Product co-development J) Cycle time 2) Business forecasting models 3) Confidentiality issues 4) Parameters for disclosure A) Product Development Model B) Production Plan 5) Legal implications 6) Vendor managed inventory (VMI) 7) 7) Collaborative Planning Forecasting and Replenishment (CPFR)
Page 19
2013
8) 8) Product Life Cycle 9) Information Exchange options 2-B-1 Logistics Design/modify logistics facility layouts and equipment designs to support business model, increase productivity and lower operating costs. Knowledge of : 1) Considerations for Geographical location A) Labor considerations B) Transportation availability considerations C) Governmental issues 1.0 Political 2.0 Tax considerations D) Environmental considerations E) Channel proximity/modality considerations F) Average delivery time G) Build out vs. build up H) Two dock vs. single dock layout I) Safety considerations J) Security K) Sanitation L) Warehouse material handling systems (e.g., facility consideration re: forklifts, pickers, etc.) 2) Order picking vs. stock replenishing functions 3) Labor intensive vs. mechanized A) Automation B) Picker to part vs. part to picker 4) Virtual warehouse vs. real warehouse 5) Logistics performance measures, strategies and cost savings initiatives A) Cost-to-sales ratios B) Logistics cost per unit vs. budget C) Cost of functions as a percent of sales D) Inventory turns (e.g.,, Sales/inventory, CGS/Inventory) 6) Third-party logistics considerations 7) Scorecards 8) Process improvement action plans 2-B-2 Logistics Direct traffic/distribution policies and procedures to ensure optimum flow of material and consolidation of freight. Knowledge of : 1) Policies and Procedures A) Transportation modalities B) Transportation restrictions C) Carrier cost auditing D) Carrier performance auditing E) Freight classifications/Rates F) Available technology G) Relocation or movement processes
2-B-3
Logistics
Manage international Knowledge of: transportation, invoicing 1) 1) Characteristics of various modes of transportation and documentation functions to ensure 2) Roles of shipping companies, customers, suppliers and freight corporate compliance forwarders with all governmental 3) Import/export documentation import, export, hazmat 4) Traffic patterns and air freight regulations
Page 20
2013
7) C-TPAT (Customs-Trade Partnerships Against Terrorism) 8) 9) 2-B-4 Logistics Manage the resolution of delivery/receiving problems including freight loss and damage claims. Cost/Mode trade-offs Multimodal Shipments
Knowledge of: 1) Freight terms (domestic and international) 2) 3) 4) 5) 6) Delivery tracking systems Delivery performance measurements Visible vs. latent damage Rules for freight claims Resolution processes A) Escalation B) Corrective action Freight audit procedures
7) 2-C-1 Materials and Inventory Management Develop/implement a material and/or service standardization program.
Knowledge of: 1) General issues in standardization and simplification A) Advantages and disadvantages B) Procedures/Steps in applying 1.0 Standardization committees 2.0 Involvement of other departments 3.0 Effects on production methods/operations 4.0 Effects of global operations C) Applications to 1.0 High-use or high-volume items 2.0 Procurement of facilities 3.0 Procurement of MRO items 4.0 Procurement of services D) Brand names vs. generic names E) Cost-benefit analysis pertaining to standardization 2) Sources of standards A) Internal organization B) Government (e.g., National Institute of Standards and Technology) C) International (e.g., ISO) D) Industry/associations (e.g., ANSI)
2-C-2
Knowledge of: 1) Physical Tracking Systems A) RFID B) Bar code C) UID Unique Identification Device / IUID Item Unique Identification Device (DoD initiative) 2) Overall Project Plan A) Plan for business continuity B) Implementation plan C) Manpower & equipment requirements D) Facility design
Page 21
2013
E) F) 3) 4) 5)
Customer requirements Cost considerations Available technology for Warehouse Management System (WMS) A) SWOT analysis
6) Warehouse management A) Structures B) Storage location C) Replenishment systems D) Inventory classification systems E) Cycle counting F) Perpetual 7) Inventory Accuracy and Inventory integrity A) SKU Establishment B) Physical Inventory C) Cycle Counting D) Reconciliation E) Shrinkage F) Issue/Return G) Recoup H) Inventory Consolidation I) Security J) Inventory policies/procedures K) Location of materials (e.g., secure storeroom, outside yard storage etc.) 2-C-3 Materials and Inventory Management Coordinate and/or monitor the movement of equipment and assets within the organization. Knowledge of: 1) Organizational policy for asset classification 2) Physical tracking systems (bar coding, asset tags, s/ns, RFID) 3) Financial tracking systems A) Capital equipment B) Software tracking system 4) Internal distribution (,e.g., distribution channels) A) Internal transportation 5) Types of equipment and assets. (e.g., cars, airlines, railroads, copiers) 6) Asset management A) Inventory management B) Asset recovery 2-C-4 Materials and inventory management Develop, oversee and execute multi-channel disposition plan for excess inventory and finished goods. Knowledge of: 1) Investment Recovery Principles A) Value Stream Mapping B) Security of disposal 2) Market place for disposal A) Broker B) Dealer C) Third-party specialist
Page 22
2013
3) Categories A) Surplus B) Obsolete C) Damaged 2-D-1 Organization/ Department Assessment Monitor work against business plans and take action to resolve variances or adjusts plans as appropriate. Knowledge of: 1) Performance Measurement Processes A) What to Measure B) Measurement Creation C) Results Evaluation (Signal vs. Noise?, key stakeholders) D) KPI Key Performance Indicators E) Performance Management Systems (e.g., EVMS Earned Value Management System, balanced scorecard, value stream F) Corrective Action Process Knowledge of: 1) Issues in the evaluation of employees A) Align employee objectives to organizational goals B) Determine criteria for success C) Determine appraisal factors 1.0 Quantitative Factors 2.0 Qualitative Factors D) Conduct interviews/Give feedback E) Sources of feedback 1.0 Team and/or peer input 2.0 Self-assessment 3.0 Internal customer input 4.0 Supplier input F) Employee accountability (e.g., performance improvement plan) Knowledge of: 1) Creation of measurements A) Audit processes B) Validation process C) Reporting requirements D) Remediation E) Training 2) Compliance metrics A) Organizational Policies (e.g., supplier diversity, social responsibility) 2-D-4 Organization/ Department Assessment Analyze and resolve issues raised in supply management audit reports. Knowledge of: 1) Types of audits (e.g., ISO, GAAP, SOX) 2) Measurement of change initiatives 3) Validation of current policies, procedures, work instructions and forms 4 ) Corrective action process A) Establishment of time frames B) Prioritization C) Cost/benefit analysis 5) Audit schedules and reports 2-E-1 Planning Implement or utilize requirements planning Knowledge of: 1) Key principles of xRP
2-D-2
2-D-3
Develop tools and processes to measure, report and improve compliance with supply management policies.
Page 23
2013
(xRP e.g., ERP, MRP, MRP II DRP, DRP II, WMS) to align supply management and operations activities to support organizational strategy
A) Enterprise integration B) Data source consolidation C) Information sharing 2) System Development Life Cycle (SDLC) A) Analysis B) Design C) Development D) Testing Knowledge of: 1) Forecasting models/methodologies: A) Least squares/regression model B) Box Jenkins C) Winters Model D) Judgment Sampling E) Future sales based on past sales 2) Measures of forecast accuracy A) Standard error rates B) Mean squared error C) Mean percentage error 3) Replenishment/Priority Tools A) Vendor Managed Inventory B) ABC Analysis/classification C) Reorder point systems D) Fixed Order period E) Fixed Order Quantity F) Kanban G) Buffer/Safety Stock H) Obsolete/damaged/slow moving 4) Scheduling processes A) Flow Manufacturing B) Level scheduling C) Packaging optimization D) Shared visibility into Inventory (your organization, Customer and Supplier) E) Bull whip affect 5) Capacity utilization techniques A) Sales Forecasts B) Implementation schedule
2-E-2
Planning
Develop, implement, maintain and monitor the forecasting, operations planning, scheduling and inventory control functions to ensure optimum use of capacity and resources.
