Purpose
Self-assessment Short audit Certification audit Surveillance audit Recertification audit Follow-up audit
9001:2000
Date: Date: Date: Date: Date: Date: Date:
9001:2008
Organization
Name Address Postal Code, town/city Certified area Area of activity Contact person Phone/fax E-mail
Auditor team
1. Auditor (audit manager): 2. Auditor: Observer: Signature: Signature: Signature:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, E-mail: office@qualityaustria.com
Notes on changes: Parts marked in grey come from EN ISO 9001:2008. New words that have been inserted or changed words have partly been underlined. Hint relating to handling risk management:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Strengths/weaknesses
Standard points 4.1 4.2.1 4.2.2 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of the requirements in regard to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation Control of the design and development process Purchasing process Purchasing information Verification of purchased products Control of the product/service provision Validation of processes for product/service provision Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment Short name
P* WW*
Control of records
Document Control
5.6.1 5.6.2
Internal Communication
Customer orientation
6. Management of resources
Management comittment
Customer satisfaction
Provision of resources
Personnel resources
Internal audits
Infrastructure
Workenvironment
Preventive action
Corrective action
Analysis of data
7. Product realization
Development
Test equipment
Purchasing
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
Planning
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Vision: Mission: Policy: Strategies: Projects: Programs: Methods: Tools: Processes: Key processes: Key parameters: Functions / responsibilities:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
4.2/4.3.3/4.6
Objectives
Strategy
Planning sub-objectives
C I M M C A C C P
P l D
e R e
11
Review Evaluation of the service
D D D D D D
C o
P P V C
V a
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Improvement
System modification
I d C P C
Key
*P = Priority, *WW = Interaction, = Processes, = Components, =
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Management process
Audit objectives: Observations/references:
5.3-01 is suitable for the purpose of the organization? 5.3-02 contains an obligation for the fulfilment of the requirements and for the continuous improvement of the effectiveness of the quality management system? 5.3-03 offers a framework for the establishing and evaluation of the quality objectives? 5.3-04 is distributed and understood within the organization? 5.3-05 is evaluated in terms of its continuing suitability for purpose required? E 4.201 Does an environmental policy in writing, established by top management exist? E 4.202 Is it appropriate in terms of the type, extent and environmental effects of the activities, products or services of the organization? E 4.203 Does it contain an obligation for continuous improvement and the avoidance of environmental pollution? E 4.204 Does it contain an obligation for the maintaining of the relevant environmental legislation and regulations plus other requirements? 4.205 Does it form a framework for the establishing and N E evaluation of the environment related objectives and individual targets? E 4.206 Are all persons who work for or on behalf of the company informed about it? E 4.207 Is it accessible to the public? 5.4 Planning 5.4.1 Quality objectives and environmental objectives 5.4.1-01 Does the top management ensure that the quality objectives have been established for the relevant functional areas and levels including those that are required for the fulfilment of the requirements for products?
5.4.1-02 Are the quality objecitves measurable and are they consistent with the quality policy?
Hints, recommendations:
E 4.3.301 Have environmental related objectives and separate objectives been established and are these being maintained? E 4.3.302 Does the objective process take account: - applicable statutory requirements, - the significant environmental aspects, - the technological options, - economic circumstances, - the operative environment, - the standpoint of parties involved? 5.6 Management review 5.6.1 General 5.6.1-01 Does the top management review the quality management system of the organization at planned intervals in order to ensure its continuing suitability, applicability and effectiveness?
5.6.1-02 Does this review of the evaluation of possibilities for improvements and the change requirement for the quality management system also include the quality policy and the quality objectives?
5.6.1-03 Are the notes made concerning the management review maintained? 5.6.2 Input for review Does the input for the management review contain information about the following issues: 5.6.2-01 Results of audits? 5.6.2-02 Feedback from customers? 5.6.2-03 Process performance and product conformity? 5.6.2-04 The status of preventive and corrective actions? 5.6.2-05 Measures to be taken as a consequence of preceding management reviews? 5.6.2-06 Planned changes that could have an effect on the quality management system? 5.6.2-07 Recommendations for improvements? E 4.6-01 The results of the review in regard to the fulfilment of the relevant regulations E 4.6-02 Information provided by external interested parties including complaints E 4.6-03 Environmental achievements of the organization E 4.6-04 The extent of the achievement of objectives 5.6.3 Results of the management review Do the results contain all the decisions and measures from the review on the following issues: 5.6.3-01 Improvement of the effectiveness of the quality management systems and its processes? 5.6.3-02 Product improvement in regard to customer requirements 5.6.3-03 Resources requirements? Please note: Requirement in accordance with the QA general terms and conditions and/or EN 45012 Are complaints also dealt with and documented in the scope of this evaluation in regard to the QM system?
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
A
Nonconformities with the Standard (number of the improvement measure protocol):
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Management system
Audit objectives: Observations/references:
Hints, recommendations:
Does the Quality Management Manual contain: 4.2.2-01 the area of application of the quality management system including the details and the reasons for any exclusions? 4.2.2-02 the documented procedure created for the quality management system or references to it? 4.2.2-03 a description of the interaction of the processes in the quality management system?
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
+ -
Document Control
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization
Determination of requirements related to the product
E
Creating, maintaining
4.4.5
4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3
Review releasing
6.1 6.2.1 6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4
Publishing updating
Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Document control
Audit objectives: Observations/references:
Y N
4.2.3 Document control (Q+E) 4.2.3-01 Are the documents required for the quality management system being controlled? 4.2.3-02 Quality records represent a special document type. Are they being controlled in accordance with the specifications in section 4.2.4? Does a documented procedure exist for establishing the control measures required in order: 4.2.3-03 to approve the documents prior to publication in respect to their adequacy? 4.2.3-04 to evaluate documents, update them if required and approve them anew? 4.2.3-05 to ensure that the changes and the current editing status of the documents are marked? 4.2.3-06 to ensure that the valid versions of relevant documents are available at the appropriate points of use? 4.2.3-07 to ensure that the documents are legible and easily recognized? 4.2.3-08 to ensure that those documents of external origin are marked and that their distribution is controlled? 4.2.3-09 to prevent the unintentional use of outdated documents and to make sure that these are marked in an appropriate manner, in the event that they must be preserved for any reason? E 4.4.5-01 Has it been ensured that documents of external origin that are classed as essential for the planning and the operation of the EMS are recognized and that their distribution is monitored? N
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
+ -
4.5.3
5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1 6.2.2 6.3 6.4
Releasing distributing
Filing securing
Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
Protecting preseving
Destroying
7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E
Analysis of the needs abilities gaps
4.4.2
4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1 6.2.2
Agreement implementation
Evaluation of benefits
8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Internal audit
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
E
Analysis of the needs and frequency
4.5.4
4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1
8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4
Reporting
7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision Validation of processes for product/service provision Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Internal audit
Audit objectives: Observations/references:
Y N
8.2.2 Internal audit (Q+E) Does the organization coduct internal audits at planned intervals to determine whether the quality management system: 8.2.2-01 conforms to the requirements specified by this International Standard and to the quality management system requirements established by the organization? 8.2.2-02 is effectively implemented and maintained? 8.2.2-03 Is an audit program created in which the significance of the processes to be audited and the areas as also the results of previous audits are taken into account? 8.2.2-04 Are the audit criteria, the scope of the audit, the audit frequency and the audit method defined? 8.2.2-05 Does the selection of auditors and the carrying out of the audits ensure the objectivity and impartiality of the audit process? 8.2.2-06 Is it assured that the auditors are not auditing their own activities? 8.2.2-07 Are the responsibilities and requirements for planning and conducting audits as also on the reporting of the results and the maintaining of records defined in a documented procedure? 8.2.2-08 Has the management responsible for the area being audited assured that actions are being taken without undue delay to eliminate detected nonconformities and their causes 8.2.2-09 Do the follow-up measures include provisions for the verification of the actions taken and the reporting of verification results? E 4.5.401 Are these procedures suitable for establishing whether the environmental management system: -complies with the internal arrangements and the ISO 14001 requirements? - has been implemented and maintained in an orderly manner? E 4.5.402 Does the audit and the environmental operational auditing program take account of: - The significance of the activity for the environment? - The results of previous audits?
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
+ -
E
Selecting weighting evaluating existing problems
4.5.2
4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1
Analyzing causes
6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Corrective action
Audit objectives: Observations/references:
Y N
8.5.2 Corrective action (Q+E) 8.5.2-01 Have corrective actions been taken for dealing with the causes of nonconformities to prevent them from reoccurence? 8.5.2-02 Corrective actions shall be appropriate to the effects on the nonconformieties encountered. Is this the case? Has a documented procedure een established to define requirements for : 8.5.2-03 Reviewing nonconformities (including customer complaints)? 8.5.2-04 Determining the causes of nonconformities? 8.5.2-05 Evaluating the need for action to ensure that nonconformities do not recur? 8.5.2-06 Determining and implementing action needed? 8.5.2-07 Records of the results of actions taken? 8.5.2-08 Reviewing of corrective action taken? E 4.5.201 Has it been assured that environmentally relevant occurrences are systematically and appropriately recorded?
