1.0 INTRODUCTION HISTORY Drainage is the natural or artificial removed of surface and sub-surface water from an area.

Many agricultural soils need drainage to improve production or to manage water supplier. 1.1 STATEMENT OF THE PROBLEM Drains cover damage problem always going on especially in residential areas and in pedestrian mall among the problem is theft. Use of iron and concrete as material drain cover still having problem for example theft, rust, and could not hold burden that extreamlly heavy. Danger to pedestrian because they do not notice when walk and can cause injury. Authorities like city council rarely care damage problem and loss of drain cover. Therefore, we propose to replace iron drains cover and concrete drains cover with fiber carbon drains cover. 1.2 AIM OF THE PROJECT The project is to redesign the old conventional drains cover to a new one. This project done because we get the feedback from the resident that the drains cover always damage or lost. 1.2.1 Objective One To reduce iron type drain cover theft. 1.2.2 Objective Two To improve life span and durability 1.2.3 Objective Three To reduce maintenance cost

1.3.0 THE SCOPE OF THE PROJECT 1.3.1 The scope of this project is related in highway and traffic. 1.3.2 Usually using iron and concrete drains cover, it will rust or broke. 1.3.3 Because of this problem, it will be dangerous to user of side walk and road user. 1.3.4 The project will decide at Taman Chempaka. We chose this place to this our project because its very near for us and easier for our project. 2.0 PROPOSED METHODOLOGIE 2.1 THE APPROACH
Make notice on project that will be done to Ipoh City Council (MBI) to get approval. Identify the place to do the project Get specifications drain cover from Public Works

1ST Step

Department (JKR)

2nd Step

Redesign the product Make a example of the product Test the example of the product at the laboratory. Among test that will be done is tension test and compression test.

3rd Step

Go to the site of the project and replace the old drains cover with the redesign drains cover Test the drains cover about a one month. Making observations on the state of drains cover for a month and make conclusion.

Fiber carbon rod

Fiber carbon texture

Fiber carbon cover 2.2 THE EQUIPMENT Mold for creating the drains cover We doest use the equipment for this project because we booking the product from the factories.

2.3 THE MATERIAL Fiber carbon

2.4 THE SURVEY Taman Chempaka Ipoh,Perak.

To be duly supervised by the under mentioned lecturer/s; Name : Date:

For project Coordinator use only:

Code:
Certified by: