GP161901 Com
GP161901 Com
GP161901 Com
July 2004
Upstream Page 1 of 29
Version 3.0.0
GP 16-19-01
July 2004
Table of Contents
1. Required References...................................................................................................6 1.1. 1.2. 1.3. 1.4. 1.5. GPExxonMobil Engineering Practices...........................................................6 ExxonMobil Data Sheets..................................................................................6 IECInternational Electrotechnical Commission..............................................6 IEEEInstitute of Electrical and Electronics Engineers....................................6 NFPANational Fire Protection Association.....................................................6
2. General and Design Conditions.................................................................................7 2.1. Use...................................................................................................................7 2.2. Heat Tracing Types..........................................................................................7 a) It withstands high temperature and corrosive atmospheres. ............................7 b) It has good physical strength but shall not be used in an area where it will be bent away from the heated equipment in order to access that equipment... .7 3. Design Requirements................................................................................................10 3.1. General Design Requirements.......................................................................10 c) Heat up times shall be as follows:.....................................................................11 1. Instruments and associated lines in all services: 46 hours............................11 2. Onsite, 2 in. and smaller process lines in critical service: 810 hours.............11 3. Onsite, 3 in. and larger process lines and equipment in critical service equipped with low temperature alarms wired to a control room: 1824 hours.............................................................................................................11 4. Non-critical onsite lines and equipment............................................................11 d) A critical electrical heat tracing service is a service where a freeze-up could create an unsafe condition or cause a unit upset/shutdown........................11 e) In general, onsite piping is considered non-critical, and the 1824 hour heat-up time is acceptable.........................................................................................11 f) On large lines, long lines, or similar high capacity electrical requirements for heat-up, the heat-up time may be lengthened in conjunction with a low temperature alarm to reduce the size of the electrical tracing system required. This heat-up may be lengthened to what is reasonable and practical for application.................................................................................11 3.2. Design Requirements.....................................................................................11 3.3. Complete Design Requirements....................................................................12 g) One drawing for each circuit.............................................................................12
UPST Page 2 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
h) Location of temperature sensor, cold junctions, power connection, splice, and terminations..................................................................................................12 i) All flanges, valves, pipe supports, tap lines, drains, pumps, vessels, nozzles, and instruments............................................................................................12 j) Length of cable on pipe and any extra for above items.....................................12 k) Circuit information and current requirements at minimum ambient startup and design temperature.......................................................................................12 l) Operation design conditions including area classification..................................12 m) Maximum heat trace length that can be protected by the nominated circuit protection......................................................................................................12 3.4. Special Design Requirements for Arctic Climates.........................................12 4. Specifications.............................................................................................................13 4.1. General Vendor Requirements.......................................................................13 4.2. MI/SI Cable.....................................................................................................13 4.3. Constant Wattage and Power Limiting Parallel Bus Cable............................13 4.4. Self-Regulating Polymer Cable......................................................................14 4.5. Constant Wattage Series Cable.....................................................................14 4.6. Skin Effect Heat Tracing.................................................................................15 n) System design...................................................................................................15 o) Transformers.....................................................................................................15 p) Controls.............................................................................................................15 q) Pull boxes..........................................................................................................15 r) Copper cable with high temperature insulation..................................................15 s) Copper plated terminals....................................................................................15 t) Splice kits...........................................................................................................15 u) Heat tube...........................................................................................................15 v) Terminal boxes..................................................................................................15 w) Power feed boxes.............................................................................................15 x) Cable lugs and connecting hardware................................................................15 y) Thermocouple or RTD with assembly for surface contact on heated pipe.......15 z) The heating system shall be designed to provide a balanced three-phase load. ......................................................................................................................15 aa) The Vendor shall provide detailed installation and test procedures for the heating system including welding specifications for all items......................15 4.7. Blanket Heaters..............................................................................................15 4.8. In-Line Heaters...............................................................................................15
UPST Page 3 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
bb) Main breaker...................................................................................................16 cc) Temperature controller....................................................................................16 dd) Over-temperature controller............................................................................16 ee) Contactors.......................................................................................................16 ff) Open circuit detection and alarm......................................................................16 gg) Short circuit detection and alarm.....................................................................16 hh) If specified, an over current and/or over voltage contact(s) (must be provided and have ground fault protection where the controller does not provide it). 16 5. Control, Distribution, and Alarm..............................................................................17 5.1. Control............................................................................................................17 5.2. Distribution......................................................................................................18 5.3. Alarms.............................................................................................................19 a) Loss of voltage at the end of line, or undercurrent on line, for every circuit. Circuits shall not alarm when tracing is not on.............................................19 b) Failure of temperature sensing unit or controller..............................................19 i) This is required for every temperature control device in the system.................19 2. Thermostat systems require separate thermostat............................................19 3. Thermocouple or RTD systems can use one sensor as long as open or short circuit alarms are included in controller........................................................19 4. A separate thermostat is required if the controller does not alarm in failed mode.............................................................................................................19 c) Ground fault trip.................................................................................................19 d) Total loss of voltage to the system....................................................................19 e) High temperature...............................................................................................19 f) Low temperature................................................................................................19 g) If specified, over current and/or over voltage....................................................19 6. Installation..................................................................................................................19 6.1. General...........................................................................................................19 6.2. Identification...................................................................................................21 6.3. Skin Effect Heat Tracing Installation..............................................................21 7. Testing........................................................................................................................22 a) When reeled cables are received at the job site...............................................22 b) After installation prior to insulation being installed............................................22 c) After installation prior to energizing for the first time.........................................22
UPST Page 4 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
8. Data Sheet..................................................................................................................22 Appendix: Completion of Data Sheet........................................................................23 Scope.............................................................................................................................23 A1. Page 1...................................................................................................................23 A2. Page 2...................................................................................................................23 A2.1. Sizing Information: Lines 1 through 16...................................................23 A2.2. Details of Heat Tracing after Sizing: Lines 12 through 31......................24 a) Enter T- for thermostat......................................................................................24 b) Enter TO- thermostat on overall ambient..........................................................24 c) Enter C- for controller........................................................................................24 d) Enter A- for always on.......................................................................................24 Record of Change.........................................................................................................25 Attachment: Purpose Codes Definitions...................................................................29
UPST Page 5 of 29
Version 3.0.0
GP 16-19-01
July 2004
1. Required References
This Section lists Practices and Standards that are generically referenced and assumed to be a part of this document. Unless otherwise specified herein, use the latest edition.
1.1.
1.2.
1.3.
1.4.
1.5.
NFPA 70
UPST Page 6 of 29
Version 3.0.0
GP 16-19-01
July 2004
2.1.
Use
Electric heat tracing (EHT) or other kind of warming equipment shall be used to maintain the minimum temperature of fluid contents in process equipment and piping subject to freezing, congealing, separation, excessive increases in viscosity or forming water by condensation. If product heat-up is required or overtemperature can degrade a product, it shall be noted on the ExxonMobil Data Sheets for this GP.
2.2.
2.2.1.
Steam tracing is covered in GP 50-01-02. Before choosing a type of heat tracing, the benefit and liabilities of both electrical heat tracing and steam tracing shall be considered. The following statements are some things that should be considered in regards to steam tracing. 1) Steam is typically easier to fix, commonly requires less initial design, and frequently has a lower installed cost than that of electrical heat tracing. 2) Steam shall not be considered for nonmetallic pipe or products that will be degraded at the temperature of the steam. 3) Steam tracing is often, but not always, the better choice for areas requiring temperatures above 100 F and locations where warmed equipment needs to be accessible for maintenance. 4) Steam tracing is cost-effective where high sheath temperatures of EHT and low auto-ignition temperatures are required due to area classification.
2.2.2.
MI/SI Cable
Mineral Insulated (MI) cable will be considered for all areas. 1) MI cable has long life characteristics. a) It withstands high temperature and corrosive atmospheres. b) It has good physical strength but shall not be used in an area where it will be bent away from the heated equipment in order to access that equipment. 2) Initial installed cost of MI cable is high and it requires detailed initial design information to purchase. 3) Silicone Insulated (SI) heater cable is not a preferred product of ExxonMobil and may be considered only if the cable(s) being investigated meet the requirements contained in IEEE 515 and with ExxonMobil approval. 2.2.2.1. Components This constant wattage type system shall consist of a solid metal sheath containing one or two conductors separated by mineral (or silicon, if approved) insulation. This mineral insulation shall be magnesium
UPST Page 7 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
oxide. The conductors will be resistance type heating elements with operating voltages up to 600 V. Thermostatic control shall be used with this system. 2.2.2.2. Sheath Types The cable outer sheathing material shall be capable of operating under high temperature and highly corrosive conditions. The sheath shall be stainless steel or Inconel (Alloy) 825. Owner's strong preference is for Inconel 825. However, if a stainless steel sheath is used, it shall be limited to a sheath temperature of 427C (800F) and a process maintain temperature no higher than 260 C (500F).
2.2.3.
Constant Wattage Parallel Bus cable uses two buses with spiraled resistance wire connected between them at intervals along the cable. 1) If the EHT system is engineered properly and this cable is installed correctly, this product has a reliable life. 2) Cable sections can burn out if they are crossed over one another (doubled up) or they are handled roughly. 3) Do not use on small-bore pipe that could freeze if a 2-ft section were to lose heat. The failure of [multiple] heating "zones" is hard to detect with this cable. The result of this loss of heater capacity results in "cold spots."
2.2.4.
Constant Wattage Series cable, like MI, uses series resistance buses and must be closely designed for the application. 1) It is a cost-effective method to heat long existing lines and has good reliability. 2) It is typically not cost-effective for lengths less than 500 ft. 3) Whenever practical, the cable shall be installed with three wires and connected three-phase.
2.2.5.
Self-regulating polymer cable is the least installation-sensitive of all the electric types and requires the least initial design. 1) It performs well in complex piping arrangements, such as instrument level columns. 2) This type cable has an average installed cost, can be cut to length at site, and has a low energy usage. 3) A disadvantage is that, if not specified and installed properly, it has the shortest life of all the different cable designs. However, if done properly, it will last at least 10 to 15 years before replacement is required.
2.2.6.
Power Limiting Parallel Bus is a parallel heating cable formed by a coiled resistor alloy heating element wrapped around two parallel bus wires. It is called power limiting because it reduces power output as ambient temperature increases.
UPST Page 8 of 29
Version 3.0.0
GP 16-19-01
July 2004
1) This heater cable is a high output power cable that is rated for high maintain and exposure temperatures (not as high as MI, however). This product can also be cut to length at the job site, making installation simpler. 2) This product must be specified with a metal braid covered by an outer polymer base jacket for corrosion resistance. 3) This product is fairly new and therefore requires the approval of an ExxonMobil Electrical Engineer before use.
2.2.7.
1) The Skin Effect Heat Tracing system is a constant wattage system consisting of a ferromagnetic, small diameter, carbon steel pipe or heat tube. This tube is connected to the process pipe being heat traced by means of straps, heat transfer cement, skip welding, or continuous fillet weld (on both sides of pipe interface). An insulated copper cable is contained inside the heat tube and is bonded to the pipe at the end. The "inner wall" of the heat tube becomes the return path of the circuit. The current flowing in the heat tube causes it to become the heating element. There is no current or voltage on the "outer wall" of the heat tube due to the "proximity effect" of the current caused by the internal wire's magnetic field. 2) Skin effect heating is physically similar to a single conductor in rigid steel conduit. While current flows in the inner surface envelope, the outer surface of the heating tube is at ground potential and there is no shock hazard (per NFPA 70 and ANSI/IEEE 844). However, where voltages higher than 600 V are used, high voltage warning signs shall be provided at all pull and junction boxes and at intervals along the line. 3) This system may be installed both below ground and above ground and may be grounded without affecting cathodic protection systems. 4) The Skin Effect system is suitable for pipelines, long rundown lines, and transfer lines (600 m [2000 ft] or longer) where very few valves and flanges are present. 5) When welding the heat tube to piping, care shall be taken to avoid locations where moisture can collect in the piping and cause corrosion. Welding to high-strength, low-alloy piping shall be done only with prior ExxonMobil approval. All welding shall conform to GP 03-19-02. 6) Installed cost is very high on existing pipe, but can be cost-effective on new installations with limited turns and valving. It may also be cost-effective on some existing installations such as long transfer lines. This is due to the need for fewer power connections, limiting the associated conduit and wiring, and being able to cut down on the needed control points.
2.2.8.
Steam is the preferred way to heat a vessel or tank. However, small tanks, nonmetallic, or units containing sensitive materials that will degrade if heated to available steam temperatures are candidates for blanket electric heaters.
2.2.9.
In-Line Heating
In-line heating of gas and liquids shall be done with circulation type MI heating elements. These types of heaters shall often be used when small streams of gas need to be reheated after expansion and a steam exchanger cannot be justified.
UPST Page 9 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
3. Design Requirements
3.1.
3.1.1.
Electrical heat tracing is recommended under the following circumstances: 1) Where nonmetallic pipe requires heat tracing. 2) Where steam tracing temperatures may degrade the product or corrode the line. 3) Where pour point protection or dew point protection is specified. 4) Where precise temperature control of the line is required.
3.1.2.
Approval
1) Electrical heat tracing cable and all ancillary materials shall be approved and listed for use in Class 1, Division/Zone 2 locations as a minimum, even though the location may be unclassified. 2) Electrical heat tracing cable and ancillary materials shall be approved for the purpose and area classification by Factory Mutual (FM), Underwriters Laboratories (UL), or other recognized testing agency. 3) The heat tracing cable shall not exceed 80 percent of the ignition temperature of the gas or vapor that could be present (using degrees Celsius). The cable shall have a certified maximum temperature class (T rating). 4) Class 1, Division/Zone 1 rated heater cables and components are higher cost (materials and labor) than their lesser rated counterparts. Equipment manufacturer approval of all Division/Zone 1 applications is required prior to installation.
3.1.3.
Instruments
1) All instruments, taps, gauges, and piping associated with the same process line may be traced with a common circuit if appropriate. When more than one instrument is connected to a common circuit, each instrument shall have a local disconnecting means. 2) Instruments that are connected to associated process lines with process sensing lines not exceeding one process line diameter in length may be heat traced with the heat tracing cable used for the process line. Consideration shall be given to making all process instruments a separate circuit with separate temperature control (i.e., RTD).
3.1.4.
Capacity
1) Heat tracing circuits shall be designed for 125 percent of heat loss at worst ambient conditions with 90 percent of rated voltage. For piping less than 3 in. (760 mm) in diameter, the heat tracing circuits shall be designed for 135 percent of heat loss. However, the 135 percent figure can be relaxed with Owner's permission if over heating of the liquid is a potential safety problem (i.e., safety shower). 2) Special consideration shall be given to heat tracing requirements for pumps. Pumps generally represent a large heat sink. The heat loss for pumps in critical service shall be determined by finite
UPST Page 10 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
element analysis and consultation with the heat tracing system manufacturer. The minimum heating capacity requirement shall be 200 percent of the heat loss determined by standard calculation methods or 125 percent of the heat loss determined by finite element analysis. 3) Spiral wrapping of heat tracing cable in EHT applications is not allowed; instead, higher wattage cable or multiple runs shall be used. 4) The heat tracing cable output under the most severe conditions shall not result in a system temperature that exceeds the maximum allowed by the process. Controllers with a high temperature cutout may be employed if needed. 5) High heat loss at pipe flanges, valves, dead legs, support shoes, and other appurtenances shall be compensated by use of additional lengths of heat tracing in accordance with the manufacturer's instructions. 6) The heat-up times must be given special attention. c) Heat up times shall be as follows: 1. Instruments and associated lines in all services: 46 hours 2. Onsite, 2 in. and smaller process lines in critical service: 810 hours 3. Onsite, 3 in. and larger process lines and equipment in critical service equipped with low temperature alarms wired to a control room: 1824 hours 4. Non-critical onsite lines and equipment d) A critical electrical heat tracing service is a service where a freeze-up could create an unsafe condition or cause a unit upset/shutdown e) In general, onsite piping is considered non-critical, and the 1824 hour heat-up time is acceptable. f) On large lines, long lines, or similar high capacity electrical requirements for heat-up, the heat-up time may be lengthened in conjunction with a low temperature alarm to reduce the size of the electrical tracing system required. This heat-up may be lengthened to what is reasonable and practical for application.
3.1.5.
Moisture prevention
The following minimum requirements shall be met to maximize the design life and integrity of the installation. 1) In offshore environments, non-hygroscopic insulation shall be used. 2) Heat trace penetrations shall be via dedicated bushings or conduits. 3) All heat trace penetrations shall be sealed to avoid moisture ingress.
3.2.