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Preventive action
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
E
Identifying weighting evaluating potential but still non-existent problems / risks
4.5.2
4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 5.4.2 5.6.1 5.6.2 5.6.3 5.5.1
7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Preventive action
Audit objectives: Observations/references:
Y N
8.5.3 Preventive action 8.5.3-01 Has preventive action been determined to eliminate the causes of potential nonconformities in order to prevent their occurence? 8.5.3-02 Preventive actions shall be appropriate to the effects of potential problems. Is this the case? Does an introduced documented procedure exist to define requirements for: 8.5.3-03 Determining potential nonconformities and their causes? 8.5.3-04 Evaluating the need for action to prevent occurrence of nonconformities? 8.5.3-05 Determining and implementing action needed? 8.5.3-06 Records of results of action taken? 8.5.3-07 Reviewing preventive action taken?
Reference to risk management ISO/DIS 31000 (see the hint relating to handling risk management on page 2 of this checklist)
Making people aware of potential risks, particularly relating to the QM System, is a concern of Quality Austria. This procedure can be demonstrated best by making a risk analysis in the context of management review. Still another option is to integrate the risk management aspects in the process of preventive action. Risk management (excerpt from the definition in the course for risk management offered by Quality Austria):
Hints, recommendations:
Risk management means to know the risks and be capable of winning relevant opportunities. The general objective of risk management is to contribute to sustainably securing the existence and subsistence of the organization by adequately handling risks. By no means does this mean the complete elimination of all the conceivable potentials of disturbance. It rather is a matter of striving for a risk or safety level that is optimal under aspects of economic efficiency.
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E
Defining and setting priorities for the improvement potential the system, the processes, the products, the services, the communication, the Information
8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2
7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Improvement process
Audit objectives: Observations/references:
Y N
8.5.1 Continuous improvement 8.5.1-01 Is the effectiveness of the quality management system continuously improved through the use of quality policy, quality objectives, audit results, data analysis, corrective and preventive actions as also through management assessment?
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Customer-related processes
NormShort name points 4.1 General requirements 4.2.1 4.2.2 4.2.3 4.2.4 5.1 5.2 5.3 5.4.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation Control of the design and development process Purchasing process Purchasing information Verification of purchased products Control of the product/service provision Validation of processes for product/service provision Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
E 4.3.1/4.3.2/
4.4.3/4.4.6 Requirements
5.4.2 5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1 6.2.2 6.3 6.4 8.1
8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5
7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Follow-up activities
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Customer-related processes
Audit objectives: Observations/references:
Y N
7.2 Customer-related processes 7.2.1 Determination of requirements relating to the product Does the organization determine: 7.2.1-01 requirements specified by the customer, including the requirements for delivery and post-delivery activities? 7.2.1-02 requirements not stated by the customer but necessary for specified or intended use, where known? 7.2.1-03 statutory and regulatory requirements related to the product? 7.2.1-04 All other specifications defined by the organization ? NOTE Activities after delivery include measures taken because of warranty conditions, contractual obligations, such as maintenance, and supplementary services, such as recycling and reuse or waste disposal. 7.2.1 Review of the requirements related to the product 7.2.2-01 Does the organization review the requirements related to the product? 7.2.2-02 Is this review conducted prior to the organizations commitment to supply a product to the customer ( e.g. submission of tenders, acceptance of contracts or orders, acceptance of changes to contracts or orders)? Does it ensure: 7.2.2-03 That product requiements are defined? 7.2.2-04 contract or order requirements differing from those previously expressed are resolved? 7.2.2-05 That the organization has the ability to meed the definded requirements? 7.2.2-06 That records of the results of the review and actions arising from the review are maintained? 7.2.2-07 That the customer requirements prior to acceptance are confirmed by the organization when the customer has not previously presented a documented statement of requirement? 7.2.2-08 Does the organization ensure when product requirements change that the relevant documents are also changed and that the personnel responsible are made aware of the changed requirements? EXPLANATORY NOTE: In a number of cases e.g. Internet sales, a formal evaluation of each separate order is not practicable. Instead of this the evaluation can refer to relevant product information such as catalogs or advertising material for example. 7.2.3 Customer communication Does the organization have effective regulations for communication with the customer that have been established to cover the following points and have these been implemented with regard to: 7.2.3-01 Product information? 7.2.3-02 Enquiries, contracts or order handlingincluding amendments? 7.2.3-03 Feedback from the customer including customer complaints? E 4.4.601 Is the checking of the customers environmental requirements done before the producing of an offer or the acceptance of an order (feasibility study)? E 4.4.602 Is a relevant consultation and instruction with the customer made about handling products that are hazardous to the environment?