2-F-1
Product Development
Participate in product/service development or specification/requirement changes that support organizational merchandising and marketing efforts to meet customer needs.
Knowledge of: 1) Product development process A) Customer requirements B) Quality Function Deployment 1.0 House of Quality Matrix C) Needs analysis D) Alternate sources of supply E) Evaluation techniques of supply forecasts and capacity F) Benchmarking G) Planned obsolescence H) Early Purchasing Involvement (EPI) 2) Role of supply management in product/service design A) Research and development B) Substitution C) Product innovation D) Contracting for design services
Page 24
2013
E) F) G) H) 2-F-2 Product Development Manage ramp-up strategy and implementation to fullscale production for new product introductions.
Qualified Products Lists (QPL) Early Supplier Involvement (ESI) Sourcing and cost profitability issues Target costing
Knowledge of: 1) Sales Projections 2) Staffing Requirements 3) Operations Capacity and Capabilities A) Operations Flexibility and Response Time B) Equipment and Labor Capabilities 4) Logistics/Distribution Capabilities 5) Supplier Capability/Capacity analysis A) Tooling B) Prototype Qualification 6) Lead time and inventory planning
2-G-1
Project Management
Knowledge of: 1) Project Initiation A) Root cause analysis 1.0 SWOT analysis 2.0 Kepner-Trego rational process analysis 3.0 Six Sigma process analysis 4.0 Business case analysis 5.0 Alternative analysis 6.0 Project feasibility analysis 6.1. NPV. IRR, Payback 7.0 Stakeholder analysis 8.0 Project charter 8.1 Project charter approval process 2) Project Planning A) Procurement planning process 1.0 Solicitation planning process 2.0 Scope development 2.1 SOW (Statement of Work) 3.0 Project team roles and responsibilities 3.1 RAM (Responsibility assignment matrix) 4.0 Budget development 5.0 Schedule development 5.1 Critical path 6.0 Risk management 6.1 Risk matrix 7.0 Organizational structures 7.1 Functional, matrix, projectized 8.0 Project plan approval process 3) Project Execution A) Solicitation process 1.0 Source selection process 2.0 Project team management 3.0 Change management 4) Project Monitoring and Control A) Contract administration process 1.0 Performance measurement tools 1.1 Earned value management, schedule analysis,
Page 25
2013
budget analysis 2.0 Change control processes 3.0 Risk monitoring process 4.0 Performance management reporting 4.1 Triple constraints (cost, schedule & performance) 4.2 Milestone reviews 5.0 Project management software programs 5) Project Closure A) Contract closeout processes 1.0 Property dispositions process 2.0 Final product/service acceptance 3.0 Final payment process B) Best practice and lessons learned identification C) Post project auditing procedure 2-G-2 Project Management Implement a continuous improvement process within the supply chain in accordance with organizational objectives. Knowledge of: 1) Benchmarking systems 2) Process mapping 3) Process costing 4) Maturity models 5) Capability Maturity Model-Integrated 6) Contract Management Maturity Model 7) Process improvement metrics 8) Process improvement methods (e.g., Lean methods, JIT, Six Sigma, value stream mapping) 9) Supplier workshops Knowledge of: 1) Supplier quality practices 2) Supplier certifications/registrations (e.g., ISO, GmP (Good Manufacturing Practices) 3) Congruence of test methodologies and results between buying and selling organizations 4) Organizational requirements for supplier certification (e.g.,, evidence of SPC) 2-H-2 Quality Develop measurements for continuous quality improvement and target setting. Knowledge of: 1) Quality Assurance A) Definition of Quality B) Acceptance Testing C) Certification requirements D) Quality documentation E) Best in class benchmarks 2) Quality Management A) Definition B) Meeting customer needs C) Quality Tools D) Statistical Tools Knowledge of: 1) Customer/user requirements
2-H-1
Quality
2-H-3
Quality
Page 26
2013
2) Internal requirements 3) Service Level Agreements (SLA) A) Service (e.g., customer satisfaction, lead time, on time) B) Cost performance C) Quality 1.0 Periodic inspections 1.1 Internal requirements 2.0 Customer requirements 3.0 Statistical methods/techniques 4.0 Testing methods 5.0 Levels of inspection 4) Measurements/Methods A) Customer surveys B) Focus groups C) Scorecards D) Potential distortions (e.g., subjectivity of end user, internal training, validity of data) E) Benchmarking F) Weighted-point G) Categorical H) Cost-ratio I) Total acquisition cost 5) Legal requirements 1) 2) 6) Supplier capacity and capabilities 7) Various quality processes A) Six Sigma B) ISO C) Software Engineering Institute (SEI) D) SPC E) Process capability (CpK)
Page 27
2013
3-A-4
Leadership
Page 28
2013
3.0 Procedures reviews 2) Best practices 3-A-5 Leadership Develop/implement changes to the organization's supply management policies as needed. Knowledge of: 1) Organizational policies and procedures 2) The scope of the supply management process (As defined by ISM) identification, acquisition, access, positioning and management of resources that an organization needs or potentially needs in the attainment of its strategic objectives. Which includes the following components: distribution, inventory control, logistics, materials management, product development, strategic sourcing, procurement/purchasing, quality, receiving, supply management, transportation / traffic / shipping and warehousing 3) The role of supply management in organizational strategies 4) Management of the change process (Change Management) 5) Legal ramifications 3-A-6 Leadership Participate in company acquisitions and/or mergers, and/or divestitures to assure the continuity of supply and capture synergy opportunities. Knowledge of: 1) Methods of evaluating assets/corporate value A) Contractual issues 1.0 Assignment consent 2.0 Confidentiality 3.0 Due diligence 4.0 Current contractual obligations 5.0 Financial assessments B) Management of redundancy and complexity C) Liability exposure D) Divestiture of assets E) Global economic considerations Knowledge of: 1) Meeting dynamics 2) Issues in the external role and perception of supply management 3) Professional decorum 4) Feedback to management 5) Confidentiality 6) Legal restrictions (e.g., antitrust, export) 3-A-8 Leadership Lead or participate in cross-functional and/or multifunctional teams (e.g., project management, process improvement, international teams). Knowledge of: 1) Purpose of teams A) Role of supply management in teams 1.0 Support/Service/Information 2.0 Project management 3.0 Leadership 4.0 Facilitation B) Advantages/Disadvantages of Teams 1.0 Consensus building 2.0 Time considerations
3-A-7
Leadership
Represent the supply organization in meetings with corporations, government agencies, professional associations and other organizations.
Page 29
2013
3.0 Ownership issues 4.0 Managing or introducing change 5.0 Groupthink 6.0 Synergy C) D) E) F) Phases of team building Conflict resolution Personality profiles Effectiveness measures 1.0 Individual 2.0 Team
3-A-9
Leadership
Disseminate information and promote training related to supply management policies and procedures.
Knowledge of: 1) Knowledge assessment and situational analysis 2) 3) Compliance metrics The Learning Organization concept
3-A-10
Leadership
Market the value of strategic sourcing and sourcing strategies and initiatives to management and internal customers.
Knowledge of: 1) Level of communication A) Senior Management B) Internal Customers 2) Methods of communication A) Feedback Mechanisms B) 360 survey C) Presentation skills D) intranet
3-A-11
Leadership
Evaluate the supply management organizational structure and modify as necessary in order to achieve the optimal structure.