Design Requirements
Before detailed design begin, an ExxonMobil Electrical Engineer shall review: 1) Insulation "K" factors and thicknesses to be used. 2) Local conditions used in heat loss formulas such as ambient temperature variations, startup temperature, and wind speed. 3) Sheath/surface temperatures for Division/Zone 1 and 2 areas.
UPST Page 11 of 29
Version 3.0.0
GP 16-19-01
July 2004
4) Temperature maintain requirements, product heat-up time if required, and location of dead legs requiring individual temperature control. 5) Any over-temperature condition that may degrade the product, be a safety concern, or lead to excessive corrosion. 6) Control and alarm philosophy. 7) Tracing types to be considered. 8) Voltage level used (120 VAC and 230/240 VAC grounded system is only approved method for all except Skin Effect EHT; others shall be approved). 9) Design deliverables per Section 3.3.
3.3.
1) Piping isometrics showing complete tracing. (With approval of an ExxonMobil Electrical Engineer, this may not be needed, or the requirement may be reduced for some types of tracing.) Full isometrics shall show, as a minimum, the following: g) One drawing for each circuit. h) Location of temperature sensor, cold junctions, power connection, splice, and terminations. i) j) All flanges, valves, pipe supports, tap lines, drains, pumps, vessels, nozzles, and instruments. Length of cable on pipe and any extra for above items.
k) Circuit information and current requirements at minimum ambient startup and design temperature. l) Operation design conditions including area classification. m) Maximum heat trace length that can be protected by the nominated circuit protection. 2) Complete the ExxonMobil Data Sheets for this GP or approved vendor sizing program for all tracing, including the maximum sheath temperature for hazardous conditions, tracing type, amount used at all valves, shoes, flanges. For a detailed explanation of requirements, see Section 8 and the ExxonMobil Data Sheets for this GP. 3) Heat tracing panel schedule listing equipment to be traced. 4) Connection diagram. 5) Junction box and thermostat/control sensor location drawing. 6) Alarm system wiring diagrams. 7) Installation details for the heat tracing system. 8) Commissioning Data Sheet for startup. 9) Bill of Material (BOM) of EHT materials required.
3.4.
1) Special consideration shall be given to maintenance of heat trace systems in these climates. When operators need to work on this equipment they are often dressed in apparel that is not conducive to working on small parts and in tiny spaces. It may also be advisable to procure special maintenance
UPST Page 12 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
products such as portable maintenance sheds/tents (perhaps with heaters) which will allow operators to warm up the immediate environment surrounding whatever device they are working on. 2) When equipment, signs, and maintenance access ways are designed, particular attention shall be paid to the large amounts of snow falls and snow drifts that can be expected in these regions. In areas where snow is going to be allowed to accumulate, signs shall be posted both at a height higher than the highest snow level expected and also on the equipment itself. 3) Inrush currents in most heater cable in cold temperatures are much higher than at warmer temperatures. This fact must be accounted for when choosing the heater cable and associated protective devices/settings. 4) The effects of large quantities of ice must be considered. Two particular problems are its weight and the problem of falling ice.
4. Specifications
4.1. General Vendor Requirements
Specifications for the installation and testing of electrical heat tracing systems shall be prepared by the Vendor and submitted for ExxonMobil approval.
4.2.
MI/SI Cable
1) Cable shall be resistance wire surrounded by compressed mineral insulation (or silicon dioxide if approved) with a metallic sheath of stainless steel or Inconel 825 (Inconel 825 is preferred). 2) Cold sections/leads shall be 3 ft to 7 ft long and shall have a stainless steel or Inconel sheath. The line side of the cold section shall have a factory applied moisture-proof connection with 1/2 in. or 3/4 in. male conduit connector and a minimum 9 in. power leads. 3) Maximum cable lengths shall be 150 ft within process areas and 250 ft once outside of [crowded] process areas. All cable shall be factory fabricated and shipped complete for installation. Factory hot and cold splices shall be brazed or silver soldered. 4) Each cable shall be shipped in an individual package with a stainless steel cable tag which includes the catalog number, circuit voltage, length and wattage. 5) The entire cable shall be rated for 600 V. 6) Each cable shall be capable of field bending to an inside radius of six times the cable diameter without damage.
4.3.
1) Heating cable shall have nickel plated copper bus wires insulated with a fluoropolymer. The bus wires shall be able to provide service up to 250 ft at designated application voltage without any loss of cable output wattage due to voltage drop. Maximum lengths shall be reviewed by an ExxonMobil Electrical Engineer. 2) A protective braid of plated copper shall be applied with an overall fluoropolymer jacket.
UPST Page 13 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
3) Termination, splice, and power connection kits shall be part of the system and approved for the area classification. All kits shall be designed for access above the final insulation. 4) A full description of the cable construction and installation requirements shall be provided with the Vendor's bid. 5) The heating cable shall be supplied on reels and cut to length at the job site. Minimum reel length shall be specified on the purchase order. 6) Cable insulation shall be rated for exposure temperatures of 204 C (400F) while off and continuous 121C (250F) while on. Insulation shall also be rated for 600 V. 7) All systems shall be approved for installation in Class 1, Division/Zone 2 atmospheres.
4.4.
