QMS Formats PDF
QMS Formats PDF
QMS Formats PDF
: CENTRAL
Year :
Sept May Aug Oct Nov
Date:
Dec Mar Feb
Jun
Jan
Jul
............................. to .............................
Team leader / MR : Team Members(S) : Name & signature of Audittee/Divisional Head in conformation of above
Name : Designation : No. of NCRs Raised : No. of NCRs closed before the end of audit :
Annexure--II
Name & signature of Audittee Representative Rectification Proposed (to be filled by Audittee)
Audittee Representative Clearance Report (to be filled by Auditor) Verified the following and NC cleared / accepted / to be verified during next audit
Team leader:
Member :
Date :
Annexure--IV
Audittee
Auditor
: : : : : :
ii) CQM / Div. Supplement iii) Mandatory Procedures / Other Procedures iv) Process Procedures / DP v) Work Instructions
: :
Signature of Auditor
Form No.IA / 01
Issue:1
Dt. 27-11-2001
AUDIT PLAN
Division SL. No. Dept. / Date Division Contact person Name S/sri Venue Phone : CENTRAL Phone Auditors Names S/sri
Form No.IA / 01
Issue:1
Dt. 27-11-2001
controlled relevant documents are avaialble Records with captured data are available with proper control & authentication
Feed back reports, Performance reports, addtional requirements & Delivery records understood, implementation & effectiveness, fixed, monitored, effectiveness, records for acievements & periodical reviews
fixed, performance & competency to carry out responsibilities, utilisation and controlling of resources Ensure proper communication system is established regarding effectiveness og QMS system
results of audits, customer feed back, process performance efectiveness of corrective &preventive actions, improvements improvements, resources needed
Training needed, evaluationfor competency, ensurethe awareness of the relevany & requirements & importanceof thier activities Check for the infracstucture needed/ available
Design & Development Design & Development Planning Design & Development inputs Design & Development outputs Design & Developmentreviews Design & Developmentverification Design & Developmentvalidation Control of Design & Development changes Purchasing Purchasing processes Purchasing information Verification of purcha sed products Production and service provosion Control of Production& service Provision Validation of processes for prodn. & service provision Identification& traceability Customer property Preservation of Product Control of monitoring & measuring devices Measurement, analysis & improvement General Monitoring & measurement Customer satisfaction Internal Audit Monitoring & measurementof processes Monitoring & measurement of product Control of nonconforming product Analysis of data Improvement Continual improvement Corrective action Preventive action conformation to the p.o
Date: 10.10.2003
Project Guide Sales / Desp PC Integratn PC Mainten TOTAL
CLAUSE NO.
Qualiy Mgt. System General requiremen Documentations requirements General Quality Manual Control of Documents Control of Records Managenet Responsibility Management Comittment Customer Focus Quality Policy Planning Quality Objectives Quality Mgt. Sys. Planning Responsibilty, Authority, & Communication Responsibilty& Authority Management Representative Internal communication Management Review General Review input Review output Resources Management Provision Resources Human Resources General Competence, Awareness & training Infrastructure Work environment Product realisation Planning of Product realisation Customer related processes Determination of reqs. related to products Review of requirements related to products Customer communication Total No. Of NCs X = Not applicable _ = No NC raised
4 4.1 4.2 4.2.1 4.2.2 4.2.3 4.2.4 5 5.1 5.2 5.3 5.4 5.4.1 5.4.2 5.5 5.5.1 5.5.2 5.5.3 5.6 5.6.1 5.6.2 5.6.3 6 6.1 6.2 6.2.1 6.2.2 6.3 6.4 7 7.1 7.2 7.2.1 7.2.2 7.2.3
Team leader
Form No.IA / 01 Issue:1 Dt. 27-11-2001
Team Member(s)
Auditttee
HOD
Date: 10.10.2003
Project Guide PC Maintenc Sales / Desp PC Integratn TOTAL
CLAUSE NO.
Design & Development Design & Development Planning Design & Developmentinputs Design & Developmentoutputs Design & Developmentreviews Design & Developmentverification Design & Developmentvalidation Control of Design & Development changes Purchasing Purchasing processes Purchasing information Verification of purcha sed products Production and service provosion Control of Production& service Provision Validation of processes for prodn. & service provision Identification& traceability Customer property Preservation of Product Control of monitoring & measuring devices Measurement, analysis & improvement General Monitoring & measurement Customer satisfaction Internal Audit Monitoring & measurementof processes Monitoring & measurement of product Control of nonconforming product Analysis of data Improvement Continual improvement Corrective action Preventive action
7.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4 7.4.1 7.4.2 7.4.3 7.5 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6 8 8.1 8.2 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5 8.5.1 8.5.2 8.5.3
Total No. Of NCs X = Not applicable _ = No NC raised Minor Total Minor NCs Major Total Major NCs
Team leader
Form No.IA / 01 Issue:1 Dt. 27-11-2001
Team Member(s)
Auditttee
HOD
Date: 12.12.2003
Project Guide Sales / Desp PC Integratn PC Mainten TOTAL
CLAUSE NO.
Qualiy Mgt. System General requiremen Documentations requirements General Quality Manual Control of Documents Control of Records Managenet Responsibility Management Comittment Customer Focus Quality Policy Planning Quality Objectives Quality Mgt. Sys. Planning Responsibilty, Authority, & Communication Responsibilty& Authority Management Representative Internal communication Management Review General Review input Review output Resources Management Provision Resources Human Resources General Competence, Awareness & training Infrastructure Work environment Product realisation Planning of Product realisation Customer related processes Determination of reqs. related to products Review of requirements related to products Customer communication Total No. Of NCs X = Not applicable _ = No NC raised
4 4.1 4.2 4.2.1 4.2.2 4.2.3 4.2.4 5 5.1 5.2 5.3 5.4 5.4.1 5.4.2 5.5 5.5.1 5.5.2 5.5.3 5.6 5.6.1 5.6.2 5.6.3 6 6.1 6.2 6.2.1 6.2.2 6.3 6.4 7 7.1 7.2 7.2.1 7.2.2 7.2.3
Team leader
Form No.IA / 01 Issue:1 Dt. 27-11-2001
Team Member(s)
Auditttee
HOD
Date: 12.12.2003
Project Guide PC Maintenc Sales / Desp PC Integratn TOTAL
CLAUSE NO.
Design & Development Design & Development Planning Design & Developmentinputs Design & Developmentoutputs Design & Developmentreviews Design & Developmentverification Design & Developmentvalidation Control of Design & Development changes Purchasing Purchasing processes Purchasing information Verification of purcha sed products Production and service provosion Control of Production& service Provision Validation of processes for prodn. & service provision Identification& traceability Customer property Preservation of Product Control of monitoring & measuring devices Measurement, analysis & improvement General Monitoring & measurement Customer satisfaction Internal Audit Monitoring & measurementof processes Monitoring & measurement of product Control of nonconforming product Analysis of data Improvement Continual improvement Corrective action Preventive action
7.3 7.3.1 7.3.2 7.3.3 7.3.4 7.3.5 7.3.6 7.3.7 7.4 7.4.1 7.4.2 7.4.3 7.5 7.5.1 7.5.2 7.5.3 7.5.4 7.5.5 7.6 8 8.1 8.2 8.2.1 8.2.2 8.2.3 8.2.4 8.3 8.4 8.5 8.5.1 8.5.2 8.5.3
Total No. Of NCs X = Not applicable _ = No NC raised Minor Total Minor NCs Major Total Major NCs
Team leader
Form No.IA / 01 Issue:1 Dt. 27-11-2001
Team Member(s)
Auditttee
HOD