Knowledge of 1) Functional Impact of Organizational Structure A) Centralized/Decentralized/Hybrid Models B) Product/ Brand Management C) Geographic 2) Organizational Types and their implications A) Functional B) Matrix C) Project D) Category/Commodity Management 3) Key Issues A) Spend Management B) Aggregation management C) Service to End Users 4) Workload distribution A) Commodity or class B) Department C) Special project D) Volume E) In rotation F) Type of contract G) Staff expertise H) Supplier
3-A-12
Leadership
Page 30
2013
2) Organization skill set requirements 3) Position skill set requirements 4) Issues in selection and recruitment A) Knowledge, skills and aptitudes of applicants B) References, experience and training C) Questions in the interview process (e.g., Behavior based interview techniques) 5) Issues in employee promotion A) Standards/certification B) Career advancement C) Advantages/disadvantages of promoting within D) Advantages/disadvantages of recruiting/hiring outside employees E) Training needs F) Succession planning G) Objective attainment 6) Issues in the termination of employees A) Consistent documentation/evaluation B) Adherence to established human resource policies / procedures / union requirements/ due process C) Quantifying/qualifying discussion to terminate employee D) Outplacement E) Exit interviews 7) Issues in employee retention A) Recognition/value B) Job satisfaction C) Compensation/benefits D) Career progression E) Work/life balance F) Work environment 8) Legal issues in employment and interviewing
3-A-13
Leadership
Knowledge of: 1) Issues in organizational management and administration A) Delegation of Authority and Responsibility B) Chain of Command C) Span of Influence/Span of Information Dissemination D) Theories of management 1.0 General theories 2.0 Motivational theories E) Diversity in the workplace F) Reward and Recognition programs 2) Group dynamics 3) Leadership principles 4) Change Management techniques
3-A-14
Leadership
Knowledge of: 1) Determination of training and development needs A) Needs and skills assessment B) Gap analysis
Page 31
2013
C)
2) Types of job training (functional orientation) A) Orientation B) On-the-job training C) Sponsor/mentor system D) Classroom training E) Functional rotation 3) Professional certification 4) Formal education/Advanced degrees 5) Professional association involvement 3-A-15 Leadership Develop/manage/ evaluate/measure relationships with internal departments. Knowledge of: 1) Role/perception of supply management within the organization 2) Establishment of trust and credibility 3) Feedback techniques A) Surveys B) Interviews 4) Influence techniques 5) Leadership techniques 6) Internal business partners roles, goals and objectives 7) Joint accountability 3-A-16 Leadership Develop/utilize criteria for evaluating supply management department performance. Knowledge of: 1) Organizational expectations of supply management A) Congruence with organizational objectives B) Congruence with supplier and customer objectives C) Scorecard 2) Reasons for departmental performance appraisal A) To determine departmental effectiveness in meeting organizational needs B) To determine effectiveness of department management C) To measure improvement/deterioration D) To provide incentives for improvement E) To determine resources needed for improvement F) To determine if value is added to the process 3) Steps in department-level evaluation A) Identify department objectives B) Identify criteria for success C) Identify appraisal factors D) Internal audits/Self-governance/Self- assessment E) Obtain supplier feedback F) Process benchmarking G) Best practice studies H) Exercising management control in response to results 4) Concepts of a Strategic Supply Management Department 5) Evaluation of outsourced supply functions 6) Evaluation of feasibility and impact of outsourcing supply
Page 32
2013