1) Heating cable shall consist of an extruded conductive polymer core or a nonconductive core with wrapped polymer fiber elements between two copper bus wires and covered with a fluoropolymer jacket. A nickel or tin-plated copper braid shall be installed above this jacket with another overall fluoropolymer jacket. 2) The bus wires and cable in general shall be capable of being used up to a length of 240 ft at the designated application voltage without falling under rated cable output wattage due to voltage drop (i.e., published unit wattage's verses temperature curve values). 3) Cable insulation shall be rated for exposure temperatures of 204 C (400F) while off and continuous temperatures of 121C (250F) while on. Insulation shall also be rated for 600 V. Exposure to high temperature shall not cause a loss of more than 10 percent of rated output during cable life. 4) "Low temperature" self-regulating cable (maintain temperatures of 150 F and exposure temperatures of 185F) shall only be used with approval of ExxonMobil Electrical engineer. This is because it inevitably gets mistakenly installed on pipes that require steam clean out. 5) Termination, splice, and power connection kits shall be part of the system and approved for the area classification. All kits shall be designed with proper access through the final piping insulation and have proper external nameplates such that operations personnel can easily locate the devices in spite of insulation. 6) A full description of the cable construction and installation requirements shall be provided with the Vendor's bid. 7) The heating cable shall be supplied on reels and cut to length at the job site. Minimum reel length shall be specified on the purchase order. 8) All systems shall be approved for installation in Class 1, Division/Zone 2 areas as a minimum.
4.5.
1) Cable shall consist of multiple resistance cables with fluoropolymer insulation, plated copper jackets, and overall fluoropolymer jackets. 2) Cable insulation shall be rated for exposure temperatures of 204 C (400F) while off and continuous temperatures of 121C (250F) while on. Insulation shall also be rated for 600 V.
UPST Page 14 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
3) Cable shall come cut to length with factory installed end terminals and 5 ft non-heated lead connection. Lead connections shall have stainless armor with 1/2 or 3/4 in. conduit connections on end and an additional 9 in. of lead wire. 4) Each cable shall be shipped in an individual package with a stainless steel cable tag which includes the catalog number, circuit voltage, length and wattage. 5) Cable system shall include all hardware required and be approved for Class 1, Division/Zone 2 areas.
4.6.
1) The Vendor shall provide all design documentation and hardware required which shall include but not be limited to: n) System design o) Transformers p) Controls q) Pull boxes r) Copper cable with high temperature insulation s) Copper plated terminals t) Splice kits u) Heat tube v) Terminal boxes w) Power feed boxes x) Cable lugs and connecting hardware y) Thermocouple or RTD with assembly for surface contact on heated pipe 2) The heating system may be supplied as part of an entire system including process pipe, insulation, and heat tube. 3) The system shall be approved for installation in a Class 1, Division/Zone 2 area. z) The heating system shall be designed to provide a balanced three-phase load. aa) The Vendor shall provide detailed installation and test procedures for the heating system including welding specifications for all items.
4.7.
Blanket Heaters
1) Blanket heaters shall be silicone rubber with embedded metal ground grid. 2) They shall be approved for installation in Class 1, Division/Zone 2 locations and require ground fault protection the same as other systems. 3) Maximum application temperature is 121C (250F).
4.8.
In-Line Heaters
1) The heating chamber shall be, as a minimum, Schedule 40 pipe with ASME code stamp for greater than or equal to piping classification. 2) A drain connection shall be an integral part of the body to allow draining of the chamber.
UPST Page 15 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
4.8.1.
Heating Bundle
1) The internal, direct contact heating bundle shall be constructed of tubular elements with at least stainless steel sheathed heaters welded into a round steel flange. A center well shall project midway into the center of the bundle and shall contain a thermocouple or RTD set for the bundle overtemperature protection. The well shall comply with ExxonMobil Instrument Guides for the service. 2) The tubing type shall be specified by type, size, wall thickness, and quantity. The heater shall be specified as electric or steam. The heating element and the tube(s) shall be cabled together to allow for uniform thermal expansion and contraction. Electric heater and the tubes shall be continuously wrapped by heat reflective tape (heat barrier). The bundle then shall be wrapped again with adequate non-hygroscopic glass fiber insulation. The bundle shall then be covered by an extruded polymer jacket.
4.8.2.
Terminal Box
1) The tubular element terminals and the thermostat leads shall be brought out into a terminal box of cast construction (other box constructions if approved) that is on the opposite side of the round flange. The elements shall be connected together for a balanced three-phase load and labeled as T1, T2, and T3. 2) If specified, the terminal box shall have a space heater.
4.8.3.
Controls
1) Controls shall be in an enclosure located remotely, which is properly rated for its location. Minimum enclosure types shall be NEMA 1 with gasket for climate controlled indoor locations, NEMA 12 for non-climate controlled indoor locations, NEMA 4X for non-classified outdoor locations, NEMA 7 for hazardous indoor locations, and explosion-proof NEMA 4X for hazardous outdoor locations. Controls shall include: bb) Main breaker cc) Temperature controller dd) Over-temperature controller ee) Contactors ff) Open circuit detection and alarm gg) Short circuit detection and alarm hh) If specified, an over current and/or over voltage contact(s) (must be provided and have ground fault protection where the controller does not provide it) 2) For units that have wide load requirements, consideration shall be given to SCR control.
4.8.4.
Contactors
Contactors shall not be loaded to more than 80 percent of their amperage rating.
UPST Page 16 of 29
Version 3.0.0
GP 16-19-01
July 2004
5.1.1.
Circuits
1) Either controllers or circuit breakers shall provide 30 mA ground fault protection on all circuits. 2) Circuits for lines handling different process fluids shall be supplied from separate circuits. 3) Lines that may concurrently contain flowing and static fluid, or be out of service, shall be separately controlled. 4) Generally, circuits for dead-end lines for draining, venting, flushing, and normally closed bypass shall not be combined with the same control for circuits used for main process lines. However, circuits for those lines not exceeding three times the main process line diameter in length may be combined with the same control. When considering EHT circuits on process applications, all conceivable flow paths should be independently measured and controlled (including bypasses around control valves). 5) Provisions shall be made in the circuitry to facilitate removal of pumps or valves without affecting the heat tracing on associated equipment or process lines. Where practical, heat tracing cables for pumps and valves shall be provided with local disconnecting means to facilitate removal without affecting operation of heat tracing on connected process lines. When using a removable cover, install tracing on the wall of the cover rather than attaching to pump or valve. 6) When self-limiting heat tracing cables are specified, it is possible that the criteria noted in Items 3 through 5 may be waived, provided that none of the design temperature requirements are jeopardized. 7) In all cases, manufacturer's recommendations shall be strictly followed for the installation of electric trace cable.
UPST Page 17 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
8) The installed electric trace cable shall allow maintenance activities, including valve, pump, and instrument removal, without damage to the trace integrity.
5.1.2.
Thermostats
1) Thermostats shall be provided as part of the heat tracing system and shall have sufficient contacts to energize the tracing circuit and to alarm for failures. Contacts shall be loaded at less than 80 percent of published amperage ratings. 2) All hot legs shall be opened by the thermostat or a contactor shall be used to provide the necessary contacts. 3) The thermostat manufacturers name and temperature range shall be submitted for approval. 4) All thermostats shall be factory calibrated and tested for proper contact operation before shipment. 5) Thermostat capillary tubing shall be protected by an armor sheath. 6) For piping that is traced for water freeze protection, a main contactor and ambient sensing thermostat may energize all of the heat tracing at once. 7) No more than six cable circuits shall be operated from one thermostat for other than ambient service.
5.2.
Distribution
1) Heat tracing systems shall have designated transformers and panel boards for proper distribution. 2) The transformer shall have a three-phase 120/208 VAC secondary grounded neutral. For large diameter pipe with high heat requirements, a three-phase 480 or 380 VAC grounded neutral system may be used (transformer still required). Other voltage levels may be used as approved by ExxonMobil Engineer and if new voltage level(s) is common to both the facility and the local region. 3) Smaller systems may be connected to existing panels with local site approval. 4) Transformers shall have nominal plus four 21/2 percent taps, two above and two below nominal voltage (these taps may vary with Skin Effect Heat Tracing systems).
5.2.1.
Independent Operation
The heating system shall be designed such that each pipeline heating system may be independently operated, turned on or off, or locked out, without affecting other pipeline heating systems.
5.2.2.
Location
1) Wherever possible, panels shall be located inside in a nonhazardous location. 2) All outdoor panels, junction boxes, and control enclosures shall be rated NEMA 4X as a minimum.
5.2.3.
Breakers and circuit wires shall be sized in accordance with Article 427 of the NEC (NFPA 70). For international applications, breakers and circuit conductor sizes shall comply with the appropriate local regulations for short circuit protection and earth fault detection in the applicable hazardous area. 1) Breakers shall be sized for a maximum load of 100 percent of rated current at the minimum design ambient.
UPST Page 18 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
2) Normal operating load for circuits shall not exceed 80 percent of breaker rating. 3) No single circuit shall be greater than 50 amperes or the maximum allowed by the hazardous certification for the heat tracing. 4) Where controller does not provide ground fault, breakers shall be 30 mA GFI type. 5) The system shall be designed with 25 percent spare branch breakers and 25 percent spare system capacity. 6) Breakers need to be selected and set to properly handle heater cable inrush currents.
5.3.
Alarms
1) All heat tracing systems shall alarm to a manned location. If tracing is in a remote location where alarming is not feasible, then a local beacon is acceptable if approved by site operations and maintenance. 2) Summary alarms to manned locations are allowed as long as each alarm is separately annunciated at the remote point. If the alarm is acknowledged at a remote point, it shall still indicate, but shall clear the summary alarm for subsequent failures. 3) Heat tracing requires the following alarms to be separately indicated: a) Loss of voltage at the end of line, or undercurrent on line, for every circuit. Circuits shall not alarm when tracing is not on. b) Failure of temperature sensing unit or controller. i) This is required for every temperature control device in the system. 2. Thermostat systems require separate thermostat. 3. Thermocouple or RTD systems can use one sensor as long as open or short circuit alarms are included in controller. 4. A separate thermostat is required if the controller does not alarm in failed mode. c) Ground fault trip. d) Total loss of voltage to the system. e) High temperature f) Low temperature g) If specified, over current and/or over voltage
6. Installation
6.1. General
Details not covered by this GP or local requirements shall be per the Manufacturers details. Any conflicts shall be reported to an ExxonMobil Project Electrical Engineer.
UPST Page 19 of 29
Version 3.0.0
GP 16-19-01
July 2004
6.1.1.
Heating Cables
1) Heating cable shall be installed to permit ease of maintenance. Flexibility, to allow heating cable to be moved away from areas where maintenance shall be required, shall be provided by accordion type loops in cable or separate circuits that can be totally removed before equipment is serviced. Where bends are required in the heating cables, the minimum bending radius specified by the Manufacturer shall not be exceeded. 2) For installations 66C (150F) or below, heating cables shall be fastened to pipes with fiberglass tape or ty-raps. For MI cable, 1/2 in. wide stainless steel bands shall be used. Tracing is to be attached at intervals of 2 ft or less (1 ft or less is preferred).
6.1.2.
Temperature Sensor
1) Temperature sensing bulbs shall be secured to pipeline with ty-rap or Scotch 27 tape, at least 90 degrees around pipe from any heat tracing. Remove any scale at the contact point prior to installation. The thermostat shall be installed in a location to provide maximum accessibility and support for the capillary. 2) The bulb or any temperature sensor shall be located at least 3 ft from any heat sink. 3) Thermostats and sensors shall be easily accessible for adjustment and maintenance. Thermostats shall be mounted on stands and not attached to the process line. 4) The heating cable on pipelines or equipment shall be maintained in continuous contact insofar as practical in order to maximize heat transfer. 5) Insulating cement shall not cover heating cables. When pumps, elbows, etc. are to be insulated using insulating cement, the heating cable shall first be covered with aluminum tape to prevent contact when the cement is applied. 6) When cables are installed on bolted equipment, care shall be taken to provide extra heating while continuing to allow access to bolts. 7) Heating cables that are external to the thermal insulation shall be protected from mechanical damage by metallic channel or conduit. Particular care shall be exercised where the heating cable passes through the insulation protection to avoid damage to the cable sheath. Similar care shall be taken at other locations, such as at valve flanges, where the insulation cover may interfere with heating cable.