Hints, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E
Ideas analyses customer wishes internal / external specifications
4.4.6
Specification
6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5
Design / development
Design /rReviews
Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
Verification
Valididation
7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E 4.4.601 Are environmentally relevant aspects taken into account in the design and development planning and in the entire design and development process? 7.3.2 Design and development inputs 7.3.2-01 Are inputs in regard to the product requirements established and recorded? Do these include: 7.3.2-02 Functional and performance requirements? 7.3.2-03 Applicable statutory and regulatory requirements? 7.3.2-04 Where appropriate is information derived from previous similar designs and developments? 7.3.2-05 Other specifications important for the design and development? 7.3.2-06 Are these inputs evaluated on the basis of their appropriateness? 7.3.2-07 Are the specifications complete, clear and free from contradictions? e 4.4.602 Are the environmentally relevant specifications made for the product that is to be developed (DL) (including all statutory and authority specifications) clearly and comprehensively defined? 7.3.3 Design and development results 7.3.3-01 Are the development results provided in a form, making their verification possible over and against the development inputs, and are they subject to approval before release? Is it ensured that the development results: 7.3.3-02 Fulfill the development specifications? 7.3.3-03 That suitable information is provided for the buying, production and services provision? 7.3.3-04 Acceptance criteria for the product are contained or reference made to them? 7.3.3-05 Those characteristics of the product are established that are essential for a use for the purpose intended?
NOTE Information for production and service provision can include details for maintenance of the product.
Notes, recommendations:
7.3.4 Design and development evaluation Are systematic reviews carried out in suitable phases in order to: 7.3.4-01 Assess the suitability of the development results for the fulfillment of the specifications? 7.3.4-02 To recognize all problems and to suggest necessary measures? 7.3.4-03 Do the participants of reviews of this kind include representatives of the functional areas that are affected by the evaluated development phase or the evaluated development phases? 7.3.4-04 Are notes taken about the results of the reviews and about essential measures? 7.3.5 Design and development verification 7.3.5-01 Is a verification is carried out in order to assure that the design and development results fulfill the design and development specifications? 7.3.5-02 Are notes taken about the results of the verification and about essential measures? 7.3.6 Design and development validation 7.3.6-01 Has a development validification been carried out in accordance with the planned arrangements (see 7.3.1), to ensure that the resultant product is capable of meeting the requirements for the defined or intended use, where known? 7.3.6-02 Has the validation been completed where possible before the delivery or the introduction of the products? 7.3.6-03 Are notes taken about the results of the validation and about essential measures? 7.3.7 Control of design and odevelopment changes 7.3.7-01 Are design and development changes identified and recorded? 7.3.7-02 Are changes reviewed, verified and validated and also approved before their implementation insofar as it is reasonable to do so? 7.3.7-03 Does the evaluation of the development changes include the assessment of the effects of the changes on the components and the delivered products? 7.3.7-04 Are records of the results of the review of changes k d i i i d?