functions 3-A-17 Leadership Conduct role design evaluation and potential job redesign requirements. Knowledge of: 1) Organization functional requirements 2) Position functional requirements 3) Elements of job design 4) Staffing implications 5) Span of influence 3-A-18 Leadership Create and manage a succession plan, allocating work assignments in such a way as to provide career development and growth opportunities. Knowledge of: 1) Cross training 2) Mentoring 3) Professional development 4) Delegation of leadership opportunities 5) Human resources policies, procedures and planning 6) Elements of a succession plan 7) Organizational structure 8) Educational opportunities 9) Job rotation 3-B-1 Risk and Compliance Develop, implement and manage a risk profile and strategies in accordance with existing contracts, applicable laws, regulations and organizational policy. Knowledge of: 1) Classifications of risk stakeholders 2) Contractor Tier Considerations: A) prime contract B) Sub contract C) General 3) Probability estimation procedures 4) Risk management procedures A) Risk planning B) Risk assessment 1.0 Risk profile C) Risk mitigation D) Risk monitoring 3-B-2 Risk and Compliance Develop and implement a risk management and/or claims management program (i.e., copyright violation, patent infringement, harassment). Knowledge of: 1) Financial risk 2) Operational risk 3) Brand/reputation risk 4) Legal risk A) Employment B) Intellectual property 5) Environmental risk
Page 33
2013
6) Technical risk 3-B-3 Risk and Compliance Implement supply management processes in consideration of legal issues. Knowledge of: 1) Legal aspects of various supply management processes to include: A) Law of Agency B) Definition of Agent C) Fiduciary Duty D) Limits of Authority E) Actual vs. Apparent Authority F) Ratifications 2) Role of legal counsel 3) Delegation of authority (e.g.,, financial levels, budget holder) 4) Regulations influencing the development of solicitations A) Uniform Commercial Code (UCC) Article 2, Sales B) Antitrust and Trade Regulation 1.0 Sherman Antitrust Act 2.0 Clayton Act 3.0 Robinson-Patman Act 4.0 Federal Trade Commission (FTC) Act C) Regulation of Federal Procurement and Public Projects 1.0 Federal Acquisition Regulations (FAR) 2.0 False Claims Act 3.0 Davis-Bacon and related Acts 4.0 Prompt Payment Act 5.0 Service Contract Act 6.0 Walsh-Healey Public Contracts Act 7.0 Small Business Act 8.0 Buy American Act 9.0 Freedom of information Act Regulation of International Commerce 1.0 Trade Agreements Act of 1979 2.0 Foreign Corrupt Practices Act 3.0 North American Free Trade Agreement (NAFTA) 4.0 General Agreement on Trade and Tariffs (GATT) 5.0 United Nations Convention on Contracts for the International Sale of Goods (CISG) 6.0 Other international laws/rulings E) Americans With Disabilities Act F) Agency regulations/ rulings (industry specific) G) Government price support regulations H) Other federal/state/local laws-or country specific Knowledge of: 1) Regulatory requirements for records management 2) Organizational policy for records management/database management 3) Data management system requirements 4) Data classification 5) Data management capabilities 6) Domestic and international issues 7) Types of data D)
3-B-4
Page 34
2013
3-B-5
Verify the existence, accuracy and completeness of relevant financial transactions and commitments to third parties.
A) Specifications B) Suppliers C) Supplier performance D) Products/services E) Contracts F) Spend G) Tariffs H) Routing guides I) Technical assistance agreements J) Other issues Knowledge of: 1) Domestic and international regulatory requirements (e.g., FERC Federal Energy Regulatory Commission, Sarbanes-Oxley Act (SOx) 2) Organizational financial reporting policies
3-B-6
Assess risk from end of life cycle issues in the market place and establish proper risk mitigation contingency plans for all components in the product.
Knowledge of: 1) Life cycle costing 2) Product marketing strategy 3) Market intelligence 4) Collaboration with suppliers 5) Risk tolerance of organization
3-B-7
Manage and control the storage/disposal of hazardous/regulated materials and related documentation.