6.1.3.
Miscellaneous
1) The junction of MI cable hot and cold sections shall have a strap installed on each side of the junction. Do not bend MI cable within 3 in. of any silver soldered fitting. 2) Sample lines to analyzers shall be pre-assembled tubing bundles with approved heat tracing system. Control, alarm, and distribution requirements are no different from other tracing systems. 3) Splices and tee connections for branches shall be used only where necessary. Where branches are required, the preferred method is to double-back along shortest section of piping (except where overheating of product is possible). 4) Metallic cladding shall be earthed via dedicated earth straps to ensure earth continuity for operation of earth fault protection. Earthing straps shall be a minimum of every 5 m.
UPST Page 20 of 29
Version 3.0.0
GP 16-19-01
July 2004
5) Drilling and tapping into metallic clad heat trace lines shall not be allowed due to risk of trace damage. 6) All electric trace cable shall be mechanically protected. This shall be via the insulation and cladding, conduit or steel angle sections. 7) All metallic components shall be earthed, such that circulating currents are not created. 8) Junction boxes shall be rigidly supported.
6.2.
Identification
1) Lead wires from the panel to the pipe tracing shall be marked at the panel and any junction point per connection drawings. 2) All boxes associated with the heat tracing (power connection, splice, and terminating) shall have a laminated plastic label listing both the panel and the circuit to which the heat tracing is connected. 3) All panels shall have a laminated tag with the panel number, use (heat tracing), feeder number, and panel schedule drawing number. 4) All panels shall have a typed weatherproof circuit schedule. 5) MI cable shall have stainless steel tags with catalog number, length, voltage, and wattage indicated installed on cold section. 6) Caution signs shall be securely installed at electrical traced equipment and at 3 m (10 ft) intervals on alternating sides of electrically traced pipelines. Caution signs shall be positioned where they are highly visible to personnel. Electrically traced pipelines on overhead pipe racks shall have the caution signs installed on the top and bottom. 7) Controllers and thermostats shall have laminated tags with panel number, circuit number, and line designation. 8) Any items covered by insulation and cladding which may require period maintenance or use shall have a plastic placard on the outside of the cladding indicating the item's location.
6.3.
1) Vendor's installation details and test procedures shall be followed. 2) The temperature sensing thermocouple for the system shall be located no more than 15 ft from main power connection point. 3) The pipe shall be grounded at each end and, at a minimum, every 600 m in between. Ground lugs welded to the pipe shall extend beyond the insulation jacketing for ground connection. Where a buried pipeline is cathodically protected, special consideration shall be given to the grounding system. 4) The Skin Effect Vendor shall approve the length and number of bends in each pull between boxes. 5) Skin Effect tube welded splices between lengths of heated pipe shall be free of weld material inside and tube ends shall be inspected for burrs before splicing. 6) Terminals on pipes shall be coated with a rust inhibiting, conductive compound before making connections. Belleville type washers shall be used for all terminations. All terminations shall be inspected by ExxonMobil before closing the box and installing insulation
UPST Page 21 of 29 For ExxonMobil Use Only
ExxonMobil Development Company
Version 3.0.0
GP 16-19-01
July 2004
7. Testing
1) For heating cable systems, each cable and each circuit shall be field tested in accordance with the manufacturer recommendations. 2) An insulation resistance test and a resistance test shall be performed as follows: a) When reeled cables are received at the job site b) After installation prior to insulation being installed c) After installation prior to energizing for the first time 3) A final system test shall require full operation of all heaters for 24 hours with the thermostats/controllers turned up to energize tracing for the entire period. Current and ambient readings on each circuit shall be made at beginning and every four hours. 4) Testing of transformers, wiring, and panels shall be per GP 16-13-01. 5) All testing shall be documented and witnessed. 6) All earth fault protective devices shall be tested for tripping current level and opening time prior to energizing of the circuit.
8. Data Sheet
T161901C01 (see the ExxonMobil Data Sheets for this GP) is for piping only; equipment being traced shall require individual attention separate from T161901C01. Refer to the instructions in the Appendix to this GP when completing T161901C01.
UPST Page 22 of 29
Version 3.0.0
GP 16-19-01
July 2004
A1. Page 1
1) General Section: Required information on area classification and T rating, and local ambient conditions. 2) Electrical System Information: Required information on system voltage at heat tracing distribution panel. 3) Control Information: List type of control for individual circuits; one Data Sheet may have a mix of control methods: always on, thermostat or controllers. Be sure to list the catalog number for each control type. This section is required for final Data Sheet information; this may be decided when heat trace sizing is performed or Vendor may specify. 4) Reference Drawings: Required for final Data Sheet.
A2. Page 2
General: Lines 1 through 16 of T161901C01 are required to get Vendor bid for heat tracing systems.
UPST Page 23 of 29
Version 3.0.0
GP 16-19-01
July 2004
Line 6: Actual minimum and maximum temperature limits that the process is not to exceed. Lines 5 and 26 shall be within this range. Line 7: Steamout temperature is the maximum process temperature to which the heat tracing shall be subjected. Lines 816: Details of pipe configuration. Line 14, for additional heat sinks, shall be given in equivalent pipe lengths. The foot per item shall be supplied after tracing is sized.