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation Control of the design and development process Purchasing process Purchasing information Verification of purchased products Control of the product/service provision Validation of processes for product/service provision Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment 4.2.2 4.2.3 4.2.4
E
Specifications
4.4.6
Planning availability of: information instructions check lists equipment measuring & testing aids resources Identification and tracability
5.6.1 5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1 6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1
Customer prpoerty
7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Notes, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Notes, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Notes, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Purchasing process
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation Control of the design and development process Purchasing process Purchasing information Verification of purchased products Control of the product/service provision Validation of processes for product/service provision Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment 4.2.2 4.2.3 4.2.4
E
Specifications
4.4.6
Procurement information
6.1 6.2.1 6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1
7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Purchasing
Audit objectives: Observations/references:
Y N
7.4 Purchasing 7.4.1 The purchasing process 7.4.1-01 Does the organization ensure that the purchased products conform to the specified purchase requirements? 7.4.1-02 Does the type and extent of the monitoring applied to the supplier and the purchased product, depend on the influence of the purchased product on the subsequent product realization or on the end product? 7.4.1-03 Does the organization assess suppliers on the basis of their capabilities for supplying products that are compliant with the specifications of the organization? 7.4.1-04 Does it select suppliers on this basis? 7.4.1-05 Do criteria exist for selection, assessment and re-assessment? 7.4.1-06 Are records of the results of evaluations and all necessary actions arising from the evaluation maintained? 7.4.2 Purchasing information 7.4.2-01 Does purchasing information describe the product that is to be purchased? Does this information contain, insofar as this is reasonable: 7.4.2-02 Requirements for the approval of products, procedures, processes and equipment? 7.4.2-03 Requirements for the qualification of the personnel? 7.4.2-04 Requirements for the quality management system? 7.4.2-05 Does the organization ensure the adequacy of specified purchase requirements prior to their communication to the supplier? 7.4.3 Verification of purchased product 7.4.3.-01 Are the specified tests or other activities by means of which it is ensured that the procured product fulfils the defined procurement specifications both established and realized? 7.4.3.-02 Does the organization establish the intended verification measures and the methods for the release of the product in the purchasing information when either the organization itself or the customer intends to carry out verification activities at the suppliers premises? Has it been established by means of the following measures that the environmentally relevant purchasing process has been carried out under the established conditions: E 4.4.601 The procedure in respect to significant environmental aspects in connection with the purchasing of goods and services. Note: e.g. requirements in purchasing documents such as safety data sheets, waste product collection permits, requirement specifications for transport companies,... E 4.4.602 Making the relevant procedures and requirements known to suppliers and contractors.
Notes, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E
Need
4.5.1
Specifications
Verification
5.6.2 5.6.3 5.5.1 5.5.2 5.5.3 6.1 6.2.1 6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2
Stock
Calibration
Issue
Control
Withdrawal
Calibration
Follow-up measures stock, scrapping, devaluation evaluation of the required services, activvities with regard to products / services
7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Notes, recommendations:
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
P* WW*
4.3.1
NormShort name points 4.1 General requirements 4.2.1 4.2.2 4.2.3 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
5.5.1
Environmental programs
Management evaluation
Continuous improvement
7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
NormShort name points 4.1 General requirements 4.2.1 General Quality Management Manual Document control Control of records Management commitment Customer orientation Quality policy Quality objectives Planning of the quality management system General Review input Review output Responsibility and authority Management responsibility Internal communication Provision of resources General Competence, training and awareness Infrastructure Work environment General Customer satisfaction Internal audit Monitoring and measurement of processes Monitoring and measurement of the product Control of nonconforming product Analysis of data Continual improvement Corrective action Preventive action Planning of product realization Determination of requirements related to the product Review of requirements related to the product Customer communication Design and development planning Design and development inputs Design and development results Design and development evaluation Design and development verification Design and development validation
Control of the design and development process
E
Establish relevant reqirements for environmental aspects
4.3.2
Making accessible
Management process
E4.3.3
Objectives, individual targets, program
8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
4.5.2
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
E
Identify potential accidents and emergency situations
4.4.7
6.1 6.2.1 6.2.2 6.3 6.4 8.1 8.2.1 8.2.2 8.2.3 8.2.4
Precautionary measures
8.3 8.4 8.5.1 8.5.2 8.5.3 7.1 7.2.1 7.2.2 7.2.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4.1 7.4.2 7.4.3 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6
4.5.2
Purchasing process Purchasing information Verification of purchased products Control of the product/service provision
Validation of processes for product/service provision
Identification and traceability Customer property Preservation of product Control of monitoring and measuring equipment
Key
*P = Priority, *WW = Interaction, = Processes, = Components, = Components relating to a process
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Note: Risk analysis interaction with 4.5.2 Deviations, corrections and precautionary measures and 4.3.1 Environmental aspects
E 4.4.702 Are there procedures that regulate the course of action in emergency situations (accidents and emergencies)?
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
NOTE Monitoring and control of customer perception may include the following: obtaining inputs from such sources as customer satisfaction surveys, customer data relating to the quality of the delivered product, surveys made among the users, analyses of lost business transactions, recognitions and awards, claims for warranties, reports given by merchants.
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com
Strengths:
Potentials:
Distinct interactions :
A-4020 Linz, Am Winterhafen 1, phone: (+43 732) 34 23 22, Fax: (+43 732) 34 23 23, Homepage: www.qualityaustria.com, Email: office@qualityaustria.com