Knowledge of: 1) Laws/regulations related to documentation, storage, handling, transportation and disposal (cradle to grave) 2) Risk A) Contractual B) Insurance C) Legal 3) Ethical issues 4) Audit A) Internal B) Supply chain C) Reporting D) Certification (e.g., transport, storage, abatement) 5) Organization values and policies A) Collection programs 6) ISM Principles of social responsibility and audit 7) Customer driven requirements
3-B-8
Knowledge of: 1) Federal/State/local laws and regulations A) Protected classes: race, color, religion, sex, national
Page 35
2013
4) Other country equivalent laws and Regulations 5) Diversity training 3-C-1 Strategic Sourcing Establish and execute strategic sourcing plans, in congruence with organizational objectives and sourcing strategies. Knowledge of: 1) Internal organization conditions related to sourcing strategies. A) Operational strategies B) Financial strategies C) Marketing strategies D) Supply strategies E) Technology strategies 2) Market analysis 3) Supplier marketing strategies 4) Risk/benefit analysis 5) Roll out plan 6) Communication plan 7) Phased timeline approach 3-C-2 Strategic Sourcing Establish and standardize strategic sourcing procedures and business process improvements. Knowledge of: 1) Regression analysis 2) Processes to disseminate and communicate the policy and procedures 3) Technology and application tools A) Applications B) Analytical 4) Analytical skills 5) Sourcing related technologies 6) Change management skill Knowledge of: 1) Business process design 2) Market analysis for selection of appropriate e-solutions 3) Methodologies for selection, implementation and adoption by the organization A) Assessment of current systems B) e-Business solutions 4) Contemporary e-sourcing tools A) Purchase Order systems B) eRFx C) EDI D) Reverse auctions E) e-design 5) Procedures for managing an online event 6) Spend analysis 7) Contract management
3-C-3
Strategic Sourcing
Identify, evaluate, select and implement technologies that support supply management functions throughout the organization.
Page 36
2013
8) Supplier Performance Measurement 3-C-4 Strategic Sourcing Leverage spend through identification, prioritization, development and execution of strategies. Knowledge of 1) Implications of Organizational Structure A) Stakeholders B) Steering Committee (add to resources) 2) Opportunity Assessment A) Spend Analysis B) Cost Analysis C) Risk Analysis D) Market Analysis (i.e., Monopoly, oligopoly, etc.) E) Requirements Analysis (e.g., standardization, consolidation) 3) Leveraging strategies: A) Aggregating spend B) Process improvements C) Innovative thinking 4) Factors for prioritizing decision making: A) Savings B) Organizational capacity C) Organizational culture D) Constraints
3-C-5
Strategic Sourcing
Knowledge of: 1) Procedures for conducting "make-or-buy" or outsourcing analyses A) Determining feasibility B) Determining need C) Methods/processes 1.0 Analysis of components 2.0 Break-even analysis 3.0 Cost estimation processes 4.0 Incremental cost analysis 2) Factors influencing outsource / make-or-buy / off-shoring decisions A) Strategic factors 1.0 Long-term supply implications 2.0 Core competencies and strategies 3.0 Supply Risk 3.1 Degree of Control required 3.2 Security of the Process 4.0 Total cost of ownership results 5.0 Competitive issues B) Reduction in Assets C) Flexibility to change
3) Labor and other organizational constraints A) Quality considerations B) Supplier current and future capability C) Socioeconomic goals/objectives D) Capital Investment 4) Offshoring A) Low-cost country sourcing B) Country analysis 5) Privatization A) Definition
Page 37
2013
B) Applicability C) Political considerations D) Public/Private Partnerships 6) Post audit evaluation of decision 3-C-6 Strategic Sourcing Create new systems and process improvements to help the organization meet sales goals. Knowledge of: 1) Product and technology roadmaps of supplier and customer A) Sales goals 2) Data on sales performance to plan A) Point of sale information 3) Integration requirements between supplier and customer systems 4) Product pricing strategy A) Margins 5) Financial and information flows 6) Critical service factors 7) Customer segmentation (derived demand and market segmentation) 8) Supplier collaboration processes
Page 38
2013