UPST Page 24 of 29
Version 3.0.0
GP 16-19-01
July 2004
Record of Change
Version 1.0.0
Location Action Description Initial Publish.
Date: 07/01
Version 2.0.0
Section 2.2.2, Item 1) a) Section 2.2.2.1 Modification Modification
Date: 08/02
a) It withstands high temperature and corrosive and Division 1 areas atmospheres. Changed the first sentence to read as follows: The constant wattage system will shall consist of a solid metal sheath of stainless steel or Inconel containing one or two conductors separated by mineral or silicon insulation.
Section 2.2.7.2
Modification
The first sentence has been changed to read as follows: The benefits of SECT are as follows. Design shall be done by a given below. A specialty company shall perform design after piping design is finalized.
Entire section was added. 8) Voltage level used (120V120 VAC and 230/240 VAC grounded system is only approved method, others shall be approved). e) Circuit information and current requirements at minimum ambient start up and design temperature. g) Maximum heat trace length that can be protected by the nominated circuit protection.
Modification
The last sentence was modified to read as follows: See For a detailed explanation of requirements, see Section 8 and the ExxonMobil Data Sheets for this GP for detailed explanation of requirements.
Modification
The second sentence was changed to read as follows: The bus wires shall be capable of being used able to provide service up to 250 ft at designated application voltage without any loss of cable output wattage due to voltage drop.
Addition
7) All systems shall be approved for installation in Class 1, Division 2 areas as a minimum.
UPST Page 25 of 29
Version 3.0.0
GP 16-19-01
July 2004
Modification
First sentence changed to read as follows: 2) Process temperature maintain shall be done maintained with controllers.
Modification
First sentence changed to read as follows: 3) Instruments Each instrument shall have their own thermostats but an individual thermostat; however, instruments may be heated using pipe heat tracing line.
Section 5.1.1
Addition
7) In all cases manufacturers recommendations shall be strictly followed for the installation of electric trace cable. 8) The installed electric trace cable shall allow maintenance activities, including valve, pump and instrument removal, without damage to the trace integrity.
Modification
Second sentence in Item 2 changed to read as follows: For large diameter pipe with high heat requirements, a three-phase 480 or 380 Volts AC grounded neutral system can may be used (transformer still required).
Section 5.2.1
Modification
The heating system shall be so designed such that each pipeline heating system can may be independently operated, turned on or off, or locked out, without affecting other pipeline heating systems. Breakers and circuit wires shall be sized in accordance with Article 427 of the NEC. For international applications, breakers and circuit conductor sizes shall comply with the appropriate local regulations for short circuit protection and earth fault detection in the applicable hazardous area. 1) Breakers shall be sized for a maximum load of 100 percent of rated current when turned on at 40F. the minimum design ambient. 2) Normal operating load for circuits shall not exceed 80 percent of breaker rating. 3) No one single circuit shall be greater than 30 amperes . Where ground fault is not provided or the maximum allowed by controller, breakers will be 30 mA EPD type. the hazardous certification for the heat tracing. 4) Where controller does not provide ground fault, breakers shall be 30 mA GFI type. 5) The system shall be designed with 25 percent spare branch breakers and 25 percent spare system capacity.
Section 5.2.3
Modification/ Addition
Addition Modification
5) High temperature 6) Low temperature First sentence changed to read as follows: 5) Heating cables shall not be covered by insulating cement. Insulating cement shall not cover heating cables.
UPST Page 26 of 29
Version 3.0.0
GP 16-19-01
July 2004
Section 6.1.3
Addition
4) Metallic cladding shall be earthed via dedicated earth straps to ensure earth continuity for operation of earth fault protection. Earthing straps shall be a minimum of every 5m. 5) Drilling and tapping into metallic clad heat trace lines shall be avoided where possible, due to risk of trace damage. 6) All electric trace cable shall be mechanically protected. This shall be via the insulation and cladding, conduit or steel angle sections. 7) All metallic components shall be earthed, such that circulating currents are not created. 8) Junction boxes shall be rigidly supported.
Section 7
Modification
1) For heating cable systems, each cable and each circuit shall be field tested in accordance with the Manufacturer's manufacturer recommendations. 2) An Insulation insulation resistance test and a resistance test shall be performed on as follows: a) When reeled cables when are received at the job site, and again after b) After installation prior to insulation being installed. c) After installation prior to energization for the first time
Section 7 Section 8
Addition Modification
6) All earth fault protective devices shall be tested for tripping current level and opening time prior to energization of the circuit. Last sentence changed to read as follows: Refer to the instructions in the Appendix to this GP when filling out completing T161901C01.
Appendix Scope
Modification
T161901C01 can may be used for one installation where the page one information does not change; multiple page two's pages two may be attached. If the area classification, T rating, distribution panel, controller or thermostat type or alarm system changes, a separate data sheet shall be required. Last two sentences changed to read as follows: Make Be sure to list the catalog number for each control type. This section is required for final Data Sheet information, but; this may not be decided when heat tracing trace sizing is done performed or Vendor may be left for the Vendor to specify.
Appendix Section 1
Modification
Modification
Lines 816: Details of pipe configuration. Line 14, for additional heat sinks, shall be given in equivalent pipe lengths. The foot per item is to shall be supplied after tracing is sized.
Version 2.0.0
Date: 10/03
Global Practice version number and format updated to comply with new process; however, original publish date remains, and no content was modified.
UPST Page 27 of 29
Version 3.0.0
GP 16-19-01
July 2004
Version 3.0.0
Throughout GP. Modifications, Deletions, Additions Multiple general revisions throughout GP.
Date: 07/04
UPST Page 28 of 29
Version 3.0.0
GP 16-19-01
July 2004
I M
Operational Safety:
UPST Page 29 of 29
Version 3.